关注
Niloy Mukherjee
Niloy Mukherjee
在 vt.edu 的电子邮件经过验证
标题
引用次数
引用次数
年份
A review of lot streaming
M Cheng, NJ Mukherjee, SC Sarin
International Journal of Production Research 51 (23-24), 7023-7046, 2013
1162013
Lot streaming in the presence of learning in sublot-attached setup times and processing times
NJ Mukherjee, SC Sarin, S Singh
International Journal of Production Research 55 (6), 1623-1639, 2017
132017
Comparison of single sourcing (with lot streaming) and dual-sourcing
NJ Mukherjee, SC Sarin
Journal of the Operational Research Society 69 (11), 1701-1710, 2018
72018
Lot streaming for a two-stage assembly system in the presence of handling costs
NJ Mukherjee, SC Sarin, DA Neira
Journal of Scheduling, 1-17, 2023
42023
Lot streaming in the presence of learning
NJ Mukherjee, SC Sarin
International Journal of Planning and Scheduling 2 (1), 40-52, 2014
32014
Lot Streaming in Two-Stage Flow Shops and Assembly Systems
NJ Mukherjee
Virginia Tech, 2014
2014
系统目前无法执行此操作,请稍后再试。
文章 1–6