关注
Mohamed Aly Louly
Mohamed Aly Louly
Professeur à l'Ecole Supérieure Polytechnique de Nouakchott
在 esp.mr 的电子邮件经过验证
标题
引用次数
引用次数
年份
A reactive GRASP and path relinking for a combined production–distribution problem
M Boudia, MAO Louly, C Prins
Computers & Operations Research 34 (11), 3402-3419, 2007
2852007
A model for supply planning under lead time uncertainty
A Dolgui, MA Ould-Louly
International Journal of Production Economics 78 (2), 145-152, 2002
1962002
Fast heuristics for a combined production planning and vehicle routing problem
M Boudia, MAO Louly, C Prins
Production Planning and Control 19 (2), 85-96, 2008
1002008
Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint
MA Louly, A Dolgui
International Journal of Production Economics 143 (1), 35-40, 2013
922013
A state of the art on supply planning and inventory control under lead time uncertainty
A Dolgui, OB Ammar, F Hnaien, MA Louly
Studies in Informatics and Control 22 (3), 255-268, 2013
892013
Supply planning for single-level assembly system with stochastic component delivery times and service-level constraint
MA Louly, A Dolgui, F Hnaien
International Journal of Production Economics 115 (1), 236-247, 2008
852008
Optimal supply planning in MRP environments for assembly systems with random component procurement times
MA Louly, A Dolgui, F Hnaien
International Journal of Production Research 46 (19), 5441-5467, 2008
842008
The MPS parameterization under lead time uncertainty
MA Ould-Louly, A Dolgui
International Journal of Production Economics 90 (3), 369-376, 2004
812004
Calculating safety stocks for assembly systems with random component procurement lead times: A branch and bound algorithm
MAO Louly, A Dolgui
European Journal of Operational Research 199 (3), 723-731, 2009
582009
Generalized newsboy model to compute the optimal planned lead times in assembly systems
MA Ould-Louly, A Dolgui
International Journal of Production Research 40 (17), 4401-4414, 2002
572002
A goal programming model for staff scheduling at a telecommunications center
MAO Louly
Journal of Mathematical Modelling and Algorithms in Operations Research 12 …, 2013
412013
Optimal time phasing and periodicity for MRP with POQ policy
MA Louly, A Dolgui
International Journal of Production Economics 131 (1), 76-86, 2011
412011
Planned lead time optimization in material requirement planning environment for multilevel production systems
F Hnaien, A Dolgui, MA Ould Louly
Journal of Systems Science and Systems Engineering 17, 132-155, 2008
382008
Decomposition approach for a problem of lot-sizing and sequencing under uncertainties
A Dolgui, G Levin, MA Louly
International Journal of Computer Integrated Manufacturing 18 (5), 376-385, 2005
352005
Newsboy model for supply planning of assembly systems
MA Louly, A Dolgui
International Journal of Production Research 40 (2002), 4401-4414, 2002
322002
Planetary milling parameters optimization for the production of ZnO nanocrystalline
OM Lemine, MA Louly, AM Al-Ahmari
International Journal of Physical Sciences 5 (17), 2721-2729, 2010
292010
Combined optimization of production and distribution
M Boudia, MAO Louly, C Prins
IESM'05, 2005
262005
Optimal MRP offsetting for assembly systems with stochastic lead times: POQ policy and service level constraint
MA Louly, A Dolgui, A Al-Ahmari
Journal of Intelligent Manufacturing 23, 2485-2495, 2012
232012
A memetic algorithm with population management for a production-distribution problem
M Boudia, MAO Louly, C Prins
IFAC Proceedings Volumes 39 (3), 541-546, 2006
222006
Balancing of transfer lines with simultaneously activated spindles
A Dolgui, N Guschinsky, G Levin, MA Louly, S Belmokhtar
IFAC Proceedings Volumes 37 (4), 45-50, 2004
192004
系统目前无法执行此操作,请稍后再试。
文章 1–20