Generation scheduling in a deregulated system. The Norwegian case OB Fosso, A Gjelsvik, A Haugstad, B Mo, I Wangensteen IEEE Transactions on power systems 14 (1), 75-81, 1999 | 430 | 1999 |
Hydro reservoir handling in Norway before and after deregulation O Wolfgang, A Haugstad, B Mo, A Gjelsvik, I Wangensteen, G Doorman Energy 34 (10), 1642-1651, 2009 | 258 | 2009 |
Integrated risk management of hydro power scheduling and contract management B Mo, A Gjelsvik, A Grundt IEEE Transactions on Power Systems 16 (2), 216-221, 2001 | 186 | 2001 |
Long-and medium-term operations planning and stochastic modelling in hydro-dominated power systems based on stochastic dual dynamic programming A Gjelsvik, B Mo, A Haugstad Handbook of power systems I, 33-55, 2010 | 163 | 2010 |
Stochastic generation expansion planning by means of stochastic dynamic programming B Mo, J Hegge, I Wangensteen IEEE Transactions on Power Systems 6 (2), 662-668, 1991 | 148 | 1991 |
A model for optimal scheduling of hydro thermal systems including pumped‐storage and wind power A Helseth, A Gjelsvik, B Mo, Ú Linnet IET Generation, Transmission & Distribution 7 (12), 1426-1434, 2013 | 105 | 2013 |
Optimal medium-term hydropower scheduling considering energy and reserve capacity markets A Helseth, M Fodstad, B Mo IEEE Transactions on Sustainable Energy 7 (3), 934-942, 2016 | 81 | 2016 |
Short-term and medium-term generation scheduling in the Norwegian hydro system under a competitive power market structure N Flatabø, A Haugstad, B Mo, OB Fosso EPSOM’98 (International Conference on Electrical Power System Operation and …, 1998 | 79 | 1998 |
Joint optimization of regional water-power systems SJ Pereira-Cardenal, B Mo, A Gjelsvik, ND Riegels, K Arnbjerg-Nielsen, ... Advances in water resources 92, 200-207, 2016 | 65 | 2016 |
Norway as a battery for the future european power system—impacts on the hydropower system I Graabak, S Jaehnert, M Korpås, B Mo Energies 10 (12), 2054, 2017 | 61 | 2017 |
Assessing climate change impacts on the iberian power system using a coupled water-power model SJ Pereira-Cardenal, H Madsen, K Arnbjerg-Nielsen, N Riegels, ... Climatic change 126, 351-364, 2014 | 61 | 2014 |
Detailed long‐term hydro‐thermal scheduling for expansion planning in the Nordic power system A Helseth, B Mo, A Lote Henden, G Warland IET Generation, Transmission & Distribution 12 (2), 441-447, 2018 | 60 | 2018 |
Optimisation of hydropower operation in a liberalised market with focus on price modelling B Mo, A Gjelsvik, A Grundt, K Karesen 2001 IEEE Porto Power Tech Proceedings (Cat. No. 01EX502) 1, 6 pp. vol. 1, 2001 | 55 | 2001 |
Optimal hydropower maintenance scheduling in liberalized markets A Helseth, M Fodstad, B Mo IEEE Transactions on Power Systems 33 (6), 6989-6998, 2018 | 45 | 2018 |
Hydrothermal scheduling in Norway using stochastic dual dynamic programming; a large-scale case study KS Gjerden, A Helseth, B Mo, G Warland 2015 IEEE Eindhoven powertech, 1-6, 2015 | 44 | 2015 |
Long-term scheduling of hydro-thermal power systems using scenario fans A Helseth, B Mo, G Warland Energy Systems 1 (4), 377-391, 2010 | 35 | 2010 |
Structure and stylized facts of a deregulated power market I Simonsen, R Weron, B Mo Hugo Steinhaus Center, 2004 | 32 | 2004 |
Assessing hydropower operational profitability considering energy and reserve markets A Helseth, M Fodstad, M Askeland, B Mo, OB Nilsen, JI Pérez‐Díaz, ... IET renewable power generation 11 (13), 1640-1647, 2017 | 29 | 2017 |
Effects of increased wind power generation on mid-Norway’s energy balance under climate change: a market based approach B François, S Martino, LS Tøfte, B Hingray, B Mo, JD Creutin Energies 10 (2), 227, 2017 | 29 | 2017 |
Long-term hydro-thermal scheduling including network constraints A Helseth, G Warland, B Mo 2010 7th International Conference on the European Energy Market, 1-6, 2010 | 29 | 2010 |