Productivity Analysis in Assembly Department Using Objective Matrix (Omax) Method in Labor Intensive Manufacturing SA Lesmana, D Junaedi, NE Triana IJERAT 7 (07), 1-9, 2020 | 18* | 2020 |
Application of Lean Manufacturing to Optimize Working Space by Reducing Lead Time in the Production Department Using the Value Stream Mapping (VSM) Method NE Triana, SA Lesmana IJERAT 7 (07), 10-17, 2020 | 3 | 2020 |
Performance Analysis of Filling Machine Using Overall Equipment Effectiveness Metric in Beverage Company D Junaedi, SA Lesmana, I Roswandi, A Bramastro | 1 | 2023 |
Analysis of Productivity Improvement in production process using the single minutes exchange of dies (SMED) method SA Lesmana International Journal of Engineering Research and Advanced Technology 8 (01), 2022 | 1 | 2022 |
Pelatihan Penerapan Supply Chain Management untuk Meningkatkan Produktivitas Printing Sepatu I Almahdy, SA Lesmana IRA Jurnal Pengabdian Kepada Masyarakat (IRAJPKM) 2 (2), 29-34, 2024 | | 2024 |
Identify Waste to Achieve Production Targets Using Value Stream Analysis Tool (VALSAT) Method NE Triana, SA Lesmana, AG Arumsari International Journal of Scientific and Applied Research (IJSAR), eISSN …, 2024 | | 2024 |
Analysis of Material Unavailability in the Beside Table Production Process Using Root Cause Analysis (RCA) and 5S Methods in A Furniture Company SA Lesmana, NE Triana International Journal of Scientific and Applied Research (IJSAR), eISSN …, 2024 | | 2024 |
Analysis of Work Positions in Microbiological Sample Testing in Food Industry Laboratories using the Rapid Whole Body Assessment (REBA) Method and Nordic Body Maps (NBM) NE Triana, SA Lesmana International Journal of Scientific and Applied Research (IJSAR), eISSN …, 2024 | | 2024 |
Total Productive Maintenance (TPM) Implementation to Improve Machine Efficiency NE Triana, SA Lesmana | | 2023 |
Lean Manufacturing Implementation to Reduce Waste Using the Waste Assessment Model Method in the Production Process SA Lesmana IJERAT 12 (12), 7-16, 2020 | | 2020 |
Emergency Exit Facilities Analysis in Fire Emergency Conditions for Footwear Manufacturing: An Indonesian Case Study SA Lesmana IJERAT 11 (11), 26-31, 2020 | | 2020 |
Measuring Workforce Quantity by using Workload Analysis and Full Time Equivalent Method NE Triana, FABS Wijaya, SA Lesmana JSAER 7 (07), 104-108, 2020 | | 2020 |
Rekayasa Ulang Proses Produksi Untuk Mempercepat Waktu Proses (Studi Kasus pada PT. PIN) S Aji Lesmana BINUS, 2003 | | 2003 |