Proactive approach for stochastic RCMPSP based on multi-priority rule combinations XM Wang, QX Chen, N Mao, XD Chen, ZT Li International Journal of Production Research 53 (4), 1098-1110, 2015 | 40 | 2015 |
Meta-heuristics for Unrelated Parallel Machines Scheduling with Random Rework to Minimize Expected Total Weighted Tardiness XM Wang, ZT Li, QX Chen, N Mao Computers & Industrial Engineering 145, 2020 | 26 | 2020 |
Scheduling rules for two-stage flexible flow shop scheduling problem subject to tail group constraint ZT Li, QX Chen, N Mao, XM Wang, JJ Liu International Journal of Production Economics 146 (2), 667-678, 2013 | 20 | 2013 |
Home health care routing problem via off-line learning and neural network T Zhang, XT Yang, AL Yu, XM Wang Procedia CIRP 83, 193-197, 2019 | 11 | 2019 |
Approximation algorithms for the three-stage flexible flow shop problem with mid group constraint ZT Li, JJ Liu, QX Chen, N Mao, XM Wang Expert Systems with Applications 42 (7), 3571-3584, 2015 | 11 | 2015 |
Estimation of Mold Remaining Duration Considering Reworks XM Wang, QX Chen, N Mao, JJ Liu, ZT Li Journal of Mechanical Engineering 50 (7), 199-208, 2014 | 6* | 2014 |
A CTMDP-based exact method for RCPSP with uncertain activity durations and rework XM Wang, R Leus, S Creemers, QX Chen, N Mao Operations Research Proceedings 2017, 559-565, 2018 | 5 | 2018 |
Mould projects due-date forecast methods under random environment XM Wang, QX Chen, N Mao, JJ Liu Computer Integrated Manufacturing Systems 18 (2), 405-414, 2012 | 4 | 2012 |
Markov Theory-based Methods for Monitoring Mold Projects XM Wang Guangdong University of Technology, 2014 | 2* | 2014 |
Preemptive Scheduling of Design Tasks with Random Rework XG Wang, XM Wang, QX Chen, N Mao Industrial Engineering Journal 22 (5), 59-67, 2019 | 1 | 2019 |
Dynamic Scheduling of Task with Rework Process WY Chen, XM Wang Die & Mould Industry 44 (11), 9-14, 2018 | 1* | 2018 |
A comparative study of priority rules for mold project dynamic scheduling LAI Kai, W Xiaoming, C Qingxin, MAO Ning, C Xindu Industrial Engineering Journal 20 (5), 28, 2017 | 1 | 2017 |
Mold Projects Monitoring with Stochastics Resources and Durations XM Wang, QX Chen, N Mao, XD Chen Computer Integrated Manufacturing System 21 (5), 1315-1326, 2015 | 1* | 2015 |
Mould manufacturing grid service allocation algorithm considering heat batch problem ZZ Wang, N Mao, QX Chen, XM Wang, J Peng Computer Integrated Manufacturing System 18 (02), 0, 2012 | 1 | 2012 |
Preemptive scheduling of design projects with random rework and urgent tasks W Xiaoming, ZHU Songping, C Qingxin, MAO Ning Computer Integrated Manufacturing Systems, 2022 | | 2022 |
Parallel Machines Scheduling with Job-splitting Property and Family Setups ZHU Songping, W Xiaoming, YAN Minjie, C Qingxin, MAO Ning Industrial Engineering Journal 25 (01), 114-122, 2022 | | 2022 |
Myopic Strategy for Dynamic Scheduling of Printed Circuit Board Drilling Tasks YAN Minjie, W Xiaoming, ZHU Songping, C Qingxin, MAO Ning Industrial Engineering Journal 24 (6), 18-24+56, 2021 | | 2021 |
A Comparative Study of Priority Rules for Multi-project Scheduling with Public and Private Resource Constraints DU Hong-Fei, XM Wang, QX Chen, N Mao Industrial Engineering Journal 24 (05), 141-151, 2021 | | 2021 |
Mold Project Scheduling Based on Approximate Dynamic Programming XM Wang, QX Chen, N Mao Computer Integrated Manufacturing System 26 (6), 1691-1701, 2020 | | 2020 |
Analysis of Reviewing Strategies for Coupled Design Tasks with General Activity Durations and Rework MN Wang, XM Wang, QX Chen, N Mao Computer Integrated Manufacturing System 26 (5), 1336-1344, 2020 | | 2020 |