Games ready to use: A serious game for teaching natural risk management F Taillandier, C Adam Simulation & Gaming 49 (4), 441-470, 2018 | 98 | 2018 |
A multi-agent model to manage risks in construction project (SMACC) F Taillandier, P Taillandier, E Tepeli, D Breysse, R Mehdizadeh, ... Automation in Construction 58, 1-18, 2015 | 82 | 2015 |
Methodology and tools for risk evaluation in construction projects using Risk Breakdown Structure M Rasool, T Franck, B Denys, N Halidou European Journal of Environmental and Civil Engineering 16 (sup1), 78-98, 2012 | 56 | 2012 |
Li-BIM, an agent-based approach to simulate occupant-building interaction from the Building-Information Modelling A Micolier, F Taillandier, P Taillandier, F Bos Engineering Applications of Artificial Intelligence 82, 44-59, 2019 | 47 | 2019 |
Multidimensional modelling of complex and strategic construction projects for a more effective risk management E Tepeli, F Taillandier, D Breysse International journal of construction management 21 (12), 1218-1239, 2021 | 43 | 2021 |
To what extent can agent-based modelling enhance a life cycle assessment? Answers based on a literature review A Micolier, P Loubet, F Taillandier, G Sonnemann Journal of Cleaner Production 239, 118123, 2019 | 41 | 2019 |
Real estate property maintenance optimization based on multiobjective multidimensional knapsack problem F Taillandier, C Fernandez, A Ndiaye Computer‐Aided Civil and Infrastructure Engineering 32 (3), 227-251, 2017 | 35 | 2017 |
Decision support to choose renovation actions in order to reduce house energy consumption–An applied approach F Taillandier, L Mora, D Breysse Building and Environment 109, 121-134, 2016 | 34 | 2016 |
Uncertainty processing and risk monitoring in construction projects using hierarchical probabilistic relational models C Baudrit, F Taillandier, TTP Tran, D Breysse Computer‐Aided Civil and Infrastructure Engineering 34 (2), 97-115, 2019 | 30 | 2019 |
Evolutive Risk Breakdown Structure for managing construction project risks: application to a railway project in Algeria F Hamzaoui, F Taillandier, R Mehdizadeh, D Breysse, A Allal European journal of environmental and civil engineering 19 (2), 238-262, 2015 | 28 | 2015 |
A Life Cycle Assessment model of End-of-life scenarios for building deconstruction and waste management E Quéheille, A Ventura, N Saiyouri, F Taillandier Journal of Cleaner Production 339, 130694, 2022 | 27 | 2022 |
Optimization of strategy planning for building deconstruction E Queheille, F Taillandier, N Saiyouri Automation in Construction 98, 236-247, 2019 | 26 | 2019 |
Multi-criteria reverse engineering for food: Genesis and ongoing advances R Thomopoulos, C Baudrit, N Boukhelifa, R Boutrou, P Buche, E Guichard, ... Food Engineering Reviews 11, 44-60, 2019 | 25 | 2019 |
Multi-criteria diagnosis of control knowledge for cartographic generalisation P Taillandier, F Taillandier European Journal of Operational Research 217 (3), 633-642, 2012 | 24 | 2012 |
Method and tools for building maintenance plan arbitration F Taillandier, G Sauce, R Bonetto Engineering, Construction and Architectural Management 18 (4), 343-362, 2011 | 23 | 2011 |
Dynamic and multi perspective risk management in construction with a special view to temporary structures R Mehdizadeh, D Breysse, F Taillandier, H Niandou Civil Engineering and Environmental Systems, 1-15, 2012 | 20 | 2012 |
An agent-based model to simulate inhabitants’ behavior during a flood event F Taillandier, P Di Maiolo, P Taillandier, C Jacquenod, ... International Journal of Disaster Risk Reduction 64, 102503, 2021 | 19 | 2021 |
Risk-based investment trade-off related to building facility management F Taillandier, G Sauce, R Bonetto Reliability Engineering & System Safety 94 (4), 785-795, 2009 | 19 | 2009 |
SPRITE–Participatory simulation for raising awareness about coastal flood risk on the oleron island C Adam, F Taillandier, E Delay, O Plattard, M Toumi Information Systems for Crisis Response and Management in Mediterranean …, 2016 | 18 | 2016 |
A new agent-based model to manage construction project risks–application to the crossroad of Bab El Karmadine at Tlemcen F Taillandier, P Taillandier, F Hamzaoui, D Breysse European Journal of Environmental and Civil Engineering 20 (10), 1197-1213, 2016 | 15 | 2016 |