Cellular manufacturing design 1996–2021: A review and introduction to applications of Industry 4.0 R YounesSinaki, A Sadeghi, H Mosadegh, N Almasarwah, G Suer International Journal of Production Research 61 (16), 5585-5636, 2023 | 21 | 2023 |
Minimizing the number of tardy jobs on identical parallel machines subject to periodic maintenance A Najat, C Yuan, S Gursel, Y Tao Procedia Manufacturing 38, 1409-1416, 2019 | 17 | 2019 |
Flexible flowshop design in cellular manufacturing systems N Almasarwah, G Süer Procedia Manufacturing 39, 991-1001, 2019 | 13 | 2019 |
A two-phase algorithm to solve a 3-dimensional pallet loading problem M Singh, N Almasarwah, G Süer Procedia Manufacturing 39, 1474-1481, 2019 | 12 | 2019 |
Application of Machine Learning Methods for Pallet Loading Problem BL Aylak, M İnce, O Oral, G Süer, N Almasarwah, M Singh, B Salah Applied Sciences 11 (18), 8304, 2021 | 11 | 2021 |
Collaborative robots’ assembly system in the manufacturing area, assembly system 4.0 N Almasarwah, E Abdelall, GA Suer, J Pagan, Y You The International Journal of Advanced Manufacturing Technology 122 (2), 1069 …, 2022 | 10 | 2022 |
Consideration of processing time dissimilarity in batch-cyclic scheduling of flowshop cells N Almasarwah, GA Süer International Journal of Production Research 59 (21), 6544-6563, 2021 | 10 | 2021 |
Product Scheduling in a Flowshop Cell N Almasarwah, G Süer Procedia Manufacturing 17, 206-213, 2018 | 8 | 2018 |
Assembly System 4.0: Human-Robot Collaboration in Assembly Operations GA Suer, N Almasarwah, J Pagan, Y You IFIP International Conference on Advances in Production Management Systems …, 2021 | 7 | 2021 |
Multi-objective scheduling in labor-intensive manufacturing systems G Süer, N Almasarwah, O Alhawari, C Davis Journal of Manufacturing Systems 57, 469-483, 2020 | 4 | 2020 |
Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems N Almasarwah, G Suer Computers and Industrial Engineering Conference, 2017 | 3 | 2017 |
Pallet loading optimization considering storage time and relative humidity N Almasarwah, E Abdelall, G Suer, G Egilmez, M Singh, S Ramadan Journal of Industrial Engineering and Management 16 (2), 453-471, 2023 | 2 | 2023 |
Human-Cyber-Physical Disassembly Workstation 5.0 for Sustainable Manufacturing N Almasarwah, E Abdelall, M Saraireh, S Ramadan 2022 International Conference on Emerging Trends in Computing and …, 2022 | 2 | 2022 |
Multi-Stage Cellular Manufacturing System Design under Certain and Uncertain Conditions NE Almasarwah Ohio University, 2020 | 2 | 2020 |
An Accurate and Robust Genetic Algorithm to Minimize the Total Tardiness in Parallel Machine Scheduling Problems SZ Ramadan, N Almasarwah, ES Abdelall, GA Suer, NT Albashabsheh Management and Production Engineering Review 14, 2023 | 1 | 2023 |
Minimizing Average Flow Time subject to Minimum Number of Cells and No Tardy Jobs G Suer, N Al-masarwah, O Alhawari, C Davis ACMSA Conference, 2017 | 1 | 2017 |
Family Formation, Loading and Batch-Cyclic Flowshop Scheduling in Cellular Manufacturing Systems NE Almasarwah Ohio University, 2017 | 1 | 2017 |
Task allocation decisions at human–robot two-sided disassembly line 4.0 and SERU disassembly units N Almasarwah International Journal on Interactive Design and Manufacturing (IJIDeM), 1-17, 2024 | | 2024 |
AN INVESTIGATION OF ACTIVITY TRACKERS’ POTENTIAL HARMFUL IMPACTS ON MENTAL HEALTH AND FACTORS CONTROLLING USER INTENTION FOR ADOPTABILITY ANDSB ESRAA S. ABDELALL, NAJAT ALMASARWAH , RICHARD T. STONE, FATIMA MGAEDEH ... 50th International Conference on Computers and Industrial Engineering …, 2023 | | 2023 |
JOB SHOP BATCH-CYCLIC SCHEDULING METHOD IN THE MANUFACTURING AREA N ALMASARWAH, E ABDELALL, AA ALSARAYREH 50th International Conference on Computers and Industrial Engineering …, 2023 | | 2023 |