关注
Mohd Reeza Yusof
Mohd Reeza Yusof
Lecturer, Universiti Teknologi MARA (UiTM)
在 salam.uitm.edu.my 的电子邮件经过验证
标题
引用次数
引用次数
年份
Enhancing the quality of life by adopting sustainable modular industrialised building system (IBS) in the Malaysian construction industry
MF Musa, MF Mohammad, R Mahbub, MR Yusof
Procedia-Social and Behavioral Sciences 153, 79-89, 2014
892014
Towards the adoption of modular construction and prefabrication in the construction environment: A case study in Malaysia
MF Musa, MR Yusof, MF Mohammad, NS Samsudin
Journal of Engineering and Applied Sciences 11 (13), 8122-8131, 2016
462016
The potential application of IBS modular system in the construction of housing scheme in Malaysia
MF Mohammad, AS Baharin, MF Musa, MR Yusof
Procedia-Social and Behavioral Sciences 222, 75-82, 2016
342016
Characteristics of Modular Construction: Meeting the Needs of Sustainability and Innovation
MF Musa, MR Yusof, MF Mohammad, R Mahbub
2014 IEEE Colloquium on Humanities, Science and Engineering (CHUSER), At …, 2014
312014
The way forward for industrialised building system (IBS) in Malaysia
MF Musa, MF Mohammad, MR Yusof, R Mahbub
InCIEC 2014: Proceedings of the International Civil and Infrastructure …, 2015
302015
Industrialised building system modular system (IBSMS) organisational readiness framework
MF Musa, MF Mohammad, MR Yusof, R Ahmad
Procedia-Social and Behavioral Sciences 222, 83-92, 2016
272016
Identification of Critical Factors and Difficulties for Industrialised Building System (IBS) Formwork in Malaysian Construction Industry–A Literature Review
MN Baharuddin, NF Bahardin, MA Zaidi, MR Yusof, I Lokman
2nd international Conference on Science and Social Research (CSSR 2015), 2015
192015
Adopting modular construction in the Malaysian construction industry
MF Musa, MF Mohammad, R Mahbub, MR Yusof
Asian Journal of Environment-Behaviour Studies 3 (10), 1-9, 2018
152018
Literature mapping: Critical factors in industrialized building system plastic formwork application
MAA Ghazali, NF Bahardin, MA Zaidi, MN Baharuddin, MR Yusof
International Review of Management and Marketing 6 (7), 204-208, 2016
92016
Industrialised Building System (IBS) Plan of Work
MR Yusof, MF Musa, NS Samsudin, MF Mohammad, MN Baharuddin
International Review of Management and Marketing 6 (7), 299-305, 2016
72016
The Green Building Approach towards Achieving Sustainability
MF Musa, MF Mohammad, MR Yusof, R Mahbub
International Colloquium on Science and Technology 2014 (ICOST 2014), At …, 2014
72014
Key Success Factors in IBS Project Management
MR Yusof, AH Nawawi, MF Mohammad, MF Musa
2014 IEEE Colloquium on Humanities, Science and Engineering Research (CHUSER …, 2014
72014
Industrialised building system (IBS)/Off-Site project management life cycle
MR Yusof, MF Musa, NS Samsudin, MF Mohammad, MN Baharuddin
European Proceedings of Social and Behavioural Sciences, 2016
62016
The Awareness Among Developers on Rainwater Harvesting System (RWHS)
S Mohamad, MF Mohammad, MR Yusof, MF Musa
International Colloquium on Science and Technology 2014 (ICOST 2014), At …, 2014
62014
IMPROVEMENTS OF THE COMMUNICATION BETWEEN CONSULTANTS AND CONTRACTORS DURING THE CONSTRUCTION PHASE IN MALAYSIA
MAM Fateh, RA Arshad, SMA Marzuki, MR Yusof
Planning Malaysia 21, 2023
52023
The Absence of Smart Technology as One of The Key Factors of Transportation in Modular Construction: A Case Study in Malaysia
MR Yusof, MNM Nawi, IL Jabar
Journal of Advanced Research in Applied Sciences and Engineering Technology …, 2023
52023
Strategic level implementation: development criteria for IBS formwork system readiness framework (IBS FOSREF) for Malaysian construction industry
MN Baharuddin, NF Bahardin, MA Zaidi, MR Yusof
MATEC Web of Conferences 266, 05009, 2019
42019
The industrialised building system modular system (IBSMS) Framework
MF Musa, MR Yusof, NS Samsudin, FM Halil
Proceedings of 5th AMER International Conference on Quality of Life, Bangkok …, 2017
32017
Adopting industrialisation in the construction environment: meeting the requirements of sustainability
MF Musa, MR Yusof, NS Samsudin, F Muhamad Halil
Scientific Research Journal 13 (2), 45-66, 2016
22016
Industrialised Building System (IBS) project management and project performance
MR Yusof
Universiti Teknologi MARA, 2012
12012
系统目前无法执行此操作,请稍后再试。
文章 1–20