Analisis Produktivitas Pekerja Dengan Metode Time Study Pada Pekerjaan Kolom (Studi Kasus Proyek Rehabilitasi Pasar Johar Kota Semarang) CK Sandi, N Cahyono, IT Husodo, PAP Suwandi Jurnal Teknik Sipil Giratory Upgris 1 (1), 1-10, 2020 | 12 | 2020 |
Value Engineering in The Implemetation of Kumkang Formwork (Case Study: The Alton Apartment Project in Semarang Indonesia) PAP Suwandi, IT Husodo, MW Suryadi Journal of Physics: Conference Series 1625 (1), 012012, 2020 | 5 | 2020 |
Analisa Perbandingan Produktivitas Tenaga Kerja Aktual Pada Pekerjaan Kolom Dengan Analisa Harga Satuan Pekerjaan (AHSP) A Setiawan, A Sulaksono, PAP Suwandi, IT Husodo Proceeding Science and Engineering National Seminar 5 (1), 275-282, 2020 | 5 | 2020 |
Perbandingan Sistem Pembiayaan Kontrak Proyek Dengananalisis Optimalisasi Linier Program IT Husodo JITEK (Jurnal Ilmiah Teknosains) 3 (1/Mei), 2017 | 4 | 2017 |
ANALISA PENGARUH AKTIVITAS PASAR TERHADAP KINERJA LALU LINTAS (Studi Kasus Pasar Godong, Kab. Grobogan) M Huda, IT Husodo, MD Rizani Jurnal Teknik Sipil Giratory UPGRIS 3 (1), 30-39, 2022 | 2 | 2022 |
Karakteristik Tanah Sedimen Banjir Kanal Timur Semarang Dengan Stabilisasi Semen Berdasarkan Uji Direct Shear IT HUSODO, I Ikhwanudin, F Yudaningrum Seminar Nasional Hasil Penelitian dan Pengabdian Kepada Masyarakat 2, 304-324, 2021 | 2 | 2021 |
Perencanaan Peningkatan Jalan Pecangaan–Damaran Kabupaten Jepara SA Khumairo, Y Musthofa, IT Husodo, S Budirahardjo Media Komunikasi Dunia Ilmu Sipil (MoDuluS) 1 (2), 60-66, 2019 | 2 | 2019 |
PENDAMPINGAN PEMASANGAN CERMIN CEMBUNG DI JALAN KYAI MORANG RAYA KELURAHAN PENGGARON KIDUL KOTA SEMARAMG IT Husodo, F Yudaningrum, A Wardani Seminar Nasional Hasil Penelitian dan Pengabdian Kepada Masyarakat 3, 343-348, 2022 | 1 | 2022 |
Pemanfaatan Batu Blondos Sungai Loning Desa Mluweh Kec. Ungaran Timur Kab. Semarang Sebagai Substitusi Agregat Pada Campuran Aspal Porous M Irfan, FR Kusuma, S Budirahardjo, IT Husodo Jurnal Teknik Sipil Giratory UPGRIS 3 (1), 45-56, 2022 | 1 | 2022 |
Risk Management Affecting the Cost and Time of the Structure Work Development Project of High-Level Building (A Case Study of the Alton Apartment Tembalang City Semarang Project) IT Husodo, PAP Suwandi, A Gunawan Journal of Physics: Conference Series 1625 (1), 012023, 2020 | 1 | 2020 |
Analisa Desain Pelebaran Perkerasan Lentur Pada Jalan Wolter Monginsidi Semarang T Trisno, AA Tegar, IT Husodo, S Budirahardjo Jurnal Teknik Sipil Giratory UPGRIS 1 (1), 40-48, 2020 | 1 | 2020 |
Perencanaan Jalur Lintasan Kereta Api Dengan Wesel Tipe R54 Pada Stasiun Prupuk TD Verdiana, A Firmansyah, IT Husodo, F Yudaningrum Proceeding Science and Engineering National Seminar 5 (1), 575-584, 2020 | 1 | 2020 |
ANALISIS PENGARUH SERBUK CANGKANG KERANG HIJAU SEBAGAI FINE AGREGAT TERHADAPKUAT TEKAN DAN KUAT LENTUR CAMPURAN BETO YW Setiawan, BA Septyawan, IT Husodo, S Budirahardjo Jurnal Teknik Sipil Giratory UPGRIS 1 (2), 98-106, 2020 | 1 | 2020 |
Re–design breakwater pelabuhan kartini jepara RE Saputra, T Masruroh, IT Husodo, F Yudaningrum Jurnal Teknik Sipil Giratory UPGRIS 1 (2), 76-85, 2020 | 1 | 2020 |
The Identification of River Flow Capacity using the HEC-RAS 1D Model: Case Study of Sringin River Downstreamdy of the Sringin River Downstream RC Afifah, IT Husodo, F Yudaningrum Aceh International Journal of Science and Technology 13 (2), 159-169, 2024 | | 2024 |
The Effect of Health Safety Environment (HSE) on The Productivity of Construction Workers in Wall and Plaster Work at DC MUI BOYOLALI MR Arahman, IT Husodo, PAP Suwandi, D Purnomo International Journal of Sustainable Building, Infrastructure and …, 2024 | | 2024 |
PERENCANAAN STRUKTUR & PONDASI GAS COMPRESSOR SHELTER STASIUN GAS BETUNG PENDOPO FIELD, PT. PERTAMINA EP ASSET 2 SUMATERA SELATAN P Triwidodo, A Kristiawan, IT Husodo Jurnal Teknik Sipil Giratory UPGRIS 5 (1), 56-69, 2024 | | 2024 |
EFEKTIVITAS PELAYANAN BUS RAPID TRANSIT (BRT) TRANS SEMARANG (KORIDOR MANGKANG-PENGGARON) MIA Nahar, MA Assehab, IT Husodo, MD Rizani Jurnal Teknik Sipil Giratory UPGRIS 5 (2), 113-122, 2024 | | 2024 |
Metode Kuat Tekan Beton Dalam Analisis Modulus Elastisitas Pengujian Campuran CTB (Cement Treated Base) Berbasis Android S Budirahardjo, S Wibowo, IT Husodo Seminar Nasional Hasil Penelitian dan Pengabdian Kepada Masyarakat 4, 14-32, 2023 | | 2023 |
FACTORS AFFECTING DELAYS IN THE CONSTRUCTION PROJECT OF 5 FLOOR PARKING BUILDING ROEMANI HOSPITAL, SEMARANG. B Lathif, PAP Suwandi, IT Husodo International Journal of Sustainable Building, Infrastructure and …, 2023 | | 2023 |