Analisis Penanganan Kerusakan Jalan Dengan Menggunakan Metode Bina Marga Dan Pci (Pavement Condition Index) N Salsabilla, N Sebayang, EI Imananto SONDIR 4 (1), 1-10, 2020 | 12 | 2020 |
Pengaruh Penutupan Palang Pintu Perlintasan Kereta Api Terhadap Kinerja Lalu Lintas Pada Simpang Tak Bersinyal di Kota Malang RDC Efendi, N Sebayang, TH Nainggolan Student Journal GELAGAR 2 (2), 45-53, 2020 | 10 | 2020 |
Analisis Kerusakan Jalan Dengan Menggunakan Metode Pci (Pavement Condition Index), Sdi (Surface Distress Index) Dan Iri (International Roughness Index) E Pasha, N Sebayang, A Ma'ruf Student Journal GELAGAR 4 (2), 153-162, 2022 | 9 | 2022 |
STUDI EVALUASI KINERJA PELAYANAN DAN TARIF MODA ANGKUTAN SUNGAI SPEEDBOAT Studi Kasus: Jalur Angkutan Sungai Kecamatan Kurun ke Kota Palangkaraya, Kalimantan Tengah N Sebayang, R Effendie Spectra 5 (10), 2007 | 7 | 2007 |
EVALUASI KINERJA SIMPANG BERSINYAL MENGGUNAKAN METODE PKJI 2014 DAN SOFTWARE VISSIM 11 AS Indrian, N Sebayang, M Erfan Student Journal Gelagar 4 (2), 236-246, 2022 | 6 | 2022 |
Penentuan Skala Prioritas Pemilihan Jenis Perkerasan jalan dengan Metode Analitycal Hierarchy Process pada proyek Preservasi Rekonstruksi Jalan Sidoarjo–Pandaan–Purwosari … KY Prahastyo, N Sebayang, LK Wulandari INFOMANPRO 8 (2), 1-16, 2019 | 5 | 2019 |
Analisis Kondisi Jalan Jaringan Jalan Menggunakan Metode Bina Marga TH Nainggolan, N Sebayang, A Ma’ruf Prosiding SEMSINA 3 (1), 106-112, 2022 | 4 | 2022 |
ANALISIS KARAKTERISTIK PARKIR KENDARAAN PADA AREA PARKIR RSUD dr. MOHAMAD SALEH KOTA PROBOLINGGO TH Nainggolan, N Sebayang, NGDJ Henrique, IN Sudiasa SONDIR 5 (2), 79-86, 2021 | 3 | 2021 |
Evaluasi Kinerja Simpang Bersinyal Dengan Metode PKJI 2014 dan VISSIM D Missa, N Sebayang, M Erfan Student Journal Gelagar 3 (2), 151-162, 2021 | 3 | 2021 |
Analisis Dampak Lalu Lintas Pembangunan RSUD Baru Kota Probolinggo Terhadap Kinerja Jaringan Jalan N Sebayang, TH Naingglan, A Ma’aruf Prosiding SEMSINA, 39-58, 2020 | 3 | 2020 |
Faktor-Faktor Yang Mempengaruhi Terhadap Berkurangnya Umur Rencana Konstruksi Jalan Hotmix Di Kabupaten Tulungagung NS Guminto, M Wijayaningtyas Infomanpro 9 (2), 17-27, 2020 | 3 | 2020 |
Pengaruh penambahan karet alam pada campuran aspal beton lapis aus dengan filler Fly Ash A Afriaziz, N Sebayang, E Priskasari Student Journal Gelagar 1 (1), 1-6, 2019 | 3 | 2019 |
Analisa Konsep Nilai Hasil Pada Proyek Pembangunan Konstruksi Gedung Pada Gereja WL Dewi, LAR Winanda, HS Wibawanto, N Sebayang, L Kurniawati Seminar Nasional Teknik Sipil 1 (1), 96-101, 2023 | 2 | 2023 |
Sustainable Construction: Optimization of Road Potholes Repair with Polymer Mix Aggregates M Wijayaningtyas, H Sujatmiko, N Sebayang Civil Engineering and Architecture 11 (1), 2022 | 2 | 2022 |
Application of Analytic Hierarchy Process Method in Determining The Priority Weights of Road Pavement Planning Criteria On The Project Preservation of Reconstruction of The … KY Prahastyo, N Sebayang, LK Wulandari INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH 9 (12), 212-221, 2020 | 2 | 2020 |
Perencanaan Peningkatan Perkerasan Lentur Dan Perkiraan Rencana Anggaran Biaya Pada Pembangunan Jalan Maruni-Mameh DML Atbar, N Sebayang, A Ma'ruf Student Journal Gelagar 1 (1), 32-43, 2019 | 2 | 2019 |
Pengembangan Model Optimasi Offset Sinyal Lampu Isyarat Lalu Lintas pada Jaringan ATCS (Area Traffic Control System) Berbentuk Grid Menggunakan Model Transmisi Sel (Cell … N Sebayang, H Sulistio, L Djakfar, A Wicaksono The 18th FSTPT International Symposium, Unila, Bandar Lampung, 2015 | 2 | 2015 |
Rekayasa nilai (value engineering) pada proyek Pengembangan Jaringan Jalan Trans Selatan-Selatan Pulau Jawa M Rozi, N Sebayang, LK Wulandari INFOMANPRO 11 (2), 44-49, 2022 | 1 | 2022 |
Evaluasi Kinerja Dua Simpang Bersinyal Berdekatan Menggunakan Program Ptv Vissim 11 Y Semiun, N Sebayang, T Nainggolan Student Journal Gelagar 3 (1), 35-45, 2021 | 1 | 2021 |
Desain Teknologi Ipal Sistem Anaerobic Baffle Reactor Di Kelurahan Gunung Sari Kecamatan Pasangkayu Kabupaten Mamuju Utara Sulawesi Barat S Surbakti, N Sebayang, IW Mundra SONDIR 4 (2), 70-84, 2020 | 1 | 2020 |