Solving group scheduling problem in no-wait flexible flowshop with random machine breakdown A Adressi, S Hassanpour, V Azizi Decision Science Letters 5 (1), 157-168, 2016 | 25 | 2016 |
Supply Chain Performance Evaluation Using Data Envelopment Analysis (A case study of tile industry) AH Rezaei, A Adressi International Journal of Supply and Operations Management 2 (2), 748-758, 2015 | 11 | 2015 |
Solving group scheduling problem in no-wait flow shop with sequence dependent setup times A Adressi, R Bashirzadeh, V Azizi, S Tasouji Hassanpour Journal of Modern Processes in Manufacturing and Production 3 (1), 5-16, 2014 | 3 | 2014 |
Scheduling problem of virtual cellular manufacturing systems (VCMS); Using simulated annealing and genetic algorithm based heuristics ST Hassanpour, R Bashirzadeh, A Adressi, B Bahmankhah Journal of Modern Processes in Manufacturing and Production 3 (4), 2014 | 3 | 2014 |
حل مساله زمانبندی جریان کارگاهی برگشت پذیر بدون وقفه طسوجی حسن پور, امین ناصری, آدرسی نشریه پژوهش های مهندسی صنایع در سیستم های تولید 4 (9), 271-279, 2017 | | 2017 |
Solving Re-entrant No-wait Flow Shop Scheduling Problem (In Farsi) S Tasouji Hassanpour, MR Amin Naseri, A Adressi 11 th International Industrial Engineering Conference, 8, 2015 | | 2015 |
Solving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs M Naghibi, A Adressi Journal of Modern Processes in Manufacturing and Production 3 (2), 5-16, 2014 | | 2014 |
Solving Group Scheduling Problem in No-wait Flow Shop with Sequence dependent Setup Times (In Farsi) A Adressi, S Tasouji, R Bashirzadeh Industrial Engineering and System Conference, 8, 2014 | | 2014 |
EFQM 2013 مدل سرآمدی ابوالفضل آدرسی؛ مصطفی طرسکی نشر نوین, 2014 | | 2014 |
A Genetic Algorithm for Solving Virtual Cellular Manufacturing Systems Scheduling Problem (In Farsi) S Tasouji, R Bashirzadeh, A Adressi The 6th International Conference on Iranian Operations Research Society, 7, 2013 | | 2013 |
An ACO Algorithm for Solving Flow Shop Scheduling Problem with Parallel Machines (In Farsi) A Adressi, R Bashirzadeh, S Tasouji The 6th International Conference on Iranian Operations Research Society, 7, 2013 | | 2013 |
A Solution for Virtual Cellular Manufacturing System's Scheduling Problem Using an Ant Colony Optimization Model (In Farsi) S Tasouji Hassanpour, R Bashirzadeh, A Adressi 9th International Industrial Engineering Conference, 7, 2013 | | 2013 |
Solving Re-entrant No-wait Flow Shop Scheduling Problem A Adressi | | |
حل مساله زمانبندي جريان کارگاهي برگشت پذير بدون وقفه طسوجي حسن پور سعيد, امين ناصري محمدرضا, آدرسي ابوالفضل پژوهش هاي مهندسي صنايع در سيستم هاي توليد 4 (9), 271-279, 0 | | |