Fair profit contract for a carrier collaboration framework in a green hub network under soft time-windows: Dual lexicographic max–min approach AH Niknamfar, STA Niaki Transportation Research Part E: Logistics and Transportation Review 91, 129-151, 2016 | 43 | 2016 |
Robust optimization approach for an aggregate production–distribution planning in a three-level supply chain AH Niknamfar, STA Niaki, SHR Pasandideh The International Journal of Advanced Manufacturing Technology 76, 623-634, 2015 | 42 | 2015 |
Opposition-based learning for competitive hub location: a bi-objective biogeography-based optimization algorithm AH Niknamfar, STA Niaki, SAA Niaki Knowledge-Based Systems 128, 1-19, 2017 | 36 | 2017 |
An application of fuzzy-logic and grey-relational ANP-based SWOT in the ceramic and tile industry M Karimi, AH Niknamfar, STA Niaki Knowledge-Based Systems 163, 581-594, 2019 | 35 | 2019 |
Multi-objective production-distribution planning based on vendor-managed inventory strategy in a supply chain AH Niknamfar Industrial Management & Data Systems 115 (6), 1086-1112, 2015 | 35 | 2015 |
Lexicographic max–min approach for an integrated vendor-managed inventory problem SHR Pasandideh, STA Niaki, AH Niknamfar Knowledge-Based Systems 59, 58-65, 2014 | 30 | 2014 |
Multi-objective multi-facility green manufacturing closed-loop supply chain under uncertain environment B Karimi, AH Niknamfar, B Hassan Gavyar, M Barzegar, A Mohtashami Assembly Automation 39 (1), 58-76, 2019 | 25 | 2019 |
Analyzing the drivers of green manufacturing using an analytic network process method: A case study M Barzegar, R Ehtesham Rasi, AH Niknamfar International journal of research in industrial engineering 7 (1), 61-83, 2018 | 24 | 2018 |
A binary-continuous invasive weed optimization algorithm for a vendor selection problem AH Niknamfar, STA Niaki Knowledge-Based Systems 140, 158-172, 2018 | 23 | 2018 |
A vendor-managed inventory system considering the redundancy allocation problem and carbon emissions M Karimi, AH Niknamfar International Journal of Management Science and Engineering Management 12 (4 …, 2017 | 20 | 2017 |
Two-stage single period inventory management for a manufacturing vendor under green-supplier supply chain M Karimi, AH Niknamfar, SHR Pasandideh International Journal of System Assurance Engineering and Management 8, 704-718, 2017 | 16 | 2017 |
Soft time-windows for a bi-objective vendor selection problem under a multi-sourcing strategy: Binary-continuous differential evolution AH Niknamfar, STA Niaki Computers & Operations Research 76, 43-59, 2016 | 16 | 2016 |
An integrated production-distribution planning with a routing problem and transportation cost discount in a supply chain B Karimi, M Ghare Hassanlu, AH Niknamfar Assembly Automation 39 (5), 783-802, 2019 | 15 | 2019 |
A fuzzy multi-objective model for a cellular manufacturing system with layout designing in a dynamic condition A Mohtashami, A Alinezhad, AH Niknamfar International Journal of Industrial and Systems Engineering 34 (4), 514-543, 2020 | 10 | 2020 |
A newsboy problem for an inventory system under an emergency order: a modified invasive weed optimization algorithm M Karimi, SHR Pasandideh, AH Niknamfar International Journal of Management Science and Engineering Management 12 (2 …, 2017 | 7 | 2017 |
Multi-objective optimization of job shops with automated guided vehicles: A non-dominated sorting cuckoo search algorithm B Karimi, STA Niaki, AH Niknamfar, MG Hassanlu Proceedings of the Institution of Mechanical Engineers, Part O: Journal of …, 2021 | 5 | 2021 |
A bi-objective optimization for vendor managed inventory model AH Niknamfar, SHR Pasandideh Journal of Optimization in Industrial Engineering 7 (15), 37-45, 2014 | 5 | 2014 |
Stochastic ensemble pruning method via simulated quenching walking ZS Taghavi, STA Niaki, AH Niknamfar International Journal of Machine Learning and Cybernetics 10 (7), 1875-1892, 2019 | 4 | 2019 |
A series-parallel inventory-redundancy green allocation system using a max-min approach via the interior point method AH Niknamfar, SAA Niaki, M Karimi Assembly Automation 38 (3), 323-335, 2018 | 4 | 2018 |
Generating a structural lightweight concrete AH Niknamfar, S Eesapoor Proc. 3rd International Conference of Science and Engineering in the …, 2017 | 4 | 2017 |