Factors influencing construction time and cost overruns on high-rise projects in Indonesia PF Kaming, PO Olomolaiye, GD Holt, FC Harris Construction Management & Economics 15 (1), 83-94, 1997 | 1252 | 1997 |
Using systems dynamics to better understand change and rework in construction project management systems PED Love, GD Holt, LY Shen, H Li, Z Irani International journal of project management 20 (6), 425-436, 2002 | 516 | 2002 |
Which contractor selection methodology? GD Holt International Journal of project management 16 (3), 153-164, 1998 | 490 | 1998 |
Triangulation in construction management research PED Love, GD Holt, H Li Engineering, construction and architectural management 9 (4), 294-303, 2002 | 320 | 2002 |
Cost overrun in the Malaysian construction industry projects: A deeper insight Z Shehu, IR Endut, A Akintoye, GD Holt International journal of project management 32 (8), 1471-1480, 2014 | 312 | 2014 |
Factors influencing craftsmen's productivity in Indonesia PF Kaming, PO Olomolaiye, GD Holt, FC Harris International journal of project management 15 (1), 21-30, 1997 | 293 | 1997 |
Asking questions, analysing answers: relative importance revisited GD Holt Construction Innovation 14 (1), 2-16, 2014 | 257 | 2014 |
Lowest price or value? Investigation of UK construction clients' tender selection process CH Wong, GD Holt, PA Cooper Construction management and economics 18 (7), 767-774, 2000 | 253 | 2000 |
Using national input/output data for embodied energy analysis of individual residential buildings GJ Treloar, PED Love, GD Holt Construction Management and Economics 19 (1), 49-61, 2001 | 252 | 2001 |
A review of contractor selection practice in the UK construction industry GD Holt, PO Olomolaiye, FC Harris Building and environment 30 (4), 553-561, 1995 | 252 | 1995 |
The learning organisation: toward a paradigm for mutually beneficial strategic construction alliances GD Holt, PED Love, H Li International journal of project management 18 (6), 415-421, 2000 | 234 | 2000 |
A survey of constraints on Iranian construction operatives' productivity M Zakeri, PO Olomolaiye, GD Holt, FC Harris Construction Management & Economics 14 (5), 417-426, 1996 | 234 | 1996 |
Construction business performance measurement: the SPM alternative PED Love, GD Holt Business process management journal 6 (5), 408-416, 2000 | 224 | 2000 |
Factors influencing UK construction clients' choice of contractor GD Holt, PO Olomolaiye, FC Harris Building and Environment 29 (2), 241-248, 1994 | 222 | 1994 |
Location optimization for a group of tower cranes P Zhang, FC Harris, PO Olomolaiye, GD Holt Journal of construction engineering and management 125 (2), 115-122, 1999 | 196 | 1999 |
FRP or steel plate-to-concrete bonded joints: effect of test methods on experimental bond strength JF Chen, ZJ Yang, GD Holt Steel and Composite Structures, An International Journal 1 (2), 231-244, 2001 | 167 | 2001 |
Evaluating prequalification criteria in contractor selection GD Holt, PO Olomolaiye, FC Harris Building and Environment 29 (4), 437-448, 1994 | 162 | 1994 |
Severity diagnosis of productivity problems—a reliability analysis PF Kaming, GD Holt, ST Kometa, PO Olomolaiye International Journal of Project Management 16 (2), 107-113, 1998 | 159 | 1998 |
Prequalification and multi-criteria selection: a measure of contractors' opinions P Jennings, GD Holt Construction Management & Economics 16 (6), 651-660, 1998 | 150 | 1998 |
Predictive maintenance techniques and their relevance to construction plant DJ Edwards, GD Holt, FC Harris Journal of Quality in Maintenance Engineering 4 (1), 25-37, 1998 | 150 | 1998 |