Progressive 3D reconstruction of infrastructure with videogrammetry I Brilakis, H Fathi, A Rashidi Automation in Construction 20 (7), 2011 | 256 | 2011 |
A review on the applications of porous materials in solar energy systems S Rashidi, JA Esfahani, A Rashidi Renewable and Sustainable Energy Reviews 73, 1198-1210, 2017 | 207 | 2017 |
Comparison of Image-Based and Time-of-Flight-Based Technologies for Three Dimensional Reconstruction of Infrastructure F Dai, A Rashidi, I Brilakis, P Vela Journal of Construction Engineering and Management 139 (1), 69-79, 2013 | 196 | 2013 |
Achievements and Challenges in Vision-Based Inspection of Large Concrete Structures C Koch, S German, A Rashidi, Z Zhu, M König, I Brilakis Proceedings of the 1st International Conference on Performance-Based and …, 2012 | 167* | 2012 |
Automated methods for activity recognition of construction workers and equipment: State-of-the-art review B Sherafat, CR Ahn, R Akhavian, AH Behzadan, M Golparvar-Fard, H Kim, ... Journal of Construction Engineering and Management 146 (6), 03120002, 2020 | 158 | 2020 |
Activity analysis of construction equipment using audio signals and support vector machines CF Cheng, A Rashidi, MA Davenport, DV Anderson Automation in Construction 81, 240-253, 2017 | 142 | 2017 |
Neurofuzzy Genetic System for Selection of Construction Project Managers A Rashidi, F Jazebi, Brilakis ASCE Journal of Construction Engineering and Management 137 (1), 17-29, 2011 | 121 | 2011 |
An analogy between various machine-learning techniques for detecting construction materials in digital images A Rashidi, MH Sigari, M Maghiar, D Citrin KSCE Journal of Civil Engineering 20, 1178-1188, 2016 | 94 | 2016 |
Selection of Project Managers in Construction Firms Using AHP and Fuzzy TOPSIS: A Case Study F Torfi, A Rashidi Journal of Construction in Developing Countries 16 (1), 2011 | 68 | 2011 |
Optimized Selection of Key Frames for Monocular Videogrammetric Surveying of Civil Infrastructure A Rashidi, F Dai, I Brilakis, P Vela Journal of Advanced Engineering Informatics, 2013 | 65 | 2013 |
An Automated Procedure for Selecting Project Managers in Construction Firms F Jazebi, A Rashidi Journal of Civil Engineering and Management 19 (1), 2013 | 65 | 2013 |
Evidence-driven sound detection for prenotification and identification of construction safety hazards and accidents YC Lee, M Shariatfar, A Rashidi, HW Lee Automation in Construction 113, 103127, 2020 | 64 | 2020 |
Innovative stereo vision-based approach to generate dense depth map of transportation infrastructure A Rashidi, H Fathi, I Brilakis Transportation research record 2215 (1), 93-99, 2011 | 64 | 2011 |
Productivity estimation of bulldozers using generalized linear mixed models A Rashidi, HR Nejad, M Maghiar KSCE journal of civil engineering 18, 1580-1589, 2014 | 63 | 2014 |
Generating absolute-scale point cloud data of built infrastructure scenes using a monocular camera setting A Rashidi, I Brilakis, P Vela Journal of Computing in Civil Engineering, 2015 | 60 | 2015 |
An Improved Convolutional Neural Network System for Automatically Detecting Rebar in GPR Data Z Xiang, A Rashidi, G Ou Computing in Civil Engineering 2019, 2019 | 51 | 2019 |
Using Unmanned Aerial Systems for Automated Fall Hazard Monitoring M Gheisari, A Rashidi, B Esmaeili Construction Research Congress 2018, 2018 | 47 | 2018 |
A hybrid kinematic-acoustic system for automated activity detection of construction equipment B Sherafat, A Rashidi, YC Lee, CR Ahn Sensors 19 (19), 4286, 2019 | 38 | 2019 |
Audio-based bayesian model for productivity estimation of cyclic construction activities C Sabillon, A Rashidi, B Samanta, MA Davenport, DV Anderson Journal of computing in civil engineering 34 (1), 04019048, 2020 | 37 | 2020 |
Highway asset and pavement condition management using mobile photogrammetry M Farhadmanesh, C Cross, AH Mashhadi, A Rashidi, J Wempen Transportation Research Record 2675 (9), 296-307, 2021 | 35 | 2021 |