A review of integrated analysis of production-distribution systems AM Sarmiento, R Nagi IIE transactions 31 (11), 1061-1074, 1999 | 545 | 1999 |
A review of agile manufacturing systems LM Sanchez, R Nagi International journal of production research 39 (16), 3561-3600, 2001 | 533 | 2001 |
Robust supply chain design under uncertain demand in agile manufacturing F Pan, R Nagi Computers & operations research 37 (4), 668-683, 2010 | 385 | 2010 |
An efficient heuristic in manufacturing cell formation for group technology applications G Harhalakis, R Nagi, JM Proth The International Journal of Production Research 28 (1), 185-198, 1990 | 368 | 1990 |
Fuzzy set theory applications in production management research: a literature survey AL Guiffrida, R Nagi Journal of intelligent manufacturing 9, 39-56, 1998 | 278 | 1998 |
STEP-based feature extraction from STEP geometry for agile manufacturing MP Bhandarkar, R Nagi Computers in industry 41 (1), 3-24, 2000 | 252 | 2000 |
Multiple routeings and capacity considerations in group technology applications R Nagi, G Harhalakis, JM Proth The International Journal of Production Research 28 (12), 1243-1257, 1990 | 209 | 1990 |
Priority-based assignment and routing of a fleet of unmanned combat aerial vehicles VK Shetty, M Sudit, R Nagi Computers & Operations Research 35 (6), 1813-1828, 2008 | 203 | 2008 |
Design and implementation of a virtual information system for agile manufacturing L Song, R Nagi IIE transactions 29 (10), 839-857, 1997 | 168 | 1997 |
Multi-echelon supply chain network design in agile manufacturing F Pan, R Nagi Omega 41 (6), 969-983, 2013 | 144 | 2013 |
Cost characterizations of supply chain delivery performance AL Guiffrida, R Nagi International Journal of Production Economics 102 (1), 22-36, 2006 | 139 | 2006 |
Simultaneous sensor selection and routing of unmanned aerial vehicles for complex mission plans F Mufalli, R Batta, R Nagi Computers & Operations Research 39 (11), 2787-2799, 2012 | 137 | 2012 |
Data fusion/data mining-based architecture for condition-based maintenance D Raheja, J Llinas, R Nagi, C Romanowski International journal of production research 44 (14), 2869-2887, 2006 | 116 | 2006 |
Scheduling injection molding operations with multiple resource constraints and sequence dependent setup times and costs SG Dastidar, R Nagi Computers & Operations Research 32 (11), 2987-3005, 2005 | 102 | 2005 |
Migrating from IGES to STEP: one to one translation of IGES drawing to STEP drafting data MP Bhandarkar, B Downie, M Hardwick, R Nagi Computers in industry 41 (3), 261-277, 2000 | 102 | 2000 |
Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies MF Anwar, R Nagi International Journal of Production Research 36 (3), 653-681, 1998 | 92 | 1998 |
A data mining approach to forming generic bills of materials in support of variant design activities CJ Romanowski, R Nagi J. Comput. Inf. Sci. Eng. 4 (4), 316-328, 2004 | 88 | 2004 |
GPU-accelerated Hungarian algorithms for the linear assignment problem K Date, R Nagi Parallel Computing 57, 52-72, 2016 | 79 | 2016 |
Modeling of workflow congestion and optimization of flow routing in a manufacturing/warehouse facility M Zhang, R Batta, R Nagi Management Science 55 (2), 267-280, 2009 | 79 | 2009 |
Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups MF Anwar, R Nagi International Journal of production research 35 (5), 1447-1470, 1997 | 78 | 1997 |