A new soft computing model based on linear assignment and linear programming technique for multidimensional analysis of preference with interval type-2 fuzzy sets MH Haghighi, SM Mousavi, V Mohagheghi Applied Soft Computing 77, 780-796, 2019 | 40 | 2019 |
A new analytical methodology to handle time-cost trade-off problem with considering quality loss cost under interval-valued fuzzy uncertainty MH Haghighi, SM Mousavi, J Antuchevičienė, V Mohagheghi Technological and Economic Development of Economy 25 (2), 277-299, 2019 | 26 | 2019 |
A new qualitative and quantitative analytical approach for risk management in energy project time-cost trade-off problem under interval type-2 fuzzy uncertainty: A case study … MH Haghighi, M Ashrafi Energy Reports 8, 12668-12685, 2022 | 8 | 2022 |
An optimization model for energy project scheduling problem with cost-risk-quality-social consideration trade-off under uncertainty: A real-world application MH Haghighi, SM Mousavi, M Rajabzadeh Energy Strategy Reviews 50, 101189, 2023 | 5 | 2023 |
A mathematical model and two fuzzy approaches based on credibility and expected interval for project cost-quality-risk trade-off problem in time-constrained conditions MH Haghighi, SM Mousavi Algorithms 15 (7), 226, 2022 | 4 | 2022 |
Addressing resiliency in supply chains through a multi-criteria group evaluation approach under interval type-2 fuzzy uncertainty MH Haghighi, SM Mousavi, V Mohagheghi International Journal of Applied Management Science 14 (2), 91-113, 2022 | 4 | 2022 |
A novel framework for risk management of software projects by integrating a new COPRAS method under cloud model and machine learning algorithms MH Haghighi, M Ashrafi Annals of Operations Research, 1-34, 2023 | 2 | 2023 |
A novel fuzzy Bayesian network-based approach for solving the project time-cost-quality trade-off problem M Haghighi, M Ashrafi, E Nazerfard AUT Journal of Modeling and Simulation 54 (2), 185-196, 2022 | 2 | 2022 |
تصمیمات قیمتگذاری و خدمات خردهفروشی در زنجیرهتأمینی شامل یک تولیدکننده و یک خردهفروش بااستفاده از رویکرد نظریه بازی جعفری, حامد, حقیقی نشریه پژوهش های مهندسی صنایع در سیستم های تولید 9 (19), 125-135, 2022 | | 2022 |
Fuzzy credibility modeling of project cost-quality-risk trade-off in time-constrained conditions M Haghighi, SM Mousavi کنفرانس-دوازدهمين کنفرانس بين المللي انجمن ايراني تحقيق در عمليات, 2019 | | 2019 |
مدل برنامه ريزي رياضي فازي بازه اي نوع دوم براي مساله تبادل زمان-هزينه-کيفيت پروژه M Haghighi, SM Mousavi, M Rajabzadeh چهاردهمين کنفرانس بين المللي مهندسي صنايع, 2018 | | 2018 |
A new developed weighting method based on TOPSIS for decision makers in the group decision making process with interval type-2 fuzzy sets MH Haghighi, SM Mousavi, V Mohagheghi چهاردهمين کنفرانس بين المللي مهندسي صنايع, 2018 | | 2018 |
رويکردي کاربردي با در نظر گرفتن هزينه بالقوه فقدان کيفيت براي مسيله موازنه زمان-هزينه تحت شرايط عدم قطعيت M Haghighi, SM Mousavi دهمين کنفرانس بين المللي انجمن ايراني تحقيق در عمليات, 2017 | | 2017 |