Causes of delay in building construction projects in Egypt ME Abd El-Razek, HA Bassioni, AM Mobarak Journal of construction engineering and management 134 (11), 831-841, 2008 | 826 | 2008 |
Performance measurement in construction HA Bassioni, ADF Price, TM Hassan Journal of management in engineering 20 (2), 42-50, 2004 | 636 | 2004 |
Building a conceptual framework for measuring business performance in construction: an empirical evaluation HA Bassioni, ADF Price, TM Hassan Construction management and economics 23 (5), 495-507, 2005 | 266 | 2005 |
Adaptation to a changing climate in the Arab Countries : A Case for Adaptation Governance and Leadership in Building Climate Resilience D Verner | 182 | 2012 |
Evaluation and analysis of criteria and sub‐criteria of a construction excellence model HA Bassioni, TM Hassan, ADF Price Engineering, Construction and Architectural Management 15 (1), 21-41, 2008 | 88 | 2008 |
Improving RCPSP solutions quality with Stacking Justification–Application with particle swarm optimization A Fahmy, TM Hassan, H Bassioni Expert Systems with Applications 41 (13), 5870-5881, 2014 | 67 | 2014 |
Soil improvement techniques M Gaafer, H Bassioni, T Mostafa Int. J. Sci. Eng. Res 6 (12), 217-222, 2015 | 55 | 2015 |
Factors affecting safety performance in large construction contractors in Egypt I Abdul-Rashid, H Bassioni, F Bawazeer Proceedings of 23rd Annual ARCOM Conference 3 (5), 661-670, 2007 | 52 | 2007 |
Estimating the standardized regression coefficients of design variables in daylighting and energy performance of buildings in the face of multicollinearity AS Allam, HA Bassioni, W Kamel, M Ayoub Solar Energy 211, 1184-1193, 2020 | 27 | 2020 |
Investigation into the causes of claims in Egyptian building construction ME Abd El-Razek, H Bassioni, W Abd El-Salam Proc., 23rd Annual ARCOM Conf., Belfast, UK, 147-156, 2007 | 22 | 2007 |
A framework for measuring business performance in construction contracting organisations HA Bassioni © Hesham Ahmed Bassioni, 2004 | 19 | 2004 |
Photovoltaic systems in existing residential building in Egypt A El-Menchawy, H Bassioni, AA Farouk International Journal of Scientific and Engineering Research 2 (7), 2011 | 13 | 2011 |
Dynamic scheduling model for the construction industry A Fahmy, T Hassan, H Bassioni, R McCaffer Built Environment Project and Asset Management 10 (3), 313-330, 2020 | 11 | 2020 |
Theoretical formulation of a framework for measuring business performance in construction HA Bassioni, ADF Price, TM Hassan Loughborough University, 2016 | 10 | 2016 |
Time series analysis for the prediction of RC material components prices in Egypt HA Bassioni, MI Elmasry, AM Ragheb, AA Youssef Proceedings of the 28th Annual ARCOM Conference, Edinburg, UK, Association …, 2012 | 8 | 2012 |
Avoiding claims in Egyptian construction projects: A quantitative survey HA Bassioni, MEA El-Razek, WAA El-Salam Proc., 3rd Int. Conf. on Engineering, Project and Product Management, EPPM, 2012 | 8 | 2012 |
Optimization of construction logistics planning cost in Egypt using genetic algorithms M Shamma, KM Shawki, HA Bassioni J Inform Tech Softw Eng 7 (4), 205, 2017 | 7 | 2017 |
Metaheuristic optimization of daylighting and energy performances in office spaces AS Allam, HA Bassioni, W Kamel, M Ayoub IOP Conference Series: Earth and Environmental Science 397 (1), 012009, 2019 | 6 | 2019 |
Questionnaire survey on dynamic scheduling in construction A Fahmy, TM Hassan, H Bassioni PM World J 5 (3), 1-20, 2014 | 6 | 2014 |
The development of a comprehensive framework for measuring business performance in construction HA Bassioni, A Price, T Hassan Loughborough University, 2003 | 6 | 2003 |