A new computer code for discrete fracture network modelling C Xu, P Dowd Computers & Geosciences 36 (3), 292-301, 2010 | 296 | 2010 |
The variogram and kriging: robust and resistant estimators PA Dowd Geostatistics for Natural Resources Characterization: Part 1, 91-106, 1984 | 193 | 1984 |
Risk assessment in reserve estimation and open-pit planning PA Dowd Transactions of the Institution of Mining and Metallurgy-Section A-Mining …, 1994 | 183 | 1994 |
A simplified coupled hydro-thermal model for enhanced geothermal systems C Xu, PA Dowd, ZF Tian Applied Energy 140, 135-145, 2015 | 179 | 2015 |
A connectivity index for discrete fracture networks C Xu, PA Dowd, KV Mardia, RJ Fowell Mathematical geology 38, 611-634, 2006 | 125 | 2006 |
Lognormal kriging—the general case PA Dowd Journal of the International Association for Mathematical Geology 14, 475-499, 1982 | 115 | 1982 |
A simulated annealing approach to mine production scheduling M Kumral, PA Dowd Journal of the Operational Research Society 56 (8), 922-930, 2005 | 112 | 2005 |
Risk in minerals projects: analysis, perception and management PA Dowd TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING …, 1997 | 111 | 1997 |
A review of recent developments in geostatistics PA Dowd Computers & Geosciences 17 (10), 1481-1500, 1991 | 110 | 1991 |
A comparison of methods for the stochastic simulation of rock fractures PA Dowd, C Xu, KV Mardia, RJ Fowell Mathematical Geology 39, 697-714, 2007 | 107 | 2007 |
CONNEC3D: a computer program for connectivity analysis of 3D random set models E Pardo-Igúzquiza, PA Dowd Computers & geosciences 29 (6), 775-785, 2003 | 102 | 2003 |
APPLICATION OF DYNAMIC AND STOCHASTIC PROGRAMMING TO OPTIMIZE CUTOFF GRADES AND PRODUCTION RATES. P Dowd Transactions of the Institution of Mining and Metallurgy, Section A 85, 22 -31, 1976 | 95 | 1976 |
Geostatistical Simulations: Proceedings of the Geostatistical Simulation Workshop, Fontainebleau, France, 27–28 May 1993 M Armstrong, PA Dowd Springer Science & Business Media, 1994 | 94 | 1994 |
Open-pit optimization. 1. Optimal open-pit design PA Dowd, AH Onur Transactions of the Institution of Mining and Metallurgy Section A-Mining …, 1993 | 91 | 1993 |
Variance–covariance matrix of the experimental variogram: assessing variogram uncertainty E Pardo-Igúzquiza, P Dowd Mathematical Geology 33, 397-419, 2001 | 83 | 2001 |
Stochastic simulation of karst conduit networks E Pardo-Igúzquiza, PA Dowd, C Xu, JJ Durán-Valsero Advances in Water resources 35, 141-150, 2012 | 75 | 2012 |
Open-pit optimization- Part 2: Production scheduling and inclusion of roadways. AH Onur, PA Dowd Transactions of the Institution of Mining and Metallurgy, Section A 102, 105-113, 1993 | 74 | 1993 |
Optimizing open pit design and sequencing PA Dowd, AH Onur Proceedings 23rd Application of Computer in Mineral Industry, 411-422, 1992 | 72 | 1992 |
Forecasting departure from planning in open pit design and grade control M David, PA Dowd, S Korobov 12th Symposium on the application of computers and operations research in …, 1974 | 71 | 1974 |
Automatic detection and delineation of karst terrain depressions and its application in geomorphological mapping and morphometric analysis E Pardo-Igúzquiza, JJD Valsero, PA Dowd Acta Carsologica 42 (1), 2013 | 70 | 2013 |