关注
Xinyu Li
Xinyu Li
Associate Professor of Industrial Engineering, Huazhong University of Science & Technology
在 hust.edu.cn 的电子邮件经过验证 - 首页
标题
引用次数
引用次数
年份
Integration of process planning and scheduling—a modified genetic algorithm-based approach
X Shao, X Li, L Gao, C Zhang
Computers & Operations Research 36 (6), 2082-2096, 2009
2772009
Mathematical modeling and evolutionary algorithm-based approach for integrated process planning and scheduling
X Li, L Gao, X Shao, C Zhang, C Wang
Computers & Operations Research 37 (4), 656-667, 2010
1782010
A GEP-based reactive scheduling policies constructing approach for dynamic flexible job shop scheduling problem with job release dates
L Nie, L Gao, P Li, X Li
Journal of Intelligent Manufacturing 24 (4), 763-774, 2013
1502013
Application of game theory based hybrid algorithm for multi-objective integrated process planning and scheduling
X Li, L Gao, W Li
Expert Systems with Applications 39 (1), 288-297, 2012
1462012
An agent-based approach for integrated process planning and scheduling
X Li, C Zhang, L Gao, W Li, X Shao
Expert Systems with Applications 37 (2), 1256-1264, 2010
1392010
A review on integrated process planning and scheduling
X Li, L Gao, C Zhang, X Shao
International Journal of Manufacturing Research 5 (2), 161-180, 2010
1372010
A hybrid genetic algorithm and tabu search for a multi-objective dynamic job shop scheduling problem
L Zhang, L Gao, X Li
International Journal of Production Research 51 (12), 3516-3531, 2013
1292013
A differential evolution algorithm with intersect mutation operator
Y Zhou, X Li, L Gao
Applied Soft Computing 13 (1), 390-401, 2013
1192013
An efficient memetic algorithm for solving the job shop scheduling problem
L Gao, G Zhang, L Zhang, X Li
Computers & Industrial Engineering 60 (4), 699-705, 2011
1192011
An effective hybrid algorithm for integrated process planning and scheduling
X Li, X Shao, L Gao, W Qian
International Journal of Production Economics 126 (2), 289-298, 2010
1102010
Integrated process planning and scheduling using an imperialist competitive algorithm
K Lian, C Zhang, L Gao, X Li
International Journal of Production Research 50 (15), 4326-4343, 2012
1012012
Application of an efficient modified particle swarm optimization algorithm for process planning
X Li, L Gao, X Wen
The International Journal of Advanced Manufacturing Technology 67 (5-8 …, 2013
952013
An active learning genetic algorithm for integrated process planning and scheduling
X Li, L Gao, X Shao
Expert Systems with Applications 39 (8), 6683-6691, 2012
892012
Dynamic rescheduling in FMS that is simultaneously considering energy consumption and schedule efficiency
L Zhang, X Li, L Gao, G Zhang
The International Journal of Advanced Manufacturing Technology, 1-13, 2013
792013
Modeling and impact factors analyzing of energy consumption in CNC face milling using GRASP gene expression programming
Y Yang, X Li, L Gao, X Shao
The International Journal of Advanced Manufacturing Technology, 1-17, 2013
76*2013
Application of memetic algorithm in assembly sequence planning
L Gao, W Qian, X Li, J Wang
The International Journal of Advanced Manufacturing Technology 49 (9-12 …, 2010
732010
Optimization of flexible process planning by genetic programming
XY Li, XY Shao, L Gao
The International Journal of Advanced Manufacturing Technology 38 (1-2), 143-153, 2008
702008
An effective cellular particle swarm optimization for parameters optimization of a multi-pass milling process
L Gao, J Huang, X Li
Applied Soft Computing 12 (11), 3490-3499, 2012
622012
Honey bees mating optimization algorithm for process planning problem
X Wen, X Li, L Gao, H Sang
Journal of Intelligent Manufacturing 25 (3), 459-472, 2014
562014
A hybrid intelligent algorithm and rescheduling technique for job shop scheduling problems with disruptions
L Zhang, L Gao, X Li
The International Journal of Advanced Manufacturing Technology 65 (5-8 …, 2013
422013
系统目前无法执行此操作,请稍后再试。
文章 1–20