Optimal construction and rebalancing of index-tracking portfolios O Strub, P Baumann European journal of operational research 264 (1), 370-387, 2018 | 74 | 2018 |
Portfolio-optimization models for small investors P Baumann, N Trautmann Mathematical Methods of Operations Research 77, 345-356, 2013 | 46 | 2013 |
A comparative study of the leading machine learning techniques and two new optimization algorithms P Baumann, DS Hochbaum, YT Yang European journal of operational research 272 (3), 1041-1057, 2019 | 44* | 2019 |
A hybrid method for large-scale short-term scheduling of make-and-pack production processes P Baumann, N Trautmann European Journal of Operational Research 236 (2), 718-735, 2014 | 43 | 2014 |
A continuous-time MILP model for short-term scheduling of make-and-pack production processes P Baumann, N Trautmann International Journal of Production Research 51 (6), 1707-1727, 2013 | 43 | 2013 |
Sparse computation for large-scale data mining DS Hochbaum, P Baumann IEEE Transactions on Big Data 2 (2), 151-174, 2016 | 35 | 2016 |
A matheuristic for large-scale capacitated clustering M Gnägi, P Baumann Computers & operations research 132, 105304, 2021 | 34 | 2021 |
Resource-allocation capabilities of commercial project management software: an experimental analysis N Trautmann, P Baumann 2009 International Conference on Computers & Industrial Engineering, 1143-1148, 2009 | 22 | 2009 |
Optimal scheduling of work-content-constrained projects P Baumann, N Trautmann 2013 IEEE international conference on industrial engineering and engineering …, 2013 | 18 | 2013 |
Planning of a make-to-order production process in the printing industry P Baumann, S Forrer, N Trautmann Flexible Services and Manufacturing Journal 27, 534-560, 2015 | 17 | 2015 |
The resource-constrained project scheduling problem with work-content constraints P Baumann, CU Fündeling, N Trautmann Handbook on Project Management and Scheduling Vol. 1, 533-544, 2015 | 15 | 2015 |
A binary linear programming-based k-means algorithm for clustering with must-link and cannot-link constraints P Baumann 2020 IEEE international conference on industrial engineering and engineering …, 2020 | 13 | 2020 |
A matheuristic for a customer assignment problem in direct marketing T Bigler, M Kammermann, P Baumann European Journal of Operational Research 304 (2), 689-708, 2023 | 12 | 2023 |
Resource-constrained scheduling of a real project from the construction industry: A comparison of software packages for project management N Trautmann, P Baumann 2009 IEEE International Conference on Industrial Engineering and Engineering …, 2009 | 10 | 2009 |
A binary linear programming-based k-means approach for the capacitated centered clustering problem P Baumann 2019 IEEE International Conference on Industrial Engineering and Engineering …, 2019 | 9 | 2019 |
Sparse-reduced computation P Baumann, DS Hochbaum, Q Spaen Proceedings of the 5th international conference on pattern recognition …, 2016 | 9 | 2016 |
Project scheduling with precedence constraints and scarce resources: an experimental analysis of commercial project management software N Trautmann, P Baumann Operations Research Proceedings 2008: Selected Papers of the Annual …, 2009 | 8 | 2009 |
Investigation of the Influencing Parameters Using Optimized Exhaust Emissions Measurement Systems with Different Modern Plug-in Hybrid Electrical Vehicles P Baumann, M Schroeder, H Kurz, T Maier, W Thiel, U Strehl SAE Technical Paper, 2015 | 6 | 2015 |
A continuous-time MILP to compute schedules with minimum changeover times for a make-and-pack production P Baumann, N Trautmann Computer Aided Chemical Engineering 29, 1060-1064, 2011 | 6 | 2011 |
An iterative backward/Forward Technique for the scheduling of resource-constrained projects within Microsoft Project N Trautmann, P Baumann 2010 IEEE International Conference on Industrial Engineering and Engineering …, 2010 | 6 | 2010 |