A new interval type-2 fuzzy approach for multi-scenario project cash flow assessment based on alternative queuing method and dependency structure matrix with a case study SA Mirnezami, SM Mousavi, V Mohagheghi Engineering Applications of Artificial Intelligence 95, 103815, 2020 | 25 | 2020 |
An innovative interval type-2 fuzzy approach for multi-scenario multi-project cash flow evaluation considering TODIM and critical chain with an application to energy sector SA Mirnezami, SM Mousavi, V Mohagheghi Neural Computing and Applications 33, 2263-2284, 2021 | 13 | 2021 |
A new approach for multi-scenario project cash flow analysis based on TODIM and critical chain methods under grey uncertainty S Ali Mirnezami, S Meysam Mousavi, J Antucheviciene, V Mohagheghi Economic Computation & Economic Cybernetics Studies & Research 54 (2), 2020 | 6 | 2020 |
An integrated chance-constrained stochastic model for a preemptive multi-skilled multi-mode resource-constrained project scheduling problem: a case study of building a sports … SA Mirnezami, R Tavakkoli-Moghaddam, R Shahabi-Shahmiri, ... Engineering Applications of Artificial Intelligence 126, 106726, 2023 | 3 | 2023 |
A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem M Ghasemi, RK Chakrabortty, R Shahabi-Shahmiri, SA Mirnezami International Journal of Construction Management 24 (10), 1090-1106, 2024 | 1 | 2024 |
Multi-skill resource-constrained project scheduling problem considering overlapping: fuzzy multi-objective programming approach to a case study F Zarei, M Arashpour, SA Mirnezami, R Shahabi-Shahamiri, M Ghasemi International Journal of Construction Management 24 (8), 820-833, 2024 | 1 | 2024 |
A robust chance-constrained programming approach for a bi-objective pre-emptive multi-mode resource-constrained project scheduling problem with time crashing R Shahabi-Shahmiri, TS Kyriakidis, M Ghasemi, SA Mirnezami, S Mirjalili International Journal of Systems Science: Operations & Logistics 10 (1), 2253147, 2023 | | 2023 |
A new mathematical model for the time-cost-risk trade-off problem considering different execution modes under fuzzy uncertainty SM Mousavi, SA Mirnezami 6th International Conference on Industrial and Systems Engineering, 2020 | | 2020 |
Fuzzy optimization for the project portfolio selection problem considering crashing activities and due date under uncertainty SA Mirnezami, SM Mousavi 6th International Conference on Industrial and Systems Engineering, 2020 | | 2020 |
A Fuzzy Location-Allocation Problem for Sustainable Design of a Municipal Solid Waste Management Network SA Mirnezami, A Siadat, R Shahabi Journal of Quality Engineering and Production Optimization 5 (1), 165-188, 2020 | | 2020 |
A new grey approach for multi-scenario project cash flow analysis based on TODIM method in construction industry with case study SA Mirnezami, SM Mousavi, V Mohagheghi 15th Iran International Industrial Engineering Conference, 2019 | | 2019 |