The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components F Bosché, M Ahmed, Y Turkan, CT Haas, R Haas Automation in Construction 49, 201-213, 2015 | 513 | 2015 |
Automated progress tracking using 4D schedule and 3D sensing technologies Y Turkan, F Bosche, CT Haas, R Haas Automation in construction 22, 414-421, 2012 | 451 | 2012 |
Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system F Bosché, A Guillemet, Y Turkan, CT Haas, R Haas Journal of computing in civil engineering 28 (4), 05014004, 2014 | 235 | 2014 |
IFC BIM-based facility management approach to optimize data collection for corrective maintenance F Shalabi, Y Turkan Journal of performance of constructed facilities 31 (1), 04016081, 2017 | 166 | 2017 |
Mobile augmented reality for teaching structural analysis Y Turkan, R Radkowski, A Karabulut-Ilgu, AH Behzadan, A Chen Advanced Engineering Informatics 34, 90-100, 2017 | 158 | 2017 |
Toward automated earned value tracking using 3D imaging tools Y Turkan, F Bosché, CT Haas, R Haas Journal of construction engineering and management 139 (4), 423-433, 2013 | 151 | 2013 |
A BIM-based simulation framework for fire safety management and investigation of the critical factors affecting human evacuation performance Q Sun, Y Turkan Advanced Engineering Informatics 44, 101093, 2020 | 114 | 2020 |
Bridge construction progress monitoring using lidar and 4D design models N Puri, Y Turkan Automation in Construction 109, 102961, 2020 | 97 | 2020 |
Adaptive wavelet neural network for terrestrial laser scanner-based crack detection Y Turkan, J Hong, S Laflamme, N Puri Automation in construction 94, 191-202, 2018 | 82 | 2018 |
Tracking of secondary and temporary objects in structural concrete work Y Turkan, FN Bosche, CT Haas, H Ralph Construction Innovation: Information, Process, Management 14 (2), 2014 | 75 | 2014 |
System requirements for electrically conductive concrete heated pavements H Abdualla, H Ceylan, S Kim, K Gopalakrishnan, PC Taylor, Y Turkan Transportation Research Record 2569 (1), 70-79, 2016 | 68 | 2016 |
Lessons from using BIM to increase design-construction integration GP Luth, A Schorer, Y Turkan Practice periodical on structural design and construction 19 (1), 103-110, 2014 | 52 | 2014 |
Assessment of compliance of dimensional tolerances in concrete slabs using TLS data and the 2D continuous wavelet transform N Puri, E Valero, Y Turkan, F Bosché Automation in construction 94, 62-72, 2018 | 51 | 2018 |
BrIM and UAS for bridge inspections and management Y Xu, Y Turkan Engineering, Construction and Architectural Management 27 (3), 785-807, 2020 | 50 | 2020 |
Tracking secondary and temporary concrete construction objects using 3D imaging technologies Y Turkan, F Bosché, CT Haas, R Haas Computing in Civil Engineering (2013), 749-756, 2013 | 47 | 2013 |
Toward Automated Spatial Change Analysis of MEP Components using 3D Point Clouds and As-Designed BIM Models VS Kalasapudi, Y Turkan, P Tang 2014 Workshop on 3D Computer Vision in the Built Environment, 2014 | 43 | 2014 |
Scan-to-BIM – An Overview of the Current State of the Art and a Look Ahead H Son, C Kim, Y Turkan 2015 The International Symposium on Automation and Robotics in Construction …, 2015 | 42 | 2015 |
Civil integrated management: An emerging paradigm for civil infrastructure project delivery and management F Guo, CT Jahren, Y Turkan, H David Jeong Journal of Management in Engineering 33 (2), 04016044, 2017 | 40 | 2017 |
Revealing safety risks of unmanned aerial vehicles in construction M Namian, M Khalid, G Wang, Y Turkan Transportation research record 2675 (11), 334-347, 2021 | 37 | 2021 |
Electronic document management systems for the transportation construction industry F Guo, CT Jahren, Y Turkan International Journal of Construction Education and Research 17 (1), 52-67, 2021 | 36 | 2021 |