A true south for design? The new international division of labour in architecture P Tombesi ARQ: Architectural Research Quarterly 5 (2), 171-180, 2001 | 41 | 2001 |
Transnational and temporary: Students, community and place-making in central Melbourne R Fincher, P Carter, P Tombesi, K Shaw University of Melbourne, 2009 | 39 | 2009 |
Routine production or symbolic analysis? India and the globalisation of architectural services P Tombesi, B Dave, P Scriver The Journal of Architecture 8 (1), 63-94, 2003 | 39 | 2003 |
Towards a more “robust” technology? Capacity building in post‐tsunami Sri Lanka M Pathiraja, P Tombesi Disaster Prevention and Management: An International Journal 18 (1), 55-65, 2009 | 36 | 2009 |
Good thinking and poor value: on the socialization of knowledge in construction P Tombesi Building Research & Information 34 (3), 272-286, 2006 | 33 | 2006 |
On the cultural separation of design labor P Tombesi Building (in) the future: recasting labor in architecture, 2009 | 28 | 2009 |
Involving the industry: Gehry's use of ‘Request for Proposals’ packages P Tombesi Arq: architectural research quarterly 6 (1), 77-87, 2002 | 17* | 2002 |
Iconic public buildings as sites of technological innovation P Tombesi Harvard Design Magazine-online, 2005 | 15 | 2005 |
Super Market: The globalization of architectural production P Tombesi Harvard design magazine 17 (20022003), 26-31, 2002 | 13 | 2002 |
The carriage in the needle: building design and flexible specialization systems P Tombesi Journal of architectural education 52 (3), 134-142, 1999 | 13 | 1999 |
Architectural feasts or professional fausts? A double perspective on the bargains of globalization [Series of two parts]: Part 2. P Tombesi Architecture Australia 93 (5), 60-61, 2004 | 12 | 2004 |
Capital gains and architectural losses: the transformative journey of Caudill Rowlett Scott (1948–1994) P Tombesi The Journal of Architecture 11 (2), 145-168, 2006 | 10 | 2006 |
Travels from Flatland: The Walt Disney Concert Hall and the specialization of design knowledge in the building sector P Tombesi University of California, Los Angeles, 1997 | 10 | 1997 |
What do we mean by building design? P Tombesi Digital Workflows in Architecture: Design-Assembly-Industry, 2012 | 9 | 2012 |
Challenges of design management in construction P Tombesi, J Whyte The Handbook of Design Management; Cooper, R., Junginger, S., Lockwood, T …, 2011 | 9 | 2011 |
Forum Out of what? Locating the underpinnings of theory P Tombesi Building Research & Information 36 (6), 668-673, 2008 | 9 | 2008 |
Rules of engagement: testing the attributes of distant outsourcing marriages P Tombesi, B Dave, B Gardiner, P Scriver Architectural Engineering and Design Management 3 (1), 49-64, 2007 | 9 | 2007 |
Modelling the dynamics of design error induced rework in construction: comment P Tombesi Construction Management and Economics 18 (7), 727-732, 2000 | 9 | 2000 |
Are physical mock-ups still necessary to complement visual models for the realization of design intents? R Pietroforte, P Tombesi, DD Lebiedz Journal of Architectural Engineering 18 (1), 34-41, 2012 | 8 | 2012 |
Travels from flatland P Tombesi Architecture, 1997 | 8 | 1997 |