关注
Albert eddy husin
Albert eddy husin
在 ui.ac.id 的电子邮件经过验证
标题
引用次数
引用次数
年份
Enhancing value for money of mega infrastructure projects development using value engineering method
MA Berawi, B Susantono, P Miraj, ARB Berawi, HZ Rahman, A Husin
Procedia technology 16, 1037-1046, 2014
462014
Forecasting demand on mega infrastructure projects: Increasing financial feasibility
AE Husin, MA Berawi, S Dikun, T Ilyas, ARB Berawi
International Journal of Technology 6 (1), 73-83, 2015
352015
Analisis Optimasi Waktu Dan Biaya Dengan Metode Time Cost Trade Off Pada Proyek Gudang Amunisi.
AB Budianto, AE Husin
Jurnal Aplikasi Teknik Sipil 19 (3), 305-310, 2021
202021
Key success factors for safety programs implementation in Indonesian construction projects
A Ali, M Amin, AE Husin
Int. J. Civ. Eng. Technol 10 (2), 1385-1394, 2019
182019
Analisa RII (Relative Important Index) terhadap faktor-faktor yang berpengaruh dalam mengimplementasikan BIM 4D dan M-PERT pada pekerjaan struktur bangunan hunian bertingkat tinggi
AE Husin, F Sustiawan
Jurnal Aplikasi Teknik Sipil 19 (4), 417-426, 2021
172021
M-PERT and lean construction integration on steel construction works of warehouse buildings
AE Husin, F Fahmi, S Rahardjo, IP Siregar, BD Kussumardianadewi
Int. J. Eng. Adv. Technol 8 (4), 696-702, 2019
172019
Renewable energy approach with Indonesian regulation guide uses blockchain-BIM to green cost performance
AE Husin, P Priyawan, BD Kussumardianadewi, R Pangestu, RS Prawina, ...
Civil Engineering Journal 9 (10), 2486-2502, 2023
152023
Value engineering and lifecycle cost analysis to improve cost performance in green hospital project
A Imron, AE Husin
Archives of Civil Engineering 67 (4), 497-510, 2021
152021
Cost performance review on value engineering optimized floor cover finishing work of high-rise office building
AE Husin, BD Kussumardianadewi
International Journal of Engineering and Advanced Technology 8 (2), 146-154, 2018
142018
Key success factors implementing BIM based quantity take-off in fit-out office work using relative importance index
AE Husin, TL Setyawan, H Meidiyanto, BD Kussumardianadewi, ...
Int. J. Eng. Adv. Technol 8 (6), 986-990, 2019
132019
Implementation Value Engineering In Diaphragm Wall at High Rise Building
AE Husin
vol 8, 16-23, 2019
132019
MODEL ALIANSI STRATEGIS DALAM KEMITRAAN PEMERINTAH DAN SWASTA PADA MEGA PROYEK INFRASTRUKTUR BERBASIS VALUE ENGINEERING UNTUK
AE HUSIN
122015
Using PLS-SEM to analyze the criteria for the optimum cost of green MICE projects in Indonesia based on value engineering and lifecycle cost analysis
S Sutikno, AE Husin, MME Yuliati
Archives of Civil Engineering, 555-570-555-570, 2022
102022
Analysis of key success factors using rii method on the implementation building information modeling (bim)-based quantity take-off to improve cost performance hospital structure
M Meisaroh, AE Husin, B Susetyo
Solid State Technology 64 (2), 3179-3188, 2021
102021
Analysis of Time Efficiency with CCPM Method and BIM in Construction Projects Construction of High-Rise Residential Building Basement
T Sinaga, AE Husin
Civil Engineering and Architecture 9 (5), 1465-1477, 2021
102021
Peningkatan Kinerja Biaya Berbasis Value Engineering Pada Proyek Green Hospital
A Imron, AE Husin
Jurnal Aplikasi Teknik Sipil 19 (3), 323-334, 2021
92021
Improving The Cost Performance of Mechanical Electrical And Plumbing (MEP) Works Buildings In Hotel Based on Building Information Modeling (BIM) 5D
AE Husin, SA Sihombing, BD Kussumardianadewi, DI Rahmawati
CSID Journal of Infrastructure Development 3 (2), 228-236, 2020
92020
Waste reduction at mechanical electrical plumbing (MEP) works based on lean construction in high rise building
AE Husin
International Journal of Scientific Research Engineering & Technology 8 (1 …, 2019
82019
Analytical hierarchy process (AHP) implementation in determining document evaluation criteria of post qualification E-tendering knockout phase
AE Husin, TD Soehari, YS Prabowo
Int J Eng Adv Technol 8 (6), 160-165, 2019
82019
Value increase of jetty project based on system dynamics
A Prihantoro, AE Husin
Archives of Civil Engineering 67 (4), 487-496, 2021
72021
系统目前无法执行此操作,请稍后再试。
文章 1–20