Application and extension of the Thruput II optimization model for airlift mobility RE Rosenthal, SF Baker, LT Weng, DF Fuller, D Goggins, AO Toy, ... Military Operations Research, 55-74, 1997 | 34 | 1997 |
Quality control chart design under Jidoka E Berk, AÖ Toy Naval Research Logistics (NRL) 56 (5), 465-477, 2009 | 21 | 2009 |
Single item lot-sizing problem for a warm/cold process with immediate lost sales E Berk, AÖ Toy, Ö Hazır European Journal of Operational Research 187 (3), 1251-1267, 2008 | 20 | 2008 |
Dynamic lot sizing for a warm/cold process: heuristics and insights AÖ Toy, E Berk International Journal of Production Economics 145 (1), 53-66, 2013 | 12 | 2013 |
Dynamic lot sizing problem for a warm/cold process AÖ Toy, E Berk IIE Transactions 38 (11), 1027-1044, 2006 | 11 | 2006 |
Energy systems and management AN Bilge, AÖ Toy, ME Günay Springer International Publishing, 2015 | 10 | 2015 |
An overview of energy technologies for a sustainable future AN Esen, Z Duzgit, AÖ Toy, ME Günay Energy Systems and Management, 1-16, 2015 | 6 | 2015 |
Intelligent supply chains through implementation of digital twins O Kulaç, B Ekren, AO Toy Intelligent and Fuzzy Systems: Digital Acceleration and The New Normal 504 …, 2022 | 5 | 2022 |
Special control charts using intelligent techniques: EWMA control charts B Aslan, Y Ekinci, AÖ Toy Intelligent Decision Making in Quality Management: Theory and Applications …, 2016 | 5 | 2016 |
Route prioritization for an airlift mobility optimization model AO Toy Master’s thesis, Naval Postgraduate School, Monterey, CA, 1996 | 5 | 1996 |
An efficient procedure for optimal maintenance intervention in partially observable multi-component systems O Karabağ, Ö Bulut, AÖ Toy, MM Fadıloğlu Reliability Engineering & System Safety 244, 109914, 2024 | 4 | 2024 |
Markovian decision process modeling approach for intervention planning of partially observable systems prone to failures O Karabağ, Ö Bulut, AÖ Toy International Conference on Intelligent and Fuzzy Systems, 497-504, 2022 | 4 | 2022 |
Fuzzy heuristic solution approaches for the warm/cold lot sizing problem A Altay, AO Toy, Y Ekinci Applied Soft Computing 48, 691-702, 2016 | 3 | 2016 |
A serial inventory system with lead-time-dependent backordering: A reduced-state approximation E Berk, AÖ Toy IISE Transactions 55 (3), 259-270, 2023 | 2 | 2023 |
Uniform Parallel Machine Scheduling with Sequence Dependent Setup Times: A Randomized Heuristic B Yıldız, L Kandiller, AÖ Toy Digitizing Production Systems: Selected Papers from ISPR2021, October 07-09 …, 2022 | 2 | 2022 |
Performance Comparison of Meta-heuristics for the Multiblock Warehouse Order Picking Problem Z Düzgit, AÖ Toy, AC Saner International Journal of Industrial Engineering Theory, Applications and …, 2021 | 2 | 2021 |
An Implementation of Flexible Job Shop Scheduling Problem in a Metal Processing Company AO Özkul, G Küçük, C Çelik, N Öztuna, M Demirkan, EÇ Nizam, ... Digital Conversion on the Way to Industry 4.0: Selected Papers from ISPR2020 …, 2021 | 2 | 2021 |
Production Planning at a Chocolate Company: A Two-Phase Approach by Aggregation Z Düzgit, AB Kuzuoğlu, H Kalelioğlu, H Kolay, MB Güler, S Akyol, AÖ Toy Proceedings of the International Symposium for Production Research 2019, 169-181, 2020 | 2 | 2020 |
Capacity Expansion Through Bottleneck Analysis for an OEM Company AA Bayraktar, G Coşkunseda, E Salman, AÖ Toy, NK Aygün The International Symposium for Production Research, 718-732, 2023 | 1 | 2023 |
Digital twins for decision making in supply chains O Kulac, BY Ekren, AO Toy Global Joint Conference on Industrial Engineering and Its Application Areas …, 2022 | 1 | 2022 |