Enhancing the quality of life by adopting sustainable modular industrialised building system (IBS) in the Malaysian construction industry MF Musa, MF Mohammad, R Mahbub, MR Yusof Procedia-Social and Behavioral Sciences 153, 79-89, 2014 | 89 | 2014 |
Towards the adoption of modular construction and prefabrication in the construction environment: A case study in Malaysia MF Musa, MR Yusof, MF Mohammad, NS Samsudin Journal of Engineering and Applied Sciences 11 (13), 8122-8131, 2016 | 46 | 2016 |
The potential application of IBS modular system in the construction of housing scheme in Malaysia MF Mohammad, AS Baharin, MF Musa, MR Yusof Procedia-Social and Behavioral Sciences 222, 75-82, 2016 | 34 | 2016 |
Characteristics of Modular Construction: Meeting the Needs of Sustainability and Innovation MF Musa, MR Yusof, MF Mohammad, R Mahbub 2014 IEEE Colloquium on Humanities, Science and Engineering (CHUSER), At …, 2014 | 31 | 2014 |
The way forward for industrialised building system (IBS) in Malaysia MF Musa, MF Mohammad, MR Yusof, R Mahbub InCIEC 2014: Proceedings of the International Civil and Infrastructure …, 2015 | 30 | 2015 |
Industrialised building system modular system (IBSMS) organisational readiness framework MF Musa, MF Mohammad, MR Yusof, R Ahmad Procedia-Social and Behavioral Sciences 222, 83-92, 2016 | 27 | 2016 |
Identification of Critical Factors and Difficulties for Industrialised Building System (IBS) Formwork in Malaysian Construction Industry–A Literature Review MN Baharuddin, NF Bahardin, MA Zaidi, MR Yusof, I Lokman 2nd international Conference on Science and Social Research (CSSR 2015), 2015 | 19 | 2015 |
Adopting modular construction in the Malaysian construction industry MF Musa, MF Mohammad, R Mahbub, MR Yusof Asian Journal of Environment-Behaviour Studies 3 (10), 1-9, 2018 | 15 | 2018 |
Literature mapping: Critical factors in industrialized building system plastic formwork application MAA Ghazali, NF Bahardin, MA Zaidi, MN Baharuddin, MR Yusof International Review of Management and Marketing 6 (7), 204-208, 2016 | 9 | 2016 |
Industrialised Building System (IBS) Plan of Work MR Yusof, MF Musa, NS Samsudin, MF Mohammad, MN Baharuddin International Review of Management and Marketing 6 (7), 299-305, 2016 | 7 | 2016 |
The Green Building Approach towards Achieving Sustainability MF Musa, MF Mohammad, MR Yusof, R Mahbub International Colloquium on Science and Technology 2014 (ICOST 2014), At …, 2014 | 7 | 2014 |
Key Success Factors in IBS Project Management MR Yusof, AH Nawawi, MF Mohammad, MF Musa 2014 IEEE Colloquium on Humanities, Science and Engineering Research (CHUSER …, 2014 | 7 | 2014 |
Industrialised building system (IBS)/Off-Site project management life cycle MR Yusof, MF Musa, NS Samsudin, MF Mohammad, MN Baharuddin European Proceedings of Social and Behavioural Sciences, 2016 | 6 | 2016 |
The Awareness Among Developers on Rainwater Harvesting System (RWHS) S Mohamad, MF Mohammad, MR Yusof, MF Musa International Colloquium on Science and Technology 2014 (ICOST 2014), At …, 2014 | 6 | 2014 |
IMPROVEMENTS OF THE COMMUNICATION BETWEEN CONSULTANTS AND CONTRACTORS DURING THE CONSTRUCTION PHASE IN MALAYSIA MAM Fateh, RA Arshad, SMA Marzuki, MR Yusof Planning Malaysia 21, 2023 | 5 | 2023 |
The Absence of Smart Technology as One of The Key Factors of Transportation in Modular Construction: A Case Study in Malaysia MR Yusof, MNM Nawi, IL Jabar Journal of Advanced Research in Applied Sciences and Engineering Technology …, 2023 | 5 | 2023 |
Strategic level implementation: development criteria for IBS formwork system readiness framework (IBS FOSREF) for Malaysian construction industry MN Baharuddin, NF Bahardin, MA Zaidi, MR Yusof MATEC Web of Conferences 266, 05009, 2019 | 4 | 2019 |
The industrialised building system modular system (IBSMS) Framework MF Musa, MR Yusof, NS Samsudin, FM Halil Proceedings of 5th AMER International Conference on Quality of Life, Bangkok …, 2017 | 3 | 2017 |
Adopting industrialisation in the construction environment: meeting the requirements of sustainability MF Musa, MR Yusof, NS Samsudin, F Muhamad Halil Scientific Research Journal 13 (2), 45-66, 2016 | 2 | 2016 |
Industrialised Building System (IBS) project management and project performance MR Yusof Universiti Teknologi MARA, 2012 | 1 | 2012 |