关注
Sakti Aji Lesmana
Sakti Aji Lesmana
Universitas Mercu Buana
在 mercubuana.ac.id 的电子邮件经过验证
标题
引用次数
引用次数
年份
Productivity Analysis in Assembly Department Using Objective Matrix (Omax) Method in Labor Intensive Manufacturing
SA Lesmana, D Junaedi, NE Triana
IJERAT 7 (07), 1-9, 2020
18*2020
Application of Lean Manufacturing to Optimize Working Space by Reducing Lead Time in the Production Department Using the Value Stream Mapping (VSM) Method
NE Triana, SA Lesmana
IJERAT 7 (07), 10-17, 2020
32020
Performance Analysis of Filling Machine Using Overall Equipment Effectiveness Metric in Beverage Company
D Junaedi, SA Lesmana, I Roswandi, A Bramastro
12023
Analysis of Productivity Improvement in production process using the single minutes exchange of dies (SMED) method
SA Lesmana
International Journal of Engineering Research and Advanced Technology 8 (01), 2022
12022
Pelatihan Penerapan Supply Chain Management untuk Meningkatkan Produktivitas Printing Sepatu
I Almahdy, SA Lesmana
IRA Jurnal Pengabdian Kepada Masyarakat (IRAJPKM) 2 (2), 29-34, 2024
2024
Identify Waste to Achieve Production Targets Using Value Stream Analysis Tool (VALSAT) Method
NE Triana, SA Lesmana, AG Arumsari
International Journal of Scientific and Applied Research (IJSAR), eISSN …, 2024
2024
Analysis of Material Unavailability in the Beside Table Production Process Using Root Cause Analysis (RCA) and 5S Methods in A Furniture Company
SA Lesmana, NE Triana
International Journal of Scientific and Applied Research (IJSAR), eISSN …, 2024
2024
Analysis of Work Positions in Microbiological Sample Testing in Food Industry Laboratories using the Rapid Whole Body Assessment (REBA) Method and Nordic Body Maps (NBM)
NE Triana, SA Lesmana
International Journal of Scientific and Applied Research (IJSAR), eISSN …, 2024
2024
Total Productive Maintenance (TPM) Implementation to Improve Machine Efficiency
NE Triana, SA Lesmana
2023
Lean Manufacturing Implementation to Reduce Waste Using the Waste Assessment Model Method in the Production Process
SA Lesmana
IJERAT 12 (12), 7-16, 2020
2020
Emergency Exit Facilities Analysis in Fire Emergency Conditions for Footwear Manufacturing: An Indonesian Case Study
SA Lesmana
IJERAT 11 (11), 26-31, 2020
2020
Measuring Workforce Quantity by using Workload Analysis and Full Time Equivalent Method
NE Triana, FABS Wijaya, SA Lesmana
JSAER 7 (07), 104-108, 2020
2020
Rekayasa Ulang Proses Produksi Untuk Mempercepat Waktu Proses (Studi Kasus pada PT. PIN)
S Aji Lesmana
BINUS, 2003
2003
系统目前无法执行此操作,请稍后再试。
文章 1–13