SCRIS: A knowledge‐based system tool for assisting manufacturing organizations in identifying supply chain risks B Kayis, P Dana Karningsih Journal of Manufacturing Technology Management 23 (7), 834-852, 2012 | 99 | 2012 |
Managing quality risk in a frozen shrimp supply chain: a case study D Anggrahini, PD Karningsih, M Sulistiyono Procedia Manufacturing 4, 252-260, 2015 | 72 | 2015 |
Penerapan lean manufacturing untuk mereduksi waste di PT Arisu FW Hazmi, PD Karningsih Jurnal Teknik ITS 1 (1), F135-F140, 2012 | 67 | 2012 |
Development of integrated model for managing risk in lean manufacturing implementation: a case study in an Indonesian manufacturing company W Widiasih, PD Karningsih, U Ciptomulyono Procedia Manufacturing 4, 282-290, 2015 | 56 | 2015 |
New product development from inactive problem perspective in indonesian SMEs to open innovation R Prabowo, ML Singgih, PD Karningsih, E Widodo Journal of Open Innovation: Technology, Market, and Complexity 6 (1), 20, 2020 | 43 | 2020 |
Mitigating risk in the tuna supply through traceability system development SM Parenreng, N Pujawan, PD Karningsih, P Engelseth | 36 | 2016 |
Concurrent engineering implementation assessment: a case study in an Indonesian manufacturing company PD Karningsih, D Anggrahini, MI Syafi’i Procedia Manufacturing 4, 200-207, 2015 | 28 | 2015 |
Perancangan manajemen risiko operasional di PT. X dengan menggunakan metode house of risk AR Maharani, PD Karningsih Institut Teknologi Sepuluh Nopember Surabaya, 2018 | 27 | 2018 |
Automated fish feeding system for an offshore aquaculture unit PD Karningsih, R Kusumawardani, N Syahroni, Y Mulyadi, M Saad IOP Conference Series: Materials Science and Engineering 1072 (1), 012073, 2021 | 18 | 2021 |
Four phases Quality Function Deployment (QFD) by considering KANO concept, time and manufacturing cost ML Singgih, DL Trenggonowati, PD Karningsih International Conference on Engineering and Technology Development (ICETD), 2013 | 18 | 2013 |
Design for manufacturing, assembly, and reliability: An integrated framework for product redesign and innovation AI Juniani, ML Singgih, PD Karningsih Designs 6 (5), 88, 2022 | 14 | 2022 |
Mapping risks of Indonesian tuna supply chain PD Karningsih, D Anggrahini, N Kurniati, M Suef, AR Fachrur, N Syahroni IOP Conference Series: Materials Science and Engineering 337 (1), 012035, 2018 | 13 | 2018 |
Performance model development for assessing maintenance service providers using the Kano model P Dalulia, ML Singgih, PD Karningsih, M Suef Journal of Business and Retail Management Research 13 (1), 225-231, 2018 | 13 | 2018 |
Identifikasi Risiko pada saat Implementasi Lean Manufacturing dengan Metode Delphi W Widiasih, PD Karningsih, U Ciptomulyono Seminar Nasional MMT 23, 2015 | 12 | 2015 |
Lean Assessment Matrix: A Proposed Supporting Tool for Lean Manufacturing Implementation PD Karningsih, AT Pangesti, M Suef IOP Conference Series: Materials Science and Engineering 598 (1), 012082, 2019 | 10 | 2019 |
Readiness assessment towards smart manufacturing system for tuna processing industry in Indonesia D Anggrahini, N Kurniati, PD Karningsih, SM Parenreng, N Syahroni IOP conference series: Materials science and engineering 337 (1), 012060, 2018 | 10 | 2018 |
Improving project efficiency using lean construction PD Karningsih, D Anggrahini, MB Karim, R Adhitama 2017 International Conference on Advanced Mechatronics, Intelligent …, 2017 | 10 | 2017 |
Development of supply chain risks interrelationships model using interpretive structural modeling and analytical network process CD Indrawati, PD Karningsih, I Vanany IPTEK Journal of Proceedings Series 1 (1), 2015 | 10 | 2015 |
Development of knowledge based system for supply chain risk identification in multi-site & multi-partners global manufacturing supply chain PD Karningsih, B Kayis, S Kara Proceedings of the 13th Asia Pacific Management Conference, 466-471, 2007 | 10 | 2007 |
Deteksi dan Klasifikasi Cacat Kemasan Kaleng Menggunakan Convolutional Neural Network R Kusumawardani, PD Karningsih PROZIMA (Productivity, Optimization and Manufacturing System Engineering) 4 …, 2020 | 9* | 2020 |