A fast Pareto genetic algorithm approach for solving expensive multiobjective optimization problems H Eskandari, CD Geiger Journal of Heuristics 14, 203-241, 2008 | 106 | 2008 |
A generalized fuzzy Multiple-Layer NDEA: An application to performance-based budgeting MR Amini, A Azar, H Eskandari, PF Wanke Applied Soft Computing 100, 106984, 2021 | 10 | 2021 |
A generalized fuzzy Multiple-Layer NDEA: An application to performance-based budgeting Applied soft computing, 0 | | |
A generalized fuzzy Multiple-Layer NDEA: An application to performance-based budgeting Applied soft computing, 0 | | |
A mathematical model for supermarket location problem with stochastic station demands A Nourmohammadi, H Eskandari, M Fathi, M Aghdasi Procedia CIRP 72, 444-449, 2018 | 9 | 2018 |
A modified (S− 1, S) inventory system for deteriorating items with Poisson demand and non-zero lead time M Alizadeh, H Eskandari, SM Sajadifar Applied Mathematical Modelling 38 (2), 699-711, 2014 | 28 | 2014 |
A multi-objective modelling approach to assess the impact of maintenance scheduling on equipment procurement methods A Sayyah, RB Kazemzadeh, MM Sepehri, H Eskandari International Journal of Industrial and Systems Engineering 31 (2), 184-208, 2019 | 3 | 2019 |
A simulation model to analyze an invenntory system for deteriorating items with service level constraint M Alizadeh, H Eskandari, SM Sajadifar International Journal of Industrial Engineering 24 (6), 587-603, 2017 | 4 | 2017 |
A simulation-based multi-objective optimization study of the fleet sizing problem in the offshore industry H Eskandari, E Mahmoodi Maritime Economics & Logistics 18, 436-457, 2016 | 21 | 2016 |
A variable neighbourhood search for hybrid flow-shop scheduling problem with rework and set-up times H Eskandari, A Hosseinzadeh Journal of the Operational Research Society 65 (8), 1221-1231, 2014 | 29 | 2014 |
An improved genetic algorithm with variable neighborhood search to solve the assembly line balancing problem M Fathi, A Nourmohammadi, A HC Ng, A Syberfeldt, H Eskandari Engineering computations 37 (2), 501-521, 2019 | 32 | 2019 |
An integrated MCDM approach to evaluate public transportation systems in Tehran M Nassereddine, H Eskandari Transportation Research Part A: Policy and Practice 106, 427-439, 2017 | 158 | 2017 |
An integrated model for cost-oriented assembly line balancing and parts feeding with supermarkets A Nourmohammadi, H Eskandari, M Fathi, MR Bourani Procedia Cirp 72, 381-385, 2018 | 18 | 2018 |
An interpretable multi-stage forecasting framework for energy consumption and CO2 emissions for the transportation sector Q Qiao, H Eskandari, H Saadatmand, MA Sahraei Energy 286, 129499, 2024 | 9 | 2024 |
An optimization model for material supply scheduling at mixed-model assembly lines M Fathi, A Syberfeldt, M Ghobakhloo, H Eskandari Procedia Cirp 72, 1258-1263, 2018 | 20 | 2018 |
Analyzing a stochastic inventory system for deteriorating items with stochastic lead time using simulation modeling M Alizadeh, H Eskandari, SM Sajadifar, CD Geiger Proceedings of the 2011 Winter Simulation Conference (WSC), 1645-1657, 2011 | 12 | 2011 |
Assembly line design considering line balancing and part feeding A Nourmohammadi, H Eskandari Assembly Automation 37 (1), 135-143, 2017 | 25 | 2017 |
Bottleneck analysis in a pharmaceutical production line using simulation approach. H Eskandari, N Babolmorad, N Farrokhnia SummerSim, 12, 2013 | 4 | 2013 |
BUILDING A STOCHASTIC INVENTORY MODEL FOR DETERIORATING ITEMS WITH SERVICE LEVEL CONSTRAINT USING SIMULATION MODELING H Eskandari, SM Sajadifar, M Alizadeh | 1 | |
Business process modeling: supply chains in buisness process modeling H Eskandari Winter Simulation Conference: Proceedings of the 37 th conference on Winter …, 2005 | | 2005 |