An Investigation of Building Seismic Design Parameters in Mataram City Using Lombok Earthquake 2018 Ground Motion. NN Kencanawati, DS Agustawijaya, RM Taruna Journal of Engineering & Technological Sciences 52 (5), 2020 | 21 | 2020 |
An update to seismic hazard levels and PSHA for Lombok and surrounding islands after earthquakes in 2018 DS Agustawijaya, RM Taruna, AR Agustawijaya Bulletin of the New Zealand Society for Earthquake Engineering 53 (4), 215-226, 2020 | 14 | 2020 |
Earthquake relocation using double difference method for 2d modelling of subducting slab and back arc thrust in West Nusa Tenggara RM Taruna, VH Banyunegoro Jurnal Penelitian Fisika dan Aplikasinya (JPFA) 8 (2), 132-143, 2018 | 13 | 2018 |
Peak ground acceleration at surface for Mataram city with a return period of 2500 years using probabilistic method RM Taruna, VH Banyunegoro, G Daniarsyad MATEC Web of Conferences 195, 03019, 2018 | 13 | 2018 |
Earthquake forces on the stability of the Meninting diversion tunnel design based on current seismic conditions of Lombok Island DS Agustawijaya, RM Taruna, AR Agustawijaya Indonesian Journal on Geoscience 9 (1), 105-117, 2022 | 9 | 2022 |
Penentuan Rumus Percepatan Tanah akibat Gempabumi di Kota Mataram Menggunakan Metode Euclidean Distance RM Taruna, TAP Setiadi JST (Jurnal Sains dan Teknologi) 9 (1), 20-29, 2020 | 6 | 2020 |
Perkiraan ketinggian objek alam terhadap horizon untuk evaluasi lokasi pengamatan hilal di Lombok RM Taruna, TA Prakoso Jurnal Penelitian Fisika Dan Aplikasinya (JPFA) 7 (2), 115-122, 2017 | 5 | 2017 |
Penentuan ground motion prediction equations (GMPEs) dengan metode euclidean dan likelihood untuk wilayah Jawa Timur S Rohadi, RM Taruna, A Rudyanto, DT Heryanto Jurnal Meteorologi dan Geofisika 17 (3), 2016 | 4 | 2016 |
Konversi Empiris Summary Magnitude, Local Magnitude, Body-Wave Magnitude, Surface Magnitude, dan Moment Magnitude Menggunakan Data Gempabumi 1922-2020 di Nusa Tenggara Barat RM Taruna, A Pratiwi Jurnal Sains Teknologi dan Lingkungan 7 (1), 1-12, 2021 | 3 | 2021 |
Prediksi Curah Hujan Bulanan Di Wilayah Lombok Barat Menggunakan Principal Component Regression (PCR) A Pratiwi, RM Taruna, S Agustiarini, DSA Wibowo Jurnal Teori dan Aplikasi Fisika, 175-182, 2020 | 3 | 2020 |
Pengukuran Kecepatan Gelombang Seismik Menggunakan Metode Refraksi Pada Lapisan Tanah Dangkal AM Julius, RM Taruna, SYS Putra, PKG Arta, BFAR Negara, A Yullatifah, ... Geodika: Jurnal Kajian Ilmu dan Pendidikan Geografi 4 (1), 22-31, 2020 | 3 | 2020 |
Pemilihan Ground Motion Model di Wilayah Jawa Menggunakan Data Percepatan Tanah Tahun 2010-2021 RM Taruna, A Octhav, AN Rachman, MT Gunawan, S Sulastri, S Rohadi, ... JST (Jurnal Sains dan Teknologi) 11 (1), 29-37, 2022 | 2 | 2022 |
STUDI SEISMOTEKTONIK NUSA TENGGARA BARAT MENGGUNAKAN DATA GEMPA TAHUN 1922-2021 IGKS Bunaga, RM Taruna AGREGAT 6 (2), 2021 | 2 | 2021 |
Identification of 13th July 2019 Sumbawa earthquake source using double difference method RM Taruna, DI Irianti, A Septiadhi, A Pratiwi Proceeding International Conference on Science (ICST) 2, 377-384, 2021 | 2 | 2021 |
RELOKASI DAN KLASIFIKASI GEMPABUMI UNTUK DATABASE STRONG GROUND MOTION DI WILAYAH JAWA TIMUR R Mahendra, FNU Supriyanto, A Rudyanto Jurnal Meteorologi Klimatologi dan Geofisika 3 (3), 46-51, 2016 | 2 | 2016 |
Preliminary Assessment of Liquefaction Vulnerability using Microtremor Analysis in North Lombok RM Taruna, A Septiadhi, LZ Mase Journal of Physics: Conference Series 2866 (1), 012061, 2024 | 1 | 2024 |
Percepatan Tanah Maksimum di Permukaan pada Wilayah DKI Jakarta Menggunakan Metode Probabilistik TAP Setiadi, AR Hakim, RM Taruna, S Rohadi, P Susilanto Jurnal Meteorologi dan Geofisika 21 (2), 81-90, 2021 | 1 | 2021 |
Attenuation relation for strong motion in Eastern Java based on appropriate database and method R Mahendra, S Rohadi, A Rudyanto AIP Conference Proceedings 1857 (1), 080002, 2017 | 1 | 2017 |
Preliminary liquefaction potential investigation of North Lombok sand based on grain size and particle shape RM Taruna, LZ Mase Journal of Physics: Conference Series 2900 (1), 012006, 2024 | | 2024 |
PRELIMINARY CONCEPT AS EARLY STEP DEVELOPMENT OF GMPE BACK ARC THRUST-WEST NUSATENGGARA, INDONESIA IGKS Bunaga, S Pramono, RM Taruna, D Istiqomah, A Septiadhi, ... | | 2021 |