Effective market monitoring in deregulated electricity markets AF Rahimi, AY Sheffrin IEEE Transactions on Power systems 18 (2), 486-493, 2003 | 158 | 2003 |
Predicting market power using the residual supply index A Sheffrin FERC market monitoring workshop, 3-4, 2002 | 127 | 2002 |
Using market simulations for economic assessment of transmission upgrades: Application of the California ISO approach ML Awad, KE Casey, AS Geevarghese, JC Miller, AF Rahimi, AY Sheffrin, ... Restructured Electric Power Systems, 241-270, 2010 | 39 | 2010 |
Watching watts to prevent abuse of power AY Sheffrin, J Chen, BF Hobbs IEEE Power and Energy magazine 2 (4), 58-65, 2004 | 38 | 2004 |
Empirical evidence of strategic bidding in California ISO real time market A Sheffrin Department of Market Analysis, California ISO, 2001 | 36 | 2001 |
Critical actions necessary for effective market monitoring A Sheffrin Draft Comments Dept of Market Analysis, California ISO, FERC RTO Workshop, 2001 | 33 | 2001 |
Empirical evidence of strategic bidding in the California ISO real-time market A Sheffrin Electricity pricing in transition, 267-281, 2002 | 30 | 2002 |
Predicting market power in wholesale electricity markets A Sheffrin, J Chen Proc. of the Western Conference of the Advances in Regulation and …, 2002 | 26 | 2002 |
The California ISO transmission economic assessment methodology (TEAM): principles and application to Path 26 M Awad, S Broad, KE Casey, J Chen, AS Geevarghese, JC Miller, ... 2006 IEEE Power Engineering Society General Meeting, 8 pp., 2006 | 22 | 2006 |
The California ISO transmission economic assessment methodology M Awad, S Broad, K Casey, J Chen, A Geevarghese, J Miller, A Sheffrin, ... Electricity Transmission in Deregulated Markets, Pittsburgh PA, 2004 | 19 | 2004 |
Adapting California's energy markets to growth in renewable resources JE Price, A Sheffrin IEEE PES General Meeting, 1-8, 2010 | 15 | 2010 |
Gains from trade and benefits of transmission expansion for the IEEE Power Engineering Society A Sheffrin IEEE Power Engineering Society General Meeting, 2005, 2804-2807, 2005 | 14 | 2005 |
California power crisis: failure of market design or regulation? A Sheffrin IEEE Power Engineering Review 22 (8), 8-11, 2002 | 13 | 2002 |
Methodology for analyzing transmission upgrades: Two alternative proposals A Sheffrin, FA Wolak mimeo California ISO, 2001 | 10 | 2001 |
Achieving competitive energy markets through effective structure rules and regulatory oversight A Sheffrin ABA Annual Antitrust Meeting, 2002 | 7 | 2002 |
Transmission Economic Assessment Methodology (TEAM) A Sheffrin, M Awad, S Broad, J Chen, A Geevarghese, J Miller, E Toolson, ... California ISO: Folsom, CA, USA, 2004 | 5 | 2004 |
California Power Crisis: Viewpoint of the System Operator A Sheffren World Bank Group Infrastructure Forum”, May 9th, 2001 | 3 | 2001 |
Market analysis report A Sheffrin July 25, 2001, 2001 | 3 | 2001 |
Impact of Market Prices on the Economic Feasibility of Transmission Expansions Toolson, Sheffrin 2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition …, 2006 | 1 | 2006 |