Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates K Altendorfer, S Minner European Journal of Operational Research 213 (1), 134-146, 2011 | 53 | 2011 |
Flexible model for analyzing production systems with discrete event simulation A Hübl, K Altendorfer, H Jodlbauer, M Gansterer, RF Hartl Proceedings of the 2011 Winter Simulation Conference (WSC), 1554-1565, 2011 | 52 | 2011 |
An analytical model for service level and tardiness in a single machine MTO production system K Altendorfer, H Jodlbauer International Journal of Production Research 49 (7), 1827-1850, 2011 | 52 | 2011 |
Effects of forecast errors on optimal utilisation in aggregate production planning with stochastic customer demand K Altendorfer, T Felberbauer, H Jodlbauer International Journal of Production Research 54 (12), 3718-3735, 2016 | 44 | 2016 |
A comparison of make-to-stock and make-to-order in multi-product manufacturing systems with variable due dates K Altendorfer, S Minner Iie Transactions 46 (3), 197-212, 2014 | 40 | 2014 |
Trade-off between capacity invested and inventory needed H Jodlbauer, K Altendorfer European Journal of Operational Research 203 (1), 118-133, 2010 | 35 | 2010 |
Influence of dispatching rules on average production lead time for multi-stage production systems A Hübl, H Jodlbauer, K Altendorfer International journal of production economics 144 (2), 479-484, 2013 | 34 | 2013 |
Effect of limited capacity on optimal planning parameters for a multi-item production system with setup times and advance demand information K Altendorfer International Journal of Production Research 57 (6), 1892-1913, 2019 | 33 | 2019 |
Using a scalable simulation model to evaluate the performance of production system segmentation in a combined MRP and kanban system T Felberbauer, K Altendorfer, A Hübl Proceedings of the 2012 Winter Simulation Conference (WSC), 1-12, 2012 | 28 | 2012 |
Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times K Altendorfer International Journal of Production Economics 170, 478-488, 2015 | 26 | 2015 |
Periodical capacity setting methods for make-to-order multi-machine production systems K Altendorfer, A Hübl, H Jodlbauer International journal of production research 52 (16), 4768-4784, 2014 | 25 | 2014 |
A new dispatching rule for optimizing machine utilization at a semiconductor test field K Altendorfer, B Kabelka, W Stocher 2007 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, 188-193, 2007 | 25 | 2007 |
Influence of order acceptance policies on optimal capacity investment with stochastic customer required lead times K Altendorfer, S Minner European Journal of Operational Research 243 (2), 555-565, 2015 | 24 | 2015 |
A simulation approach for multi-stage supply chain optimization to analyze real world transportation effects AJ Peirleitner, K Altendorfer, T Felberbauer 2016 Winter Simulation Conference (WSC), 2272-2283, 2016 | 22 | 2016 |
Application of a generic simulation model to optimize production and workforce planning at an automotive supplier K Altendorfer, T Felberbauer, D Gruber, A Hübl 2013 Winter Simulations Conference (WSC), 2689-2697, 2013 | 21 | 2013 |
Which utilization and service level lead to the maximum EVA? K Altendorfer, H Jodlbauer International Journal of Production Economics 130 (1), 16-26, 2011 | 21 | 2011 |
Relation between lead time dependent demand and capacity flexibility in a two-stage supply chain with lost sales K Altendorfer International Journal of Production Economics 194, 13-24, 2017 | 19 | 2017 |
Capacity and inventory planning for make-to-order production systems K Altendorfer Lecture notes in economics and mathematical systems). Switzerland: Springer …, 2014 | 19 | 2014 |
Comparing the performance of two different customer order behaviors within the hierarchical production planning T Felberbauer, K Altendorfer Proceedings of the Winter Simulation Conference 2014, 2227-2238, 2014 | 18 | 2014 |
Simulation based forecast data generation and evaluation of forecast error measures S Zeiml, K Altendorfer, T Felberbauer, J Nurgazina 2019 Winter Simulation Conference (WSC), 2119-2130, 2019 | 11 | 2019 |