The joint economic lot sizing problem: Review and extensions M Ben-Daya, M Darwish, K Ertogral European Journal of Operational Research 185 (2), 726-742, 2008 | 366 | 2008 |
Production and shipment lot sizing in a vendor–buyer supply chain with transportation cost K Ertogral, M Darwish, M Ben-Daya European Journal of Operational Research 176 (3), 1592-1606, 2007 | 229 | 2007 |
Auction-theoretic coordination of production planning in the supply chain K Ertogral, SD Wu IIE transactions 32 (10), 931-940, 2000 | 229 | 2000 |
A simulated annealing heuristic for the dynamic layout problem with budget constraint R Şahin, K Ertoğral, O Türkbey Computers & Industrial Engineering 59 (2), 308-313, 2010 | 100 | 2010 |
Developing staff schedules for a bilingual telecommunication call center with flexible workers K Ertogral, B Bamuqabel Computers & Industrial Engineering 54 (1), 118-127, 2008 | 59 | 2008 |
A bargaining game for supply chain contracting K Ertogral, SD Wu preprint, 2001 | 56 | 2001 |
Multi-item single source ordering problem with transportation cost: A Lagrangian decomposition approach K Ertogral European Journal of Operational Research 191 (1), 156-165, 2008 | 53 | 2008 |
An integrated production scheduling and workforce capacity planning model for the maintenance and repair operations in airline industry K Ertogral, FS Öztürk Computers & industrial engineering 127, 832-840, 2019 | 35 | 2019 |
Replenish-up-to inventory control policy with random replenishment intervals K Ertogral, MA Rahim International Journal of Production Economics 93, 399-405, 2005 | 35 | 2005 |
Coordination production and transportation scheduling in the supply chain K Ertogral, SD Wu, LI Burke Lehigh University, 1998 | 32 | 1998 |
Overhaul planning and exchange scheduling for maintenance services with rotable inventory and limited processing capacity M Erkoc, K Ertogral Computers & Industrial Engineering 98, 30-39, 2016 | 28 | 2016 |
A fix-and-optimize heuristic for the integrated fleet sizing and replenishment planning problem with predetermined delivery frequencies NK Dastjerd, K Ertogral Computers & Industrial Engineering 127, 778-787, 2019 | 14 | 2019 |
Vendor-buyer lot sizing problem with stochastic demand: an exact procedure under service level approach K Ertogral European Journal of Industrial Engineering 5 (1), 101-110, 2011 | 14 | 2011 |
Modelling and analysis of a strategic fleet sizing problem for a furniture distributor K Ertogral, A Akbalik, S González European Journal of Industrial Engineering 11 (1), 49-77, 2017 | 10 | 2017 |
A production scheduling model and analysis for the maintenance repair and overhaul service providers K Ertoğral, M Erkoc, DH Ulker Gazi Univ, Fac Engineering Architecture, 2015 | 8 | 2015 |
Integrating Production and Transportation Logistics in Supply Chain Environment: A Lagrangean Decomposition Approach K Ertogral, SD Wu, LI Burke IMSE Technical Reprot 98T 10, 1998 | 4 | 1998 |
Transforming challenges into opportunities for Qatar’s food industry: self-sufficiency, sustainability, and global food trade diversification N Al-Abdelmalek, M Kucukvar, NC Onat, E Fares, H Ayad, ME Bulak, ... Sustainability 15 (7), 5755, 2023 | 3 | 2023 |
Replenish-up-to inventory control policy with random replenishment intervals MA Rahim, K Ertogral International Journal of Production Economics 93 (94), 399-405, 2005 | 3 | 2005 |
An Improved Approximate Dynamic Programming Method for The Integrated Fleet Sizing and Replenishment Planning Problem with Predetermined Delivery Frequencies D Aghazadeh, K Ertogral IFAC-PapersOnLine 55 (10), 3034-3039, 2022 | 2 | 2022 |
Integrated production, inventory, and transportation planning in two-layer supply chain K Ertogral, M Darwish, M Ben-Daya The 6th Saudi Engineering Conference. KFUPM, Dhahran, Dec., 439, 2002 | 2 | 2002 |