关注
Hamidreza Eskandari
标题
引用次数
年份
A fast Pareto genetic algorithm approach for solving expensive multiobjective optimization problems
H Eskandari, CD Geiger
Journal of Heuristics 14, 203-241, 2008
1062008
A generalized fuzzy Multiple-Layer NDEA: An application to performance-based budgeting
MR Amini, A Azar, H Eskandari, PF Wanke
Applied Soft Computing 100, 106984, 2021
102021
A generalized fuzzy Multiple-Layer NDEA: An application to performance-based budgeting
Applied soft computing, 0
A generalized fuzzy Multiple-Layer NDEA: An application to performance-based budgeting
Applied soft computing, 0
A mathematical model for supermarket location problem with stochastic station demands
A Nourmohammadi, H Eskandari, M Fathi, M Aghdasi
Procedia CIRP 72, 444-449, 2018
92018
A modified (S− 1, S) inventory system for deteriorating items with Poisson demand and non-zero lead time
M Alizadeh, H Eskandari, SM Sajadifar
Applied Mathematical Modelling 38 (2), 699-711, 2014
282014
A multi-objective modelling approach to assess the impact of maintenance scheduling on equipment procurement methods
A Sayyah, RB Kazemzadeh, MM Sepehri, H Eskandari
International Journal of Industrial and Systems Engineering 31 (2), 184-208, 2019
32019
A simulation model to analyze an invenntory system for deteriorating items with service level constraint
M Alizadeh, H Eskandari, SM Sajadifar
International Journal of Industrial Engineering 24 (6), 587-603, 2017
42017
A simulation-based multi-objective optimization study of the fleet sizing problem in the offshore industry
H Eskandari, E Mahmoodi
Maritime Economics & Logistics 18, 436-457, 2016
212016
A variable neighbourhood search for hybrid flow-shop scheduling problem with rework and set-up times
H Eskandari, A Hosseinzadeh
Journal of the Operational Research Society 65 (8), 1221-1231, 2014
292014
An improved genetic algorithm with variable neighborhood search to solve the assembly line balancing problem
M Fathi, A Nourmohammadi, A HC Ng, A Syberfeldt, H Eskandari
Engineering computations 37 (2), 501-521, 2019
322019
An integrated MCDM approach to evaluate public transportation systems in Tehran
M Nassereddine, H Eskandari
Transportation Research Part A: Policy and Practice 106, 427-439, 2017
1582017
An integrated model for cost-oriented assembly line balancing and parts feeding with supermarkets
A Nourmohammadi, H Eskandari, M Fathi, MR Bourani
Procedia Cirp 72, 381-385, 2018
182018
An interpretable multi-stage forecasting framework for energy consumption and CO2 emissions for the transportation sector
Q Qiao, H Eskandari, H Saadatmand, MA Sahraei
Energy 286, 129499, 2024
92024
An optimization model for material supply scheduling at mixed-model assembly lines
M Fathi, A Syberfeldt, M Ghobakhloo, H Eskandari
Procedia Cirp 72, 1258-1263, 2018
202018
Analyzing a stochastic inventory system for deteriorating items with stochastic lead time using simulation modeling
M Alizadeh, H Eskandari, SM Sajadifar, CD Geiger
Proceedings of the 2011 Winter Simulation Conference (WSC), 1645-1657, 2011
122011
Assembly line design considering line balancing and part feeding
A Nourmohammadi, H Eskandari
Assembly Automation 37 (1), 135-143, 2017
252017
Bottleneck analysis in a pharmaceutical production line using simulation approach.
H Eskandari, N Babolmorad, N Farrokhnia
SummerSim, 12, 2013
42013
BUILDING A STOCHASTIC INVENTORY MODEL FOR DETERIORATING ITEMS WITH SERVICE LEVEL CONSTRAINT USING SIMULATION MODELING
H Eskandari, SM Sajadifar, M Alizadeh
1
Business process modeling: supply chains in buisness process modeling
H Eskandari
Winter Simulation Conference: Proceedings of the 37 th conference on Winter …, 2005
2005
系统目前无法执行此操作,请稍后再试。
文章 1–20