Enhancing value for money of mega infrastructure projects development using value engineering method MA Berawi, B Susantono, P Miraj, ARB Berawi, HZ Rahman, A Husin Procedia technology 16, 1037-1046, 2014 | 46 | 2014 |
Forecasting demand on mega infrastructure projects: Increasing financial feasibility AE Husin, MA Berawi, S Dikun, T Ilyas, ARB Berawi International Journal of Technology 6 (1), 73-83, 2015 | 35 | 2015 |
Analisis Optimasi Waktu Dan Biaya Dengan Metode Time Cost Trade Off Pada Proyek Gudang Amunisi. AB Budianto, AE Husin Jurnal Aplikasi Teknik Sipil 19 (3), 305-310, 2021 | 20 | 2021 |
Key success factors for safety programs implementation in Indonesian construction projects A Ali, M Amin, AE Husin Int. J. Civ. Eng. Technol 10 (2), 1385-1394, 2019 | 18 | 2019 |
Analisa RII (Relative Important Index) terhadap faktor-faktor yang berpengaruh dalam mengimplementasikan BIM 4D dan M-PERT pada pekerjaan struktur bangunan hunian bertingkat tinggi AE Husin, F Sustiawan Jurnal Aplikasi Teknik Sipil 19 (4), 417-426, 2021 | 17 | 2021 |
M-PERT and lean construction integration on steel construction works of warehouse buildings AE Husin, F Fahmi, S Rahardjo, IP Siregar, BD Kussumardianadewi Int. J. Eng. Adv. Technol 8 (4), 696-702, 2019 | 17 | 2019 |
Renewable energy approach with Indonesian regulation guide uses blockchain-BIM to green cost performance AE Husin, P Priyawan, BD Kussumardianadewi, R Pangestu, RS Prawina, ... Civil Engineering Journal 9 (10), 2486-2502, 2023 | 15 | 2023 |
Value engineering and lifecycle cost analysis to improve cost performance in green hospital project A Imron, AE Husin Archives of Civil Engineering 67 (4), 497-510, 2021 | 15 | 2021 |
Cost performance review on value engineering optimized floor cover finishing work of high-rise office building AE Husin, BD Kussumardianadewi International Journal of Engineering and Advanced Technology 8 (2), 146-154, 2018 | 14 | 2018 |
Key success factors implementing BIM based quantity take-off in fit-out office work using relative importance index AE Husin, TL Setyawan, H Meidiyanto, BD Kussumardianadewi, ... Int. J. Eng. Adv. Technol 8 (6), 986-990, 2019 | 13 | 2019 |
Implementation Value Engineering In Diaphragm Wall at High Rise Building AE Husin vol 8, 16-23, 2019 | 13 | 2019 |
MODEL ALIANSI STRATEGIS DALAM KEMITRAAN PEMERINTAH DAN SWASTA PADA MEGA PROYEK INFRASTRUKTUR BERBASIS VALUE ENGINEERING UNTUK AE HUSIN | 12 | 2015 |
Using PLS-SEM to analyze the criteria for the optimum cost of green MICE projects in Indonesia based on value engineering and lifecycle cost analysis S Sutikno, AE Husin, MME Yuliati Archives of Civil Engineering, 555-570-555-570, 2022 | 10 | 2022 |
Analysis of key success factors using rii method on the implementation building information modeling (bim)-based quantity take-off to improve cost performance hospital structure M Meisaroh, AE Husin, B Susetyo Solid State Technology 64 (2), 3179-3188, 2021 | 10 | 2021 |
Analysis of Time Efficiency with CCPM Method and BIM in Construction Projects Construction of High-Rise Residential Building Basement T Sinaga, AE Husin Civil Engineering and Architecture 9 (5), 1465-1477, 2021 | 10 | 2021 |
Peningkatan Kinerja Biaya Berbasis Value Engineering Pada Proyek Green Hospital A Imron, AE Husin Jurnal Aplikasi Teknik Sipil 19 (3), 323-334, 2021 | 9 | 2021 |
Improving The Cost Performance of Mechanical Electrical And Plumbing (MEP) Works Buildings In Hotel Based on Building Information Modeling (BIM) 5D AE Husin, SA Sihombing, BD Kussumardianadewi, DI Rahmawati CSID Journal of Infrastructure Development 3 (2), 228-236, 2020 | 9 | 2020 |
Waste reduction at mechanical electrical plumbing (MEP) works based on lean construction in high rise building AE Husin International Journal of Scientific Research Engineering & Technology 8 (1 …, 2019 | 8 | 2019 |
Analytical hierarchy process (AHP) implementation in determining document evaluation criteria of post qualification E-tendering knockout phase AE Husin, TD Soehari, YS Prabowo Int J Eng Adv Technol 8 (6), 160-165, 2019 | 8 | 2019 |
Value increase of jetty project based on system dynamics A Prihantoro, AE Husin Archives of Civil Engineering 67 (4), 487-496, 2021 | 7 | 2021 |