Quantitative Evaluation Method and Process of BIM Data for Generating BIM-Based 2D Deliverables Y Kim, S Chin, S Choo Buildings 13 (12), 3124, 2023 | 1 | 2023 |
Deep-Learning-Based Sound Classification Model for Concrete Pouring Work Monitoring at a Construction Site I Kim, Y Kim, S Chin Applied Sciences 13 (8), 4789, 2023 | 4 | 2023 |
Sound localization framework for construction site monitoring IC Kim, YJ Kim, SY Chin Applied Sciences 12 (21), 10783, 2022 | 7 | 2022 |
BIM data requirements for 2D deliverables in construction documentation Y Kim, S Chin, S Choo Automation in Construction 140, 104340, 2022 | 12 | 2022 |
Automatic stereo vision-based inspection system for particle shape analysis of coarse aggregates NM Tuan, Y Kim, JY Lee, S Chin Journal of Computing in Civil Engineering 36 (2), 04021034, 2022 | 11 | 2022 |
In-situ concrete slump test incorporating deep learning and stereo vision NM Tuan, Q Van Hau, S Chin, S Park Automation in Construction 121, 103432, 2021 | 27 | 2021 |
Machine learning predictive model based on national data for fatal accidents of construction workers J Choi, B Gu, S Chin, JS Lee Automation in Construction 110, 102974, 2020 | 169 | 2020 |
A Study on Strategy and Utilization for Practical Application of BIM in MEP Area YJ Kim, YI Kim, IC Kim, SY Chin Journal of KIBIM 10 (4), 70-80, 2020 | | 2020 |
Developing a Drawing Template for BIM software to Improve BIM-based Drawing Work Efficiency in the Construction Document Phase YJ Kim, IC Kim, SY Chin Journal of KIBIM 10 (4), 98-109, 2020 | | 2020 |
A discrepancy analysis of BIM-based quantity take-off for building interior components S Kim, S Chin, S Kwon Journal of Management in Engineering 35 (3), 05019001, 2019 | 46 | 2019 |
Determining the optimal long-term service agreement period and cost considering the uncertain factors in the fuel cell: From the perspectives of the sellers and generators H Kang, J Hong, T Hong, D Han, S Chin, M Lee Applied energy 237, 378-389, 2019 | 7 | 2019 |
An analysis of the problems of BIM-based drawings and implementation during the construction document phase Y Kim, S Chin ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2019 | 5 | 2019 |
Development of the prediction model of workers with fatal accident at construction site using machine learning J Choia, B Gub, S Chin Proceeding of the Creative Construction Conference, 870-875, 2018 | 1 | 2018 |
A development of a checklist to check the consistency of BIM and drawings at the construction documentation phase BJ Kim, YJ Kim, SY Chin Journal of KIBIM 8 (1), 33-42, 2018 | 6 | 2018 |
Proposal Strategy and Performance Analysis of Electronic Human Resources Management Pilot Project I Kim, S Chin, S Kim, Y Kim, S Lee, S Park Korean Journal of Construction Engineering and Management 19 (4), 3-11, 2018 | | 2018 |
An accident notification system in concrete pouring using sound analysis I Kim, S Chin, J Ko ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2018 | 1 | 2018 |
Measurement of construction BIM value based on a case study of a large-scale building project S Kim, S Chin, J Han, CH Choi Journal of management in engineering 33 (6), 05017005, 2017 | 62 | 2017 |
A study on scan data matching for reverse engineering of pipes in plant construction M Lee, S Lee, S Kwon, S Chin KSCE Journal of Civil Engineering 21, 2027-2036, 2017 | 22 | 2017 |
Proposal of Smart BIM Library Framework for Curtain Wall with different LOD on each project stage BJ Kim, SA Kim, BJ Kim, SY Chin Journal of KIBIM 7 (2), 44-55, 2017 | | 2017 |
What authentication technology should be chosen for construction manpower management? S Chin, I Kim, CH Choi Procedia engineering 196, 309-314, 2017 | 9 | 2017 |