A holistic review of off-site construction literature published between 2008 and 2018 R Jin, S Gao, A Cheshmehzangi, E Aboagye-Nimo Journal of cleaner production 202, 1202-1219, 2018 | 354 | 2018 |
Soft skills of construction project management professionals and project success factors: a structural equation model J Zuo, X Zhao, QBM Nguyen, T Ma, S Gao Engineering, Construction and Architectural Management 25 (3), 425-442, 2018 | 232 | 2018 |
Lean construction management S Gao, SP Low Springer, Singapore, doi 10, 978-981, 2014 | 212 | 2014 |
Barriers to lean implementation in the construction industry in China G Shang, L Sui Pheng Journal of technology Management in China 9 (2), 155-173, 2014 | 171 | 2014 |
Design for manufacture and assembly in construction: a review S Gao, R Jin, W Lu Building research & information 48 (5), 538-550, 2020 | 149 | 2020 |
Design for manufacture and assembly (DfMA) in construction: The old and the new W Lu, T Tan, J Xu, J Wang, K Chen, S Gao, F Xue Architectural Engineering and Design Management 17 (1-2), 77-91, 2021 | 124 | 2021 |
The Toyota Way model: an alternative framework for lean construction S Gao, SP Low Total Quality Management & Business Excellence 25 (5-6), 664-682, 2013 | 122 | 2013 |
The last planner system in China's construction industry - a SWOT analysis on implementation S Gao, SP Low International Journal of Project Management 32 (7), 1260–1272, 2014 | 120 | 2014 |
Comparative study of project management and critical success factors of greening new and existing buildings in Singapore SP Low, S Gao, WL Tay Structural Survey 32 (5), 413 - 433, 2014 | 104 | 2014 |
Design for manufacturing and assembly (DfMA): A preliminary study of factors influencing its adoption in Singapore S Gao, SP Low, K Nair Architectural engineering and design management 14 (6), 440-456, 2018 | 100 | 2018 |
The application of the Just-in-time philosophy in the Chinese construction industry SP Low, S Gao Journal of Construction in Developing Countries 16 (1), 91-111, 2011 | 75 | 2011 |
Future-ready project and facility management graduates in Singapore for industry 4.0: Transforming mindsets and competencies SP Low, S Gao, EWL Ng Engineering, Construction and Architectural Management 28 (1), 270-290, 2021 | 71 | 2021 |
Construction-oriented design for manufacture and assembly guidelines T Tan, W Lu, G Tan, F Xue, K Chen, J Xu, J Wang, S Gao Journal of construction engineering and management 146 (8), 04020085, 2020 | 69 | 2020 |
Contributions of Industry 4.0 to supply chain resilience G Tortorella, FS Fogliatto, S Gao, TK Chan The International Journal of Logistics Management 33 (2), 547-566, 2022 | 64 | 2022 |
Understanding the application of Kaizen methods in construction firms in China S Gao, SP Low Journal of Technology Management in China 8 (1), 18-33, 2013 | 63 | 2013 |
Converging early contractor involvement (ECI) and lean construction practices for productivity enhancement: Some preliminary findings from Singapore LS Pheng, S Gao, JL Lin International Journal of Productivity and Performance Management 64 (6), 831-852, 2015 | 42 | 2015 |
Toyota Way style human resource management in large Chinese construction firms: A qualitative study S Gao, SP Low International Journal of Construction Management 15 (1), 17-32, 2015 | 39 | 2015 |
The adoption of Toyota Way principles in large Chinese construction firms S Gao, SP Low Journal of Technology Management in China 7 (3), 291-316, 2012 | 39 | 2012 |
Strategies and measures for implementing eco-labelling schemes in Singapore's construction industry SP Low, S Gao, YL See Resources, Conservation and Recycling 89 (Aug), 31-40, 2014 | 37 | 2014 |
Bridging Western management theories and Japanese management practices: case of the Toyota Way model SP Low, S Gao Emerald Emerging Markets Case Studies 1 (1), 1-20, 2011 | 27 | 2011 |