关注
Fatima BENBOUZID-SI TAYEB
标题
引用次数
引用次数
年份
Tracking community evolution in social networks: A survey
N Dakiche, FBS Tayeb, Y Slimani, K Benatchba
Information Processing & Management 56 (3), 1084-1102, 2019
1712019
A hybridization of genetic algorithms and fuzzy logic for the single-machine scheduling with flexible maintenance problem under human resource constraints
M Touat, S Bouzidi-Hassini, F Benbouzid-Sitayeb, B Benhamou
Applied Soft Computing 59, 556-573, 2017
492017
Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: a resolution with sequential and integrated strategies
F Benbouzid-Sitayeb, SA Guebli, Y Bessadi, C Varnier, N Zerhouni
International Journal of Manufacturing Research 6 (1), 30-48, 2011
462011
Considering human resource constraints for real joint production and maintenance schedules
S Bouzidi-Hassini, FBS Tayeb, F Marmier, M Rabahi
Computers & Industrial Engineering 90, 197-211, 2015
422015
A hybrid of variable neighbor search and fuzzy logic for the permutation flowshop scheduling problem with predictive maintenance
A Ladj, FBS Tayeb, C Varnier, AA Dridi, N Selmane
Procedia Computer Science 112, 663-672, 2017
372017
An immunity-based hybrid genetic algorithms for permutation flowshop scheduling problems
M Bessedik, F Benbouzid-Si Tayeb, H Cheurfi, A Blizak
The International Journal of Advanced Manufacturing Technology 85, 2459-2469, 2016
332016
IPro-GA: an integrated prognostic based GA for scheduling jobs and predictive maintenance in a single multifunctional machine
A Ladj, C Varnier, FBS Tayeb
IFAC-PapersOnLine 49 (12), 1821-1826, 2016
322016
Resolution of joint maintenance/production scheduling by sequential and integrated strategies
F Benbouzid, C Varnier, N Zerhouni
Artificial Neural Nets Problem Solving Methods: 7th International Work …, 2003
322003
Community evolution prediction in dynamic social networks using community features' change rates
N Dakiche, FBS Tayeb, Y Slimani, K Benatchba
Proceedings of the 34th ACM/SIGAPP symposium on applied computing, 2078-2085, 2019
222019
Research on permutation flow-shop scheduling problem based on improved genetic immune algorithm with vaccinated offspring
FBS Tayeb, M Bessedik, M Benbouzid, H Cheurfi, A Blizak
Procedia computer science 112, 427-436, 2017
202017
A multi-agent scheduling approach for the joint scheduling of jobs and maintenance operations in the flow shop sequencing problem
SL Khelifati, F Benbouzid-Sitayeb
Computational Collective Intelligence. Technologies and Applications: Third …, 2011
202011
Game theory-based integration of scheduling with flexible and periodic maintenance planning in the permutation flowshop sequencing problem
F Benbouzid-Si Tayeb, K Benatchba, AE Messiaid
Operational Research 18, 221-255, 2018
192018
An efficient hybrid multi-objective memetic algorithm for the frequency assignment problem
M Bessedik, F Benbouzid-SiTayeb, MR Keddar
Engineering Applications of Artificial Intelligence 87, 103265, 2020
172020
Exact and heuristic algorithms for post prognostic decision in a single multifunctional machine
A Ladj, C Varnier, FBS Tayeb, N Zerhouni
International Journal of Prognostics and Health Management 8 (2), 2017
172017
An integrated prognostic based hybrid genetic-immune algorithm for scheduling jobs and predictive maintenance
A Ladj, FBS Tayeb, C Varnier
2016 IEEE Congress on Evolutionary Computation (CEC), 2083-2089, 2016
152016
An effective multi-objective hybrid immune algorithm for the frequency assignment problem
F Benbouzid-SiTayeb, M Bessedik, MR Keddar
Applied Soft Computing 85, 105797, 2019
122019
Sensitive analysis of timeframe type and size impact on community evolution prediction
N Dakiche, FBS Tayeb, Y Slimani, K Benatchba
2018 IEEE international conference on fuzzy systems (FUZZ-IEEE), 1-8, 2018
122018
An effective heuristic for the single-machine scheduling problem with flexible maintenance under human resource constraints
M Touat, FBS Tayeb, B Benhamou
Procedia Computer Science 126, 1395-1404, 2018
122018
Applying ant colony optimization for the joint production and preventive maintenance scheduling problem in the flowshop sequencing problem
F Benbouzid-Sitayeb, I Ammi, C Varnier, N Zerhouni
2008 3rd International Conference on Information and Communication …, 2008
122008
Résolution du problème de l’ordonnancement conjoint maintenance/production par la stratégie séquentielle
F Benbouzid, Y Bessadi, S Guebli, C Varnier, N Zerhouni
4e Conférence Francophone de Modélisation et de SIMulation MOSIM 3, 2003
122003
系统目前无法执行此操作,请稍后再试。
文章 1–20