An efficient buffer design algorithm for production line profit maximization C Shi, SB Gershwin International Journal of Production Economics 122 (2), 725-740, 2009 | 138 | 2009 |
Interpolation of continuous micro line segment trajectories based on look-ahead algorithm in high-speed machining P Ye, C Shi, K Yang, Q Lv The International Journal of Advanced Manufacturing Technology 37, 881-897, 2008 | 69 | 2008 |
Study on S-shape curve acceleration and deceleration control on NC system C Shi, T Zhao, P Ye, Q Lv Zhongguo Jixie Gongcheng/China Mechanical Engineering 18 (12), 1421-1425, 2007 | 58* | 2007 |
A segmentation approach for solving buffer allocation problems in large production systems C Shi, SB Gershwin International Journal of Production Research 54 (20), 6121-6141, 2016 | 49 | 2016 |
Smooth Transfer Control Algorithm of Continuous Segment Trajectory in CNC System K Yang, C Shi, P Ye, Q Lv Journal Of Tsinghua University (Science and Technology) 47 (8), 1295-1299, 2007 | 40* | 2007 |
Part waiting time distribution in a two-machine line C Shi, SB Gershwin Information Control Problems in Manufacturing 14 (1), 457-462, 2012 | 24 | 2012 |
The look-ahead function-based interpolation algorithm for continuous micro-line trajectories C Shi, P Ye The International Journal of Advanced Manufacturing Technology 54, 649-668, 2011 | 24 | 2011 |
Part sojourn time distribution in a two-machine line C Shi, SB Gershwin European Journal of Operational Research 248 (1), 146-158, 2016 | 16 | 2016 |
Improvement of the evaluation of closed-loop production systems with unreliable machines and finite buffers C Shi, SB Gershwin Computers & Industrial Engineering 75, 239-256, 2014 | 16 | 2014 |
Study on S-shape curve acceleration and deceleration control on NC system S Chuan, Z Tong, Y Peiqing, L Qiang China Mechanical Engineering 18 (12), 1421-1425, 2007 | 15 | 2007 |
Study on End-point Discrimination Methods of Circular Interpolation B Lin, C Shi, H Zhang, P Ye Manufacturing Technology & Machine Tool, 86 - 90, 2007 | 14* | 2007 |
The recycle model of printed circuit board and its economy evaluation Q Niu, D Xiang, X Liu, G Duan, C Shi Proceedings of the 2007 IEEE International Symposium on Electronics and the …, 2007 | 10 | 2007 |
Look-ahead Feedrate Plan Method Based on the Requirement of Real Time and Its Experimental Study Q Lv, H Zhang, K Yang, C Shi, H Lu Machine Tool & Hydraulics 36 (4), 1-4, 2008 | 8* | 2008 |
The practical study of the professional but non-required courses P Ye, C Shi, H Zhang Experimental Technology and Management 24 (4), 100 - 103, 2007 | 8* | 2007 |
The segmentation method for long line optimization C Shi, SB Gershwin Proceedings of the 8th international conference in stochastic models of …, 2011 | 7 | 2011 |
Lead time distribution of three-machine two-buffer lines with unreliable machines and finite buffers C Shi, S Gershwin 10th Conference on Stochastic Models of Manufacturing and Service Operations …, 2015 | 6 | 2015 |
Study on control algorithm for continuous segments trajectory interpolation C Shi, P Ye, Q Lv Journal of Wuhan University of Technology 28 (suppl 1), 2006 | 6 | 2006 |
Improving financial services data quality–a financial company practice C Shi, R Jugulum, HI Joyce, J Singh, B Granese, R Ramachandran, ... International Journal of Lean Six Sigma 6 (2), 98-110, 2015 | 4 | 2015 |
The look-ahead based adaptive motion control for high-speed machining of complicated contours C Shi, P Ye, K Yang, Q Lv 2007 IEEE International Symposium on Assembly and Manufacturing, 31-37, 2007 | 4 | 2007 |
A composite four-factor model in China X Lian, C Shi Available at SSRN 3928587, 2021 | 3 | 2021 |