关注
Najib Mohamed Najid
Najib Mohamed Najid
在 univ-nantes.fr 的电子邮件经过验证
标题
引用次数
年份
2002 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS
A El
A modified simulated annealing method for flexible job shop scheduling problem
NM Najid, S Dauzere-Peres, A Zaidat
IEEE international conference on systems, man and cybernetics 5, 6 pp. vol. 5, 2002
922002
A new approach of dynamic piloting
NM Najid, G Coeurdeuil, P Vachot
RAIRO-Automatique Productique Informatique Industr-Automatic Control Prod …, 1994
1994
A new heuristic to solve RCPSP with multiple execution modes and Multi-Skilled Labor
Y Kadrou, NM Najid
The Proceedings of the Multiconference on" Computational Engineering in …, 2006
242006
A novel integration approach for a complex supply chain optimization problem in an export bulk port
S Mallah, A Aloullal, O Kamach, K Kouiss, N Najid, L Deshayes
2020 7th International Conference on Control, Decision and Information …, 2020
22020
A review of single item lot sizing problems
N Brahimi, S Dauzere-Peres, N Najid, A Nordli
IEEE International Conference on Systems, Man and Cybernetics 5, 6 pp. vol. 5, 2002
42002
Agent based approach for a real-time shop floor control
NM Najid, K Kouiss, O Derriche
IEEE International Conference on Systems, Man and Cybernetics 4, 6 pp. vol. 4, 2002
102002
Alternative Robust Solutions for the Capacitated Lot-sizing Problem with Stochastic Demands
C Sitompul, EH Aghezzaf, N NAJID
L'entreprise innovante en réponse à la mondialisation: défis et perspectives …, 2007
2007
An efficient algorithm for the multi-mode resource constrained project scheduling problem with resource flexibility
NM Najid, M Arroub
International Journal of Mathematics in Operational Research 2 (6), 748-761, 2010
142010
An integrated production and maintenance planning model with time windows and shortage cost
NM Najid, M Alaoui-Selsouli, A Mohafid
International journal of production research 49 (8), 2265-2283, 2011
1192011
An Integrated Production and Maintenance Planning Model with time windows and shortage cost
NM Najib, A Mohafid, EH Aghezzaf
IFAC Proceedings Volumes 42 (4), 822-827, 2009
32009
An Integrated Production and Maintenance Planning Model with time windows and shortage cost
MA Selsouli, NM Najib, A Mohafid, EH Aghezzaf
IFAC Proceedings Volumes 42 (4), 822-827, 2009
12009
Capacitated multi-item lot-sizing problems with time windows
N Brahimi, S Dauzère-Pérès, NM Najid
Operations Research 54 (5), 951-967, 2006
822006
Couplage d’un algorithme génétique et d’une relaxation lagrangienne pour un problème de planification conjointe de production et de maintenance
M Alaoui, NM Najid, A Mohafid
Dantzig-Wolfe decomposition and lagrangean relaxation-based heuristics for an integrated production and maintenance planning with time windows
NM Najid, M Alaoui-Selsouli, A Mohafid
Handbook of research on modern optimization algorithms and applications in …, 2016
12016
Etat de l’art sur les problemes de dimensionnement des lots avec contraintes de capacité
N Brahimi, S Dauzere-Péres, N Najid, A Nordli
Conférence Francophone de MOdélisation et SIMulation, 385-392, 2003
52003
Honorary Committee
R Ruiz, B Adenso-Diaz, D Ait-Kadi, A Allahverdi, H Allaoui, ...
Honorary Committee
EH Aghezzaf, H Allaoui, M Araújo, M Arroub, A Artiba, C Artigues, ...
Integrated production and preventive maintenance in production systems subject to random failures
EH Aghezzaf, C Sitompul, N Najid
Actes de Mosim'08, 1-8, 2008
202008
Integrated production planning and preventive maintenance in deteriorating production systems
EH Aghezzaf, NM Najid
Information Sciences 178 (17), 3382-3392, 2008
1652008
系统目前无法执行此操作,请稍后再试。
文章 1–20