Solving group scheduling problem in no-wait flexible flowshop with random machine breakdown A Adressi, S Tasouji Hassanpour, V Azizi Decision Science Letters 5 (1), 157-168, 2016 | 24 | 2016 |
A Time-Dependant Location-Routing Problem of Hazardous Material Transportation with Edge Unavailability and Time Window S Tasouji Hassanpour, G Y. Ke, D M.Tulett Journal of Cleaner Production, 128951, 2021 | 22 | 2021 |
Infectious waste management during a pandemic: A stochastic location-routing problem with chance-constrained time windows S Tasouji Hassanpour, GY Ke, J Zhao, DM Tulett Computers & Industrial Engineering, 109066, 2023 | 17 | 2023 |
Solving Re-entrant No-wait Flow Shop Scheduling Problem S Tasouji Hassanpour, MR Amin-Naseri, N Nahavandi International Journal of Engineering (IJE) 28 (6), 903-912, 2015 | 9* | 2015 |
Beta-backscattering thickness-meter design and evaluation with fuzzy TOPSIS method A Arjhangmehr, M Mohammadzadeh, SAH Feghhi, S Tasouji Hassanpour Nukleonika 59 (2), 53-59, 2014 | 3 | 2014 |
Solving group scheduling problem in no-wait flow shop with sequence dependent setup times A Adressi, R Bashirzadeh, V Azizi, S Tasouji Hassanpour Journal of Modern Processes in Manufacturing and Production 3 (1), 5-16, 2014 | 3 | 2014 |
Scheduling problem of virtual cellular manufacturing systems (VCMS); Using simulated annealing and genetic algorithm based heuristics ST Hassanpour, R Bashirzadeh, A Adressi, B Bahmankhah Journal of Modern Processes in Manufacturing and Production 3 (4), 2014 | 3 | 2014 |
A multi-stage decision framework for managing hazardous waste logistics with random release dates ST Hassanpour, GY Ke, J Zhao, DM Tulett Expert Systems with Applications 232, 120750, 2023 | 1 | 2023 |
Multi–Objective Robust Optimization for Index Tracking Portfolio Selection Problem S Tasouji Hassanpour, G Y. Ke, S Ordikhani GDN 2020, Local Proceedings, 2020 | | 2020 |
A Literature Review on Robust Vehicle Routing Problem with Time Windows S Tasouji Hassanpour, G Y. Ke ASAC 2020, Proceedings, 2020 | | 2020 |
Re-entrant No-wait Flow Shop Scheduling Problem S Tasouji Hassanpour, MR Amin-Naseri, A Adressi Journal of Industrial Engineering Research in Production Systems 4 (9), 271-279, 2017 | | 2017 |
Scheduling two-machine no-wait open shops to minimize makespan (In Persian) O Rajabi, S Tasouji Hassanpour Second National Conference on Industrial Engineering and Systems, 2014 | | 2014 |
A Solution for Virtual Cellular Manufacturing System's Scheduling Problem Using an Ant Colony Optimization Model (In Persian) S Tasouji Hassanpour, R Bashirzadeh, A Adressi 9th International Conference on Industrial Engineering, Tehran, Iran, 2013 | | 2013 |
THD minimization in cascade multi-level inverters with a few DC sources and optimum voltage levels S Tasouji Hassanpour, A Arjhangmehr, SAH Feghhi, E Mostafapour International Journal of Control 3 (2), 58-67, 2013 | | 2013 |