Enhancing decision-making flexibility by introducing a new last aggregation evaluating approach based on multi-criteria group decision making and Pythagorean fuzzy sets V Mohagheghi, SM Mousavi, B Vahdani Applied Soft Computing 61, 527-535, 2017 | 118 | 2017 |
R&D project evaluation and project portfolio selection by a new interval type-2 fuzzy optimization approach V Mohagheghi, SM Mousavi, B Vahdani, MR Shahriari Neural Computing and Applications 28, 3869-3888, 2017 | 96 | 2017 |
Selecting project-critical path by a new interval type-2 fuzzy decision methodology based on MULTIMOORA, MOOSRA and TPOP methods Y Dorfeshan, SM Mousavi, V Mohagheghi, B Vahdani Computers & Industrial Engineering 120, 160-178, 2018 | 87 | 2018 |
Project portfolio selection problems: a review of models, uncertainty approaches, solution techniques, and case studies V Mohagheghi, SM Mousavi, J Antuchevičienė, M Mojtahed VGTU Press, 2019 | 62 | 2019 |
A new optimization model for project portfolio selection under interval-valued fuzzy environment V Mohagheghi, SM Mousavi, B Vahdani Arabian Journal for Science and Engineering 40, 3351-3361, 2015 | 58 | 2015 |
Analyzing project cash flow by a new interval type-2 fuzzy model with an application to construction industry V Mohagheghi, SM Mousavi, B Vahdani Neural Computing and Applications 28, 3393-3411, 2017 | 55 | 2017 |
A new last aggregation method of multi-attributes group decision making based on concepts of TODIM, WASPAS and TOPSIS under interval-valued intuitionistic fuzzy uncertainty R Davoudabadi, SM Mousavi, V Mohagheghi Knowledge and Information Systems 62, 1371-1391, 2020 | 53 | 2020 |
Resilient supplier selection through introducing a new interval-valued intuitionistic fuzzy evaluation and decision-making framework R Davoudabadi, SM Mousavi, V Mohagheghi, B Vahdani Arabian Journal for Science and Engineering 44, 7351-7360, 2019 | 50 | 2019 |
A new multi-objective optimization approach for sustainable project portfolio selection: a realworld application under interval-valued fuzzy environment V Mohagheghi, SM Mousavi, B Vahdani Iranian Journal of Fuzzy Systems 13 (6), 41-68, 2016 | 45 | 2016 |
A new decision model based on DEA and simulation to evaluate renewable energy projects under interval-valued intuitionistic fuzzy uncertainty R Davoudabadi, SM Mousavi, V Mohagheghi Renewable Energy 164, 1588-1601, 2021 | 43 | 2021 |
A new soft computing model based on linear assignment and linear programming technique for multidimensional analysis of preference with interval type-2 fuzzy sets MH Haghighi, SM Mousavi, V Mohagheghi Applied Soft Computing 77, 780-796, 2019 | 40 | 2019 |
A mathematical modeling approach for high and new technology-project portfolio selection under uncertain environments V Mohagheghi, SM Mousavi, B Vahdani, A Siadat Journal of Intelligent & Fuzzy Systems 32 (6), 4069-4079, 2017 | 37 | 2017 |
Evaluating large, high-technology project portfolios using a novel interval-valued Pythagorean fuzzy set framework: An automated crane project case study V Mohagheghi, SM Mousavi, M Mojtahedi, S Newton Expert Systems with Applications 162, 113007, 2020 | 36 | 2020 |
A new approach of multi-criteria analysis for the evaluation and selection of sustainable transport investment projects under uncertainty: A case study V Mohagheghi, SM Mousavi, M Aghamohagheghi, B Vahdani International Journal of Computational Intelligence Systems 10 (1), 605-626, 2017 | 34 | 2017 |
Project portfolio selection problems: Two decades review from 1999 to 2019 V Mohagheghi, S Meysam Mousavi, M Mojtahedi Journal of Intelligent & Fuzzy Systems 38 (2), 1675-1689, 2020 | 32 | 2020 |
A new framework for high-technology project evaluation and project portfolio selection based on Pythagorean fuzzy WASPAS, MOORA and mathematical modeling V Mohagheghi, SM Mousavi Iranian Journal of Fuzzy Systems 16 (6), 89-106, 2019 | 32 | 2019 |
A new interval type-2 fuzzy approach for analyzing and monitoring the performance of megaprojects based on earned value analysis (with a case study) A Eshghi, SM Mousavi, V Mohagheghi Neural Computing and Applications 31, 5109-5133, 2019 | 29 | 2019 |
Sustainable infrastructure project selection by a new group decision-making framework introducing MORAS method in an interval type 2 fuzzy environment V Mohagheghi, SM Mousavi, J Antuchevičienė, Y Dorfeshan International Journal of Strategic Property Management 23 (6), 390-404, 2019 | 27 | 2019 |
A new analytical methodology to handle time-cost trade-off problem with considering quality loss cost under interval-valued fuzzy uncertainty MH Haghighi, SM Mousavi, J Antuchevičienė, V Mohagheghi Technological and Economic Development of Economy 25 (2), 277-299, 2019 | 27 | 2019 |
A new interval type-2 fuzzy approach for multi-scenario project cash flow assessment based on alternative queuing method and dependency structure matrix with a case study SA Mirnezami, SM Mousavi, V Mohagheghi Engineering Applications of Artificial Intelligence 95, 103815, 2020 | 25 | 2020 |