The difference between the managerial and mathematical interpretation of sensitivity analysis results in linear programming T Koltai, T Terlaky International Journal of Production Economics 65 (3), 257-274, 2000 | 106 | 2000 |
A flexible costing system for flexible manufacturing systems using activity based costing T Koltai, S Lozano, F Guerrero, L Onieva International Journal of Production Research 38 (7), 1615-1630, 2000 | 81 | 2000 |
Machine loading and part type selection in flexible manufacturing systems F Guerrero International Journal of Production Research 37 (6), 1303-1317, 1999 | 73 | 1999 |
Termelésmenedzsment K Tamás Typotex Kft, 2006 | 51* | 2006 |
An analysis of task assignment and cycle times when robots are added to human-operated assembly lines, using mathematical programming models T Koltai, I Dimény, V Gallina, A Gaal, C Sepe International Journal of Production Economics 242, 108292, 2021 | 44 | 2021 |
Evaluation of the results of a production simulation game using a dynamic DEA approach T Koltai, S Lozano, J Uzonyi-Kecskés, P Moreno Computers & Industrial Engineering 105, 1-11, 2017 | 33 | 2017 |
Analysis of the effect of learning on the throughput-time in simple assembly lines T Koltai, N Kalló Computers & industrial engineering 111, 507-515, 2017 | 28 | 2017 |
Route‐Independent Analysis of Available Capacity in Flexible Manufacturing Systems T Koltai, KE Stecke Production and Operations Management 17 (2), 211-223, 2008 | 25 | 2008 |
A practical approach to sensitivity analysis in linear programming under degeneracy for management decision making T Koltai, V Tatay International Journal of Production Economics 131 (1), 392-398, 2011 | 21 | 2011 |
Application of the results of simple assembly line balancing models in practice: the case of a bicycle manufacturer T Koltai, V Tatay, N Kalló International Journal of Computer Integrated Manufacturing 27 (9), 887-898, 2014 | 19 | 2014 |
Formulation of workforce skill constraints in assembly line balancing models T Koltai, V Tatay Optimization and engineering 14, 529-545, 2013 | 18 | 2013 |
Linear programming optimization of a network for an aluminum plant: A case study A Farkas, T Koltai, A Szendrovits International journal of production economics 32 (2), 155-168, 1993 | 18 | 1993 |
Formulation of simple workforce skill constraints in assembly line balancing models T Koltai, V Tatay Periodica Polytechnica Social and Management Sciences 19 (1), 43-50, 2011 | 17 | 2011 |
The application of data envelopment analysis in healthcare performance evaluation of rehabilitation departments in hungary RV Dénes, J Kecskés, T Koltai, Z Dénes Quality Innovation Prosperity 21 (3), 127-142, 2017 | 16 | 2017 |
The comparison of data envelopment analysis (DEA) and financial analysis results in a production simulation game T Koltai, J Uzonyi-Kecskés Acta Polytechnica Hungarica 14 (4), 167-185, 2017 | 16 | 2017 |
A termelésmenedzsment alapjai I T Koltai Műegyetemi Kiadó, 2003 | 15 | 2003 |
Application of Learning Curves in Operations Management Decisions A Tamás, T Koltai Periodica Polytechnica Social and Management Sciences, 2020 | 14 | 2020 |
Fixed cost oriented bottleneck analysis with linear programming T Koltai Omega 23 (1), 89-95, 1995 | 14 | 1995 |
Optimalizálás bizonytalan paraméterekkel a termelés-és szolgáltatásmenedzsmentben T Koltai, G Romhányi, V Tatay Vezetéstudomány-Budapest Management Review 40 (ksz), 68-73, 2009 | 12 | 2009 |
Examination of the sensitivity of an operation schedule with perturbation analysis T Koltai, J Larraneta, L Onieva THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 31 (12), 2777-2787, 1993 | 12 | 1993 |