Critical evaluation of off-site construction research: A Scientometric analysis MR Hosseini, I Martek, EK Zavadskas, AA Aibinu, M Arashpour, ... Automation in construction 87, 235-247, 2018 | 552 | 2018 |
Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review M Oraee, MR Hosseini, E Papadonikolaki, R Palliyaguru, M Arashpour International journal of project management 35 (7), 1288-1301, 2017 | 422 | 2017 |
Predicting the compressive strength of normal and High-Performance Concretes using ANN and ANFIS hybridized with Grey Wolf Optimizer EM Golafshani, A Behnood, M Arashpour Construction and Building Materials 232, 117266, 2020 | 372 | 2020 |
Artificial intelligence and smart vision for building and construction 4.0: Machine and deep learning methods and applications SK Baduge, S Thilakarathna, JS Perera, M Arashpour, P Sharafi, ... Automation in Construction 141, 104440, 2022 | 365 | 2022 |
Lean methodologies and techniques for modular construction: Chronological and critical review F Innella, M Arashpour, Y Bai Journal of Construction Engineering and Management 145 (12), 04019076, 2019 | 162 | 2019 |
Analysis of citation networks in building information modeling research MR Hosseini, M Maghrebi, A Akbarnezhad, I Martek, M Arashpour Journal of construction engineering and management 144 (8), 04018064, 2018 | 158 | 2018 |
Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction M Arashpour, R Wakefield, EWM Lee, R Chan, MR Hosseini International Journal of Project Management 34 (7), 1393-1402, 2016 | 136 | 2016 |
Off-site construction optimization: Sequencing multiple job classes with time constraints M Arashpour, R Wakefield, B Abbasi, EWM Lee, J Minas Automation in construction 71, 262-270, 2016 | 129 | 2016 |
Optimization of process integration and multi-skilled resource utilization in off-site construction M Arashpour, R Wakefield, N Blismas, J Minas Automation in Construction 50, 72-80, 2015 | 128 | 2015 |
Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction M Arashpour, Y Bai, G Aranda-Mena, A Bab-Hadiashar, R Hosseini, ... Automation in Construction 84, 146-153, 2017 | 126 | 2017 |
Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction M Arashpour, V Kamat, Y Bai, R Wakefield, B Abbasi Automation in Construction 95, 1-9, 2018 | 124 | 2018 |
Sensor-based safety management A Asadzadeh, M Arashpour, H Li, T Ngo, A Bab-Hadiashar, A Rashidi Automation in Construction 113, 103128, 2020 | 121 | 2020 |
Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: a case study of the new Royal Adelaide Hospital G Mignone, MR Hosseini, N Chileshe, M Arashpour Architectural Engineering and Design Management 12 (5), 333-352, 2016 | 110 | 2016 |
Integrated management of on-site, coordination and off-site uncertainty: Theorizing risk analysis within a hybrid project setting M Arashpour, B Abbasi, M Arashpour, MR Hosseini, R Yang International journal of project management 35 (4), 647-655, 2017 | 96 | 2017 |
Analysis of workflow variability and its impacts on productivity and performance in construction of multistory buildings M Arashpour, M Arashpour Journal of Management in Engineering 31 (6), 04015006, 2015 | 92 | 2015 |
3D point cloud data processing with machine learning for construction and infrastructure applications: A comprehensive review K Mirzaei, M Arashpour, E Asadi, H Masoumi, Y Bai, A Behnood Advanced engineering informatics 51, 101501, 2022 | 88 | 2022 |
Autonomous production tracking for augmenting output in off-site construction M Arashpour, R Wakefield, N Blismas, T Maqsood Automation in construction 53, 13-21, 2015 | 84 | 2015 |
Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources M Arashpour, R Wakefield, B Abbasi, M Arashpour, R Hosseini Architectural Engineering and Design Management 14 (1-2), 46-59, 2018 | 83 | 2018 |
Safety management in construction: 20 years of risk modeling M Alkaissy, M Arashpour, B Ashuri, Y Bai, R Hosseini Safety science 129, 104805, 2020 | 77 | 2020 |
Analysis of disruptions caused by construction field rework on productivity in residential projects M Arashpour, R Wakefield, N Blismas, EWM Lee Journal of construction engineering and management 140 (2), 04013053, 2014 | 77 | 2014 |