Reliability analysis of identical two-unit parallel CC plant system operative with full installed capacity AG Mathew, SM Rizwan, MC Majumder, KP Ramachandran, G Taneja International Journal of Performability Engineering 7 (2), 179, 2011 | 49 | 2011 |
Reliability modelling and analysis of a two unit continuous casting plant AG Mathew, SM Rizwan, MC Majumder, KP Ramachandran Journal of the Franklin Institute 348 (7), 1488-1505, 2011 | 48 | 2011 |
Comparative analysis between profits of the two models of a CC plant AG Mathew, SM Rizwan, MC Majumder, KP Ramachandran, G Taneja AIP Conference Proceedings 1298 (1), 226-231, 2010 | 24 | 2010 |
Profit Evaluation of a Single Unit CC Plant with Scheduled Maintenance KPRGT A.G. Mathew, S.M. Rizwan, M.C. Majumder Caledonian Journal of Engineering 5 (1), 25-33, 2009 | 22 | 2009 |
Reliability Modeling and Analysis of a Two-Unit Parallel CC Plant with Different Installed Capacities KPRGT A.G. Mathew, S.M. Rizwan, M.C. Majumder Journal of Manufacturing Engineering 5 (3), 197-204, 2010 | 20 | 2010 |
MTSF and Availability of a two unit CC Plant AG Mathew, SM Rizwan, MC Majumder, KP Ramachandran proceedings of the International Conference on Modeling, Simulation and …, 2009 | 18 | 2009 |
Performance analysis of port cranes AGMSM Rizwan International Journal Of Core Engineering & Management 2 (1), 133-140, 2015 | 17 | 2015 |
Optimization of a single unit CC plant with scheduled maintenance policy AG Mathew, SM Rizwan, MC Majumder, KP Ramachandran, G Taneja Proceedings of the international conference on recent advances in material …, 2009 | 16 | 2009 |
Reliability and availability of a continuous casting plant SM Rizwan, AG Mathew, MC Majumder, KP Ramchandran 2008 IEEE International Conference on Industrial Engineering and Engineering …, 2008 | 7 | 2008 |
Reliability and Availability Assessment of a Centrifugal Pump STS Al-Amri, AG Mathew, SM Rizwan International Conference on Harnessing Technology. Caledonian College of …, 2011 | 4 | 2011 |
Reliability Modeling and Analysis of a Refinery Based Centrifugal Pump AGMSMR Saud Talib Saud Al - Amri Caledonian Journal of Engineering 7 (1), 38-42, 2011 | 3* | 2011 |
Probabilistic analysis of a desalination unit with nine failure categories SM Rizwan, N Padmavathi, G Taneja, AG Mathew, AM Al-Balushi Proceedings of World Congress on Engineering, 1877-1880, 2010 | 3 | 2010 |
Maintenance Analysis of Port Plc’s - A Case Study AGMSM Rizwan Caledonian Journal of Engineering 8 (2), 52-57, 2012 | 2* | 2012 |
Attaining Zero Failure Performance for GIV Gulfstream Aircraft through Reliability Modeling and Analysis M Ag, MN Al Alawi, J Collington International Journal of Advanced Scientific Engineering and Technological …, 2012 | 2 | 2012 |
A Probabilistic Approach to Monitoring Maintenance in Aviation Projects ASAGM M.N. Al Alawi International Journal of Scientific & Engineering Research 7 (10), 555-558, 2016 | | 2016 |
Evaluating Software Reliability in Port Equipments: a Case Study AGMSM Rizwan National Symposium on Innovations in Information Technology (NSIIT’15), 39-42, 2015 | | 2015 |
Design and Fabrication of Electrical Power Generation Using Shock Absorber AKSMAGM 1. Omar Salmin Huwayshei al Neimi, Ali Zaher Ali al Shariani National Conference on Emerging Trends and Innovations in Chemical & Process …, 2015 | | 2015 |
A Probabilistic Risk Analysis of an A.C. Air Compressor (Heavy Duty) AGMSMR Mohammed Al Maqbali 2nd NSEFYP, 2012 | | 2012 |
Attaining Zero Failure Performance for GIV Gulfstream Aircraft through Reliability Modeling and Analysis AGMJC M.N. Al Alawi International Journal of Advanced Scientific Engineering and Technological …, 2012 | | 2012 |
Professionalisation of family business: A conceptual framework K Ramachandran, A Mathew | | 2011 |