Applied design of experiments and Taguchi methods K Krishnaiah, P Shahabudeen PHI Learning Pvt. Ltd., 2012 | 406 | 2012 |
Literature review of assembly line balancing problems P Sivasankaran, P Shahabudeen The International Journal of Advanced Manufacturing Technology 73, 1665-1694, 2014 | 311 | 2014 |
Quality management research by considering multi-response problems in the Taguchi method–a review R Jeyapaul, P Shahabudeen, K Krishnaiah The International Journal of Advanced Manufacturing Technology 26, 1331-1337, 2005 | 283 | 2005 |
Simultaneous optimization of multi-response problems in the Taguchi method using genetic algorithm R Jeyapaul, P Shahabudeen, K Krishnaiah The International Journal of Advanced Manufacturing Technology 30, 870-878, 2006 | 92 | 2006 |
Development of performance indicators for municipal solid waste management (PIMS): A review V Sanjeevi, P Shahabudeen Waste Management & Research 33 (12), 1052-1065, 2015 | 91 | 2015 |
Optimal routing for efficient municipal solid waste transportation by using ArcGIS application in Chennai, India V Sanjeevi, P Shahabudeen Waste Management & Research 34 (1), 11-21, 2016 | 88 | 2016 |
GA based heuristic for the open job shop scheduling problem P Senthilkumar, P Shahabudeen The international journal of advanced manufacturing technology 30, 297-301, 2006 | 70 | 2006 |
An improved genetic algorithm for the flowshop scheduling problem R Rajkumar, P Shahabudeen International Journal of Production Research 47 (1), 233-249, 2009 | 53 | 2009 |
Algorithm for the design of single-stage adaptive kanban system P Shahabudeen, GD Sivakumar Computers & Industrial Engineering 54 (4), 800-820, 2008 | 49 | 2008 |
Design of a two-card dynamic kanban system using a simulated annealing algorithm P Shahabudeen, K Krishnaiah, M Thulasi Narayanan The International Journal of Advanced Manufacturing Technology 21, 754-759, 2003 | 49 | 2003 |
Design of bi-criteria kanban system using simulated annealing technique P Shahabudeen, R Gopinath, K Krishnaiah Computers & Industrial Engineering 41 (4), 355-370, 2002 | 48 | 2002 |
Design of multi-stage adaptive kanban system GD Sivakumar, P Shahabudeen The International Journal of Advanced Manufacturing Technology 38, 321-336, 2008 | 42 | 2008 |
Strategic action grids: a study on supply chain risk management in manufacturing industries in India VV Shenoi, TNS Dath, C Rajendran, P Shahabudeen Benchmarking: An International Journal 25 (8), 3045-3061, 2018 | 33 | 2018 |
Replenishment policies for sustainable business development in a continuous credit based vendor managed inventory distribution system LA Michaelraj, P Shahabudeen Computers & Industrial Engineering 56 (1), 260-266, 2009 | 31 | 2009 |
Genetic algorithm based approach for vehicle routing problem with time windows M Rajmohan, P Shahabudeen International Journal of Logistics Systems and Management 4 (3), 338-365, 2008 | 26 | 2008 |
Applied Design of Experiments and Taguchi Methods; PHI Learning Pvt K Krishnaiah, P Shahabudeen Ltd.: Delhi, India, 2012 | 23 | 2012 |
Algorithms for the design of a multi-stage adaptive kanban system GD Sivakumar, P Shahabudeen International Journal of Production Research 47 (23), 6707-6738, 2009 | 20 | 2009 |
Bi-criteria improved genetic algorithm for scheduling in flowshops to minimise makespan and total flowtime of jobs R Rajkumar, P Shahabudeen International Journal of Computer Integrated Manufacturing 22 (10), 987-998, 2009 | 20 | 2009 |
Ant colony optimisation for multi-level assembly job shop scheduling M Omkumar, P Shahabudeen International Journal of Manufacturing Research 4 (4), 410-427, 2009 | 19 | 2009 |
An analysis of re-configured blood transfusion network of urban india to improve the service level: a simulation approach S Selvakumar, P Shahabudeen, T Paul Robert Journal of Medical Systems 43, 1-8, 2019 | 16 | 2019 |