关注
Joseph J. Pignatiello
Joseph J. Pignatiello
Air Force Institute of Technology
没有经过验证的电子邮件地址
标题
引用次数
引用次数
年份
Comparisons of Multivariate CUSUM Charts
JJ Pignatiello Jr, GC Runger
Journal of quality technology 22 (3), 173-186, 1990
7531990
Strategies for robust multiresponse quality engineering
JJ Pignatiello Jr
IIE transactions 25 (3), 5-15, 1993
5811993
An overview of the strategy and tactics of Taguchi
JR JOSEPH J PIGNATIELLO
IIE transactions 20 (3), 247-254, 1988
2411988
Adaptive sampling for process control
GC Runger, JJ Pignatiello Jr
Journal of Quality Technology 23 (2), 135-155, 1991
2351991
A genetic algorithm approach to multiple-response optimization
F Ortiz Jr, JR Simpson, JJ Pignatiello Jr, A Heredia-Langner
Journal of quality technology 36 (4), 432-450, 2004
1982004
Estimation of the change point of a normal process mean in SPC applications
JJ Pignatiello Jr, TR Samuel
Journal of Quality technology 33 (1), 82-95, 2001
1972001
Identifying the time of a step change with X control charts
TR Samuel, JJ Pignatiello Jr, JA Calvin
Quality Engineering 10 (3), 521-527, 1998
1871998
Top ten triumphs and tragedies of Genichi Taguchi
JJ Pignatiello Jr, JS Ramberg
Quality Engineering 4 (2), 211-225, 1991
1601991
A comparison of control charting procedures for monitoring process dispersion
CA Acosta-Mejia, JJ Pignatiello, BV Rao
IIE transactions 31 (6), 569-579, 1999
1561999
Discussion on Kackar's paper
JJ Pignatiello, JS Ramberg
Journal of Quality Technology 17 (4), 198-209, 1985
153*1985
Statistical process monitoring of nonlinear profiles using wavelets
E Chicken, JJ Pignatiello Jr, JR Simpson
Journal of Quality Technology 41 (2), 198-212, 2009
1462009
Identifying the time of a step change in a normal process variance
TR Samuel, JJ Pignatiello Jr, JA Calvin
Quality Engineering 10 (3), 529-538, 1998
1151998
Estimating the change point of a Poisson rate parameter with a linear trend disturbance
MB Perry, JJ Pignatiello Jr, JR Simpson
Quality and Reliability Engineering International 22 (4), 371-384, 2006
952006
The performance of control charts for monitoring process dispersion
JJ Pignatiello Jr, CA Acosta-Mejia, BV Rao
Proceedings of the 4th Industrial Engineering Research Conference, 320-328, 1995
801995
On Estimating Control Chart Limits
G Nedumaran, JJ Pignatiello Jr
Journal of Quality Technology 33 (2), 206-212, 2001
782001
Identifying the time of a step-change in the process fraction nonconforming
JJ Pignatiello Jr, TR Samuel
Quality Engineering 13 (3), 357-365, 2001
782001
Estimation of the change point of a normal process mean with a linear trend disturbance in SPC
MB Perry, JJ Pignatiello Jr
Quality Technology & Quantitative Management 3 (3), 325-334, 2006
772006
Identifying the time of a step-change with x 2 control charts
G Nedumaran, JJ Pignatiello Jr, JA Calvin
Quality Engineering 13 (2), 153-159, 2000
76*2000
Estimating the change point of the process fraction non‐conforming with a monotonic change disturbance in spc
MB Perry, JJ Pignatiello Jr, JR Simpson
Quality and Reliability Engineering International 23 (3), 327-339, 2007
722007
The development and evaluation of CUSUM-based control charts for an AR (1) process
DH Timmer, J Pignatiello Jr, M Longnecker
IIE transactions 30 (6), 525-534, 1998
691998
系统目前无法执行此操作,请稍后再试。
文章 1–20