Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method D Castro-Lacouture, GA Süer, J Gonzalez-Joaqui, JK Yates Journal of Construction Engineering and Management 135 (10), 1096-1104, 2009 | 114 | 2009 |
Designing parallel assembly lines GA Süer Computers & industrial engineering 35 (3-4), 467-470, 1998 | 100 | 1998 |
Optimal operator assignment and cell loading in labor-intensive manufacturing cells GA Süer Computers & industrial engineering 31 (1-2), 155-158, 1996 | 100 | 1996 |
Design of dedicated, shared and remainder cells in a probabilistic demand environment GA Süer, J Huang, S Maddisetty International journal of production research 48 (19), 5613-5646, 2010 | 85 | 2010 |
Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells GA Süer, RR Tummaluri International Journal of Production Research 46 (2), 469-493, 2008 | 85 | 2008 |
Stochastic skill-based manpower allocation in a cellular manufacturing system G Egilmez, B Erenay, GA Süer Journal of Manufacturing Systems 33 (4), 578-588, 2014 | 83 | 2014 |
Optimal operator assignment and cell loading when lot-splitting is allowed GA Süer, IS Bera Computers & Industrial Engineering 35 (3-4), 431-434, 1998 | 79 | 1998 |
Stochastic mixed-model assembly line sequencing problem: Mathematical modeling and Q-learning based simulated annealing hyper-heuristics H Mosadegh, SMTF Ghomi, GA Süer European Journal of Operational Research 282 (2), 530-544, 2020 | 75 | 2020 |
A dispatching rule-based genetic algorithm for multi-objective job shop scheduling using fuzzy satisfaction levels J Huang, GA Süer Computers & Industrial Engineering 86, 29-42, 2015 | 75 | 2015 |
Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells GA Süer, C Dagli Computers & Industrial Engineering 48 (3), 643-655, 2005 | 72 | 2005 |
Stochastic cellular manufacturing system design subject to maximum acceptable risk level G Egilmez, GA Süer, J Huang Computers & Industrial Engineering 63 (4), 842-854, 2012 | 71 | 2012 |
Effects of Different Fuzzy Operators on Fuzzy Bi-objective Cell Loading Problem in Labor Intensive Manufacturing Cells GA Suer, F Arikan, C Babayigit Proceedings of the 35th International Conference on Computers and Industrial …, 2005 | 70* | 2005 |
Evaluation of manufacturing cell loading rules for independent cells GA Suer, M Saiz, W Gonzalez International Journal of Production Research 37 (15), 3445-3468, 1999 | 62 | 1999 |
Effective multiobjective EDA for bi-criteria stochastic job-shop scheduling problem X Hao, M Gen, L Lin, GA Suer Journal of intelligent Manufacturing 28, 833-845, 2017 | 58 | 2017 |
Minimizing the number of tardy jobs in identical machine scheduling GA Süer, E Báez, Z Czajkiewicz Computers & Industrial Engineering 25 (1-4), 243-246, 1993 | 55 | 1993 |
A hybrid method of 2-TSP and novel learning-based GA for job sequencing and tool switching problem E Ahmadi, B Goldengorin, GA Süer, H Mosadegh Applied Soft Computing 65, 214-229, 2018 | 51 | 2018 |
Models for cell loading and product sequencing in labor-intensive cells GA Süer, J Cosner, A Patten Computers & Industrial Engineering 56 (1), 97-105, 2009 | 51 | 2009 |
Manufacturing cell loading rules and algorithms for connected cells GA Süer, M Saiz, C Dagli, W Gonzalez Manufacturing Research and Technology 24, 97-127, 1995 | 47 | 1995 |
Comparison of layered cellular manufacturing system design approaches B Erenay, GA Suer, J Huang, S Maddisetty Computers & Industrial Engineering 85, 346-358, 2015 | 42 | 2015 |
Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour intensive manufacturing cells GA Süer, F Arikan, C Babayiğit International Journal of Production Research 46 (2), 371-404, 2008 | 42 | 2008 |