A genetic programming-based scheduling approach for hybrid flow shop with a batch processor and waiting time constraint M Qin, R Wang, Z Shi, L Liu, L Shi IEEE Transactions on Automation Science and Engineering 18 (1), 94-105, 2019 | 39 | 2019 |
Flow shop scheduling with a batch processor and limited buffer C Zhang, Z Shi, Z Huang, Y Wu, L Shi International Journal of Production Research 55 (11), 3217-3233, 2017 | 35 | 2017 |
Minimizing completion time for order scheduling: Formulation and heuristic algorithm Z Shi, L Wang, P Liu, L Shi IEEE Transactions on Automation Science and Engineering 14 (4), 1558-1569, 2015 | 33 | 2015 |
Customer order scheduling on batch processing machines with incompatible job families Z Shi, Z Huang, L Shi International Journal of Production Research 56 (1-2), 795-808, 2018 | 25 | 2018 |
Dantzig-Wolfe decomposition for the facility location and production planning problem T Wu, Z Shi, Z Liang, X Zhang, C Zhang Computers & Operations Research 124, 105068, 2020 | 19 | 2020 |
Dynamic sampling allocation under finite simulation budget for feasibility determination Z Shi, Y Peng, L Shi, CH Chen, MC Fu INFORMS Journal on Computing 34 (1), 557-568, 2022 | 18 | 2022 |
Advancing constrained ranking and selection with regression in partitioned domains F Gao, S Gao, H Xiao, Z Shi IEEE Transactions on Automation Science and Engineering 16 (1), 382-391, 2018 | 15 | 2018 |
A Note on" Two new approaches for a two-stage hybrid flowshop problem with a single batch processing machine under waiting time constraint". Z Huang, Z Shi, C Zhang, L Shi Computers & Industrial Engineering 110, 590-593, 2017 | 12 | 2017 |
Treatment planning for volumetric-modulated arc therapy: Model and heuristic algorithms J Song, Z Shi, B Sun, L Shi IEEE Transactions on Automation Science and Engineering 12 (1), 116-126, 2014 | 12 | 2014 |
Approximation method to rank-one binary matrix factorization Z Shi, L Wang, L Shi 2014 IEEE International Conference on Automation Science and Engineering …, 2014 | 11 | 2014 |
Workforce allocation in motorcycle transmission assembly lines: A case study on modeling, analysis, and improvement H Ma, HK Lee, Z Shi, J Li IEEE Robotics and Automation Letters 5 (3), 4164-4171, 2020 | 10 | 2020 |
Integrated optimisation on flow-shop production with cutting stock W Wang, Z Shi, L Shi, Q Zhao International Journal of Production Research 57 (19), 5996-6012, 2019 | 10 | 2019 |
Efficient simulation budget allocation for subset selection using regression metamodels F Gao, Z Shi, S Gao, H Xiao Automatica 106, 192-200, 2019 | 10 | 2019 |
A worst‐case formulation for constrained ranking and selection with input uncertainty Z Shi, S Gao, H Xiao, W Chen Naval Research Logistics (NRL) 66 (8), 648-662, 2019 | 9 | 2019 |
Simulation optimization for mro systems operations P Liu, X Zhang, Z Shi, Z Huang Asia-Pacific Journal of Operational Research 34 (02), 1750003, 2017 | 9 | 2017 |
A learning-based two-stage optimization method for customer order scheduling Z Shi, H Ma, M Ren, T Wu, JY Andrew Computers & Operations Research 136, 105488, 2021 | 8 | 2021 |
The hub location problem with market selection T Wu, Z Shi, C Zhang Computers & Operations Research 127, 105136, 2021 | 8 | 2021 |
Automatic Design of Dispatching Rules for Real-time optimization of Complex Production Systems* Z Shi, S Gao, J Du, H Ma, L Shi 2019 IEEE/SICE international symposium on system integration (SII), 55-60, 2019 | 8 | 2019 |
A novel quadratic formulation for customer order scheduling problem L Wang, Z Shi, L Shi 2013 IEEE International Conference on Automation Science and Engineering …, 2013 | 8 | 2013 |
Minimising total weighted completion time on batch and unary machines with incompatible job families Z Huang, Z Shi, L Shi International Journal of Production Research 57 (2), 567-581, 2019 | 7 | 2019 |