Minimizing makespan on parallel machines subject to release dates and delivery times A Gharbi, M Haouari Journal of scheduling 5 (4), 329-355, 2002 | 96 | 2002 |
Optimal scheduling of a two-stage hybrid flow shop M Haouari, L Hidri, A Gharbi Mathematical Methods of Operations Research 64 (1), 107-124, 2006 | 95 | 2006 |
Optimal parallel machines scheduling with availability constraints A Gharbi, M Haouari Discrete Applied Mathematics 148 (1), 63-87, 2005 | 66 | 2005 |
Tight bounds for the identical parallel machine scheduling problem M Haouari, A Gharbi, M Jemmali International Transactions in Operational Research 13 (6), 529-548, 2006 | 57 | 2006 |
Scheduling IT staff at a bank: a mathematical programming approach M Labidi, M Mrad, A Gharbi, MA Louly The Scientific World Journal 2014 (1), 768374, 2014 | 37 | 2014 |
The two-machine flowshop scheduling problem with sequence-independent setup times: New lower bounding strategies A Gharbi, T Ladhari, MK Msakni, M Serairi European Journal of Operational Research 231 (1), 69-78, 2013 | 31 | 2013 |
An improved max-flow-based lower bound for minimizing maximum lateness on identical parallel machines M Haouari, A Gharbi Operations Research Letters 31 (1), 49-52, 2003 | 30 | 2003 |
An approximate decomposition algorithm for scheduling on parallel machines with heads and tails A Gharbi, M Haouari Computers & operations research 34 (3), 868-883, 2007 | 27 | 2007 |
Energetic reasoning revisited: application to parallel machine scheduling L Hidri, A Gharbi, M Haouari Journal of scheduling 11, 239-252, 2008 | 24 | 2008 |
Lower bounds for scheduling on identical parallel machines with heads and tails M Haouari, A Gharbi Annals of Operations Research 129, 187-204, 2004 | 23 | 2004 |
Fast lifting procedures for the bin packing problem M Haouari, A Gharbi Discrete Optimization 2 (3), 201-218, 2005 | 22 | 2005 |
Jackson's semi-preemptive scheduling on a single machine A Gharbi, M Labidi Computers & Operations Research 37 (12), 2082-2088, 2010 | 14 | 2010 |
Two-stage no-wait hybrid flow shop with inter-stage flexibility for operating room scheduling MN Azaiez, A Gharbi, I Kacem, Y Makhlouf, M Masmoudi Computers & Industrial Engineering 168, 108040, 2022 | 13 | 2022 |
New efficient lower bound for the hybrid flow shop scheduling problem with multiprocessor tasks L Hidri, A Gharbi IEEE access 5, 6121-6133, 2017 | 12 | 2017 |
A computational study of the two-machine no-wait flow shop scheduling problem subject to unequal release dates and non-availability constraints M Labidi, A Kooli, T Ladhari, A Gharbi, US Suryahatmaja IEEE Access 6, 16294-16304, 2018 | 11 | 2018 |
Minimizing expected attacking cost in networks A Gharbi, MN Azaiez, M Kharbeche Electronic Notes in Discrete Mathematics 36, 947-954, 2010 | 10 | 2010 |
Statistical modeling of emergency medical services’ response and rescue times to road traffic crashes in the Kingdom of Saudi Arabia A Al-Zabidi, M Almannaa, M Elhenawy, A Gharbi Case Studies on Transport Policy 10 (4), 2563-2575, 2022 | 9 | 2022 |
Bounding strategies for scheduling on identical parallel machines M Haouari, A Gharbi, M Jemmali 2006 international conference on service systems and service management 2 …, 2006 | 9 | 2006 |
Physician scheduling using goal programming-an application to a large hospital in Saudi Arabia A Gharbi, M Louly, MN Azaiez 2017 4th international conference on control, decision and information …, 2017 | 8 | 2017 |
The nonpermutation flowshop scheduling problem: adjustment and bounding procedures A Gharbi, M Labidi, MA Louly Journal of Applied Mathematics 2014 (1), 273567, 2014 | 7 | 2014 |