Storage space allocation in container terminals C Zhang, J Liu, Y Wan, KG Murty, RJ Linn Transportation Research Part B: Methodological 37 (10), 883-903, 2003 | 594 | 2003 |
Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling BL Maccarthy, J Liu The International Journal of Production Research 31 (1), 59-79, 1993 | 572 | 1993 |
A review of planning and scheduling systems and methods for integrated steel production L Tang, J Liu, A Rong, Z Yang European Journal of operational research 133 (1), 1-20, 2001 | 540 | 2001 |
A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron & Steel Complex L Tang, J Liu, A Rong, Z Yang European Journal of Operational Research 124 (2), 267-282, 2000 | 522 | 2000 |
A decision support system for operations in a container terminal KG Murty, J Liu, Y Wan, R Linn Decision support systems 39 (3), 309-332, 2005 | 449 | 2005 |
Dynamic crane deployment in container storage yards C Zhang, Y Wan, J Liu, RJ Linn Transportation Research Part B: Methodological 36 (6), 537-555, 2002 | 392 | 2002 |
A mathematical programming model for scheduling steelmaking-continuous casting production L Tang, J Liu, A Rong, Z Yang European Journal of Operational Research 120 (2), 423-435, 2000 | 342 | 2000 |
Differential evolution with an individual-dependent mechanism L Tang, Y Dong, J Liu IEEE Transactions on Evolutionary Computation 19 (4), 560-574, 2014 | 306 | 2014 |
An improved differential evolution algorithm for practical dynamic scheduling in steelmaking-continuous casting production L Tang, Y Zhao, J Liu IEEE Transactions on Evolutionary Computation 18 (2), 209-225, 2013 | 291 | 2013 |
Steel-making process scheduling using Lagrangian relaxation L Tang, PB Luh, J Liu, L Fang International Journal of Production Research 40 (1), 55-70, 2002 | 287 | 2002 |
Constructive and composite heuristic solutions to the P//∑ Ci scheduling problem J Liu, CR Reeves European Journal of Operational Research 132 (2), 439-452, 2001 | 272 | 2001 |
Quay crane scheduling at container terminals to minimize the maximum relative tardiness of vessel departures J Liu, Y Wan, L Wang Naval Research Logistics (NRL) 53 (1), 60-74, 2006 | 209 | 2006 |
The assignment of storage locations to containers for a container stack Y Wan, J Liu, PC Tsai Naval Research Logistics (NRL) 56 (8), 699-713, 2009 | 163 | 2009 |
Hongkong International Terminals gains elastic capacity using a data-intensive decision-support system KG Murty, Y Wan, J Liu, MM Tseng, E Leung, KK Lai, HWC Chiu Interfaces 35 (1), 61-75, 2005 | 143 | 2005 |
A new classification scheme for flexible manufacturing systems BL MacCarthy, J Liu The International Journal of Production Research 31 (2), 299-309, 1993 | 142 | 1993 |
Mixed truck delivery systems with both hub-and-spoke and direct shipment J Liu, CL Li, CY Chan Transportation Research Part E: Logistics and Transportation Review 39 (4 …, 2003 | 136 | 2003 |
Modeling and solution of the joint quay crane and truck scheduling problem L Tang, J Zhao, J Liu European Journal of Operational Research 236 (3), 978-990, 2014 | 132 | 2014 |
Rubber tired gantry crane deployment for container yard operation R Linn, J Liu, Y Wan, C Zhang, KG Murty Computers & Industrial Engineering 45 (3), 429-442, 2003 | 125 | 2003 |
A neural network model and algorithm for the hybrid flow shop scheduling problem in a dynamic environment L Tang, W Liu, J Liu Journal of Intelligent Manufacturing 16, 361-370, 2005 | 121 | 2005 |
A new Lagrangian relaxation algorithm for hybrid flowshop scheduling to minimize total weighted completion time L Tang, H Xuan, J Liu Computers & Operations Research 33 (11), 3344-3359, 2006 | 119 | 2006 |