A Study on the Influences of Exclusive Stopping Space on Saturation Flow (Case Study: Bandar Lampung) A Purba, I Kustiani, G Pramita International Conference on Science, Technology & Environment (ICoSTE), 2019 | 213 | 2019 |
Komparasi Pembangunan Kereta Cepat di Indonesia Dengan Kereta Cepat di Negara Lain dari Sudut Pandang Ekonomi F Lestari, A Purba, A Zakaria Prosiding Semnas SINTA FT UNILA Vol. 1 Tahun 2018 1 (1), 266-272, 2018 | 82 | 2018 |
Perbandingan mutu paving block produksi manual dengan produksi masinal S Sebayang, IW Diana, A Purba Jurnal rekayasa 15 (2), 2011 | 44 | 2011 |
A Study on the Influences of Exclusive Stopping Space on Saturation Flow (Case Study: Bandar Lampung),‖ SSRN Electron A Purba, I Kustiani, G Pramita J, 2019 | 39 | 2019 |
Edukasi Implementasi Undang–Undang Keinsinyuran Pada Aparatur Sipil Negara (Asn) Pemerintahan Kabupaten Di Lampung D Despa, R Widyawati, A Purba, T Septiana PROSIDING SENAPATI SEMINAR NASIONAL PENGABDIAN KEPADA MASYARAKAT TEKNOLOGI …, 2020 | 27 | 2020 |
Strategic Collaboration ICT in the online Transportation Services in Jakarta Area JT Purba, S Samuel, A Purba IOP Conference Series: Materials Science and Engineering 918 (1), 012206, 2020 | 22 | 2020 |
Perencanaan Pengembangan Aspek Teknis Operasional Dan Finansial Pengelolaan Sampah Kabupaten Mesuji S Farid, A Purba Jurnal Profesi insinyur Universitas Lampung 1 (2), 1-12, 2020 | 20 | 2020 |
Studi Penggunaan Beton Pracetak untuk Pembangunan Saluran Irigasi pada Musim Hujan AS Chuing, F Murdapa, A Purba Jurnal Profesi Insinyur Universitas Lampung 2 (1), 26-33, 2021 | 16 | 2021 |
A current review of high speed railways experiences in Asia and Europe A Purba, F Nakamura, CN Dwsbu, M Jafri, P Pratomo AIP Conference Proceedings 1903 (1), 2017 | 16 | 2017 |
Jakarta-Bandung High-Speed rail transportation project: facts and challenges A Purba, JT Purba IOP Conference Series: Materials Science and Engineering 918 (1), 012034, 2020 | 15 | 2020 |
Risks leading to cost overrun in construction projects: A systematic literature review M Enrica, HH Purba, A Purba Advance Researches in Civil Engineering 3 (1), 43-60, 2021 | 14 | 2021 |
Penerapan Beton Kekuatan Awal Tinggi Untuk Percepatan Pekerjaan Jembatan Cast in Place Balanced Cantilever Prestressed Box Girder DA Susanto, A Purba, F Murdapa Jurnal Profesi Insinyur Universitas Lampung 1 (1), 5-10, 2020 | 14 | 2020 |
Similarity Check: Turnitin Fighting Poverty Gap through Literacy and Electricity: A Case from Indonesia A Purba Proceedings of the 11th Annual International Conference on Industrial …, 2021 | 13 | 2021 |
Evaluasi Kapasitas Parkir Unila Berdasarkan Kebutuhan Satuan Ruang Parkir (SRP) HT Pambudi UNIVERSITAS LAMPUNG, 2018 | 13 | 2018 |
Analisis Ekonomi dan Finansial Kereta Cepat Jakarta–Bandung OT Giantara Fakultas Teknik, 2018 | 11 | 2018 |
Similarity Check: Turnitin TRANSIT SYSTEM SERVICE QUALITY IN A TOURISM-EDUCATION CITY AND A BUSINESS CITY A Purba International Journal of Technology, 2017 | 11 | 2017 |
System dynamic modeling of risk management in construction projects: A systematic literature review E Wardito, HH Purba, A Purba Operational research in engineering sciences: theory and applications 4 (1 …, 2021 | 9 | 2021 |
Similarity Check: Turnitin THE CHALLENGE OF DEVELOPING HIGH-SPEED RAIL PROJECTS: RECENT EVIDENCE FROM DEVELOPING COUNTRIES A Purba International Journal of GEOMATE, 2020 | 9 | 2020 |
SERVICE DELIVERED ON NEW TRANSIT SYSTEM FROM USERS VIEWPOINT (CASE STUDIES: TRANSJOGJA AND TRANSMUSI-INDONESIA) A Purba, F Nakamura, D Herianto | 9 | 2017 |
Similarity Check: Turnitin Online Learning Transformation Technology in Higher Education: Challenges & Strategy A Purba Proceedings of the 11th Annual International Conference on Industrial …, 2021 | 8 | 2021 |