关注
Marco Schutten
Marco Schutten
在 utwente.nl 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Vehicle routing under time-dependent travel times: the impact of congestion avoidance
AL Kok, EW Hans, JMJ Schutten
Computers & operations research 39 (5), 910-918, 2012
2502012
A dynamic programming heuristic for the vehicle routing problem with time windows and European Community social legislation
AL Kok, CM Meyer, H Kopfer, JMJ Schutten
Transportation Science 44 (4), 442-454, 2010
176*2010
Inventory routing for dynamic waste collection
M Mes, M Schutten, AP Rivera
Waste management 34 (9), 1564-1576, 2014
1182014
Multi-hop driver-parcel matching problem with time windows
W Chen, M Mes, M Schutten
Flexible services and manufacturing journal 30, 517-553, 2018
1132018
Joint optimization of level of repair analysis and spare parts stocks
RJI Basten, MC Van der Heijden, JMJ Schutten
European journal of operational research 222 (3), 474-483, 2012
1062012
Practical job shop scheduling
JMJ Schutten
Annals of Operations Research 83 (0), 161-178, 1998
1061998
Parallel machine scheduling with release dates, due dates and family setup times
JMJ Schutten, RAM Leussink
International journal of production economics 46, 119-125, 1996
981996
The delivery dispatching problem with time windows for urban consolidation centers
WJA Van Heeswijk, MRK Mes, JMJ Schutten
Transportation science 53 (1), 203-221, 2019
962019
Restricted dynamic programming: a flexible framework for solving realistic VRPs
J Gromicho, JJ van Hoorn, AL Kok, JMJ Schutten
Computers & operations research 39 (5), 902-909, 2012
942012
Single-machine scheduling with release dates, due dates and family setup times
JMJ Schutten, SL Van de Velde, WHM Zijm
Management Science 42 (8), 1165-1174, 1996
861996
Optimizing departure times in vehicle routes
AL Kok, EW Hans, JMJ Schutten
European Journal of Operational Research 210 (3), 579-587, 2011
842011
List scheduling revisited
JMJ Schutten
Operations Research Letters 18 (4), 167-170, 1996
841996
An efficient model formulation for level of repair analysis
RJI Basten, JMJ Schutten, MC Van Der Heijden
Annals of Operations Research 172, 119-142, 2009
792009
Waiting profiles: An efficient protocol for enabling distributed planning of container barge rotations along terminals in the port of Rotterdam
A Douma, M Schutten, P Schuur
Transportation Research Part C: Emerging Technologies 17 (2), 133-148, 2009
772009
A dynamic programming heuristic for vehicle routing with time-dependent travel times and required breaks
AL Kok, EW Hans, JMJ Schutten, WHM Zijm
Flexible Services and Manufacturing Journal 22 (1), 83-108, 2010
682010
Linear-programming-based heuristics for project capacity planning
N Gademann, M Schutten
Iie Transactions 37 (2), 153-165, 2005
682005
A ride-sharing problem with meeting points and return restrictions
W Chen, M Mes, M Schutten, J Quint
Transportation science 53 (2), 401-426, 2019
632019
A minimum cost flow model for level of repair analysis
RJI Basten, MC Van der Heijden, JMJ Schutten
International Journal of Production Economics 133 (1), 233-242, 2011
612011
Time-constrained project scheduling
TA Guldemond, JL Hurink, JJ Paulus, JMJ Schutten
Journal of Scheduling 11 (2), 137-148, 2008
612008
An approximate approach for the joint problem of level of repair analysis and spare parts stocking
RJI Basten, MC Van der Heijden, JMJ Schutten, E Kutanoglu
Annals of operations research 224 (1), 121-145, 2015
522015
系统目前无法执行此操作,请稍后再试。
文章 1–20