关注
Olga Battaïa
标题
引用次数
引用次数
年份
A taxonomy of line balancing problems and their solutionapproaches
O Battaïa, A Dolgui
International Journal of Production Economics 142 (2), 259-277, 2013
8162013
Design, management and control of demanufacturing and remanufacturing systems
T Tolio, A Bernard, M Colledani, S Kara, G Seliger, J Duflou, O Battaia, ...
CIRP Annals 66 (2), 585-609, 2017
2322017
Reducing physical ergonomic risks at assembly lines by line balancing and job rotation: A survey
A Otto, O Battaïa
Computers & Industrial Engineering 111, 467-480, 2017
1892017
An exact solution approach for disassembly line balancing problem under uncertainty of the task processing times
ML Bentaha, O Battaïa, A Dolgui
International Journal of Production Research 53 (6), 1807-1818, 2015
1702015
Use of MCDM techniques in environmentally conscious manufacturing and product recovery: State of the art
MA Ilgin, SM Gupta, O Battaïa
Journal of Manufacturing Systems 37, 746-758, 2015
1642015
A sample average approximation method for disassembly line balancing problem under uncertainty
ML Bentaha, O Battaïa, A Dolgui
Computers & Operations Research 51, 111-122, 2014
1532014
An improved Lagrangian relaxation-based heuristic for a joint location-inventory problem
A Diabat, O Battaïa, D Nazzal
Computers & Operations Research 61, 170-178, 2015
1152015
Balancing of simple assembly lines under variations of task processing times
E Gurevsky, O Battaïa, A Dolgui
Annals of operations research 201, 265-286, 2012
1082012
Second order conic approximation for disassembly line design with joint probabilistic constraints
ML Bentaha, O Battaïa, A Dolgui, SJ Hu
European Journal of Operational Research 247 (3), 957-967, 2015
902015
Profit-oriented partial disassembly line design: dealing with hazardous parts and task processing times uncertainty
ML Bentaha, A Dolgui, O Battaïa, RJ Riggs, J Hu
International Journal of Production Research 56 (24), 7220-7242, 2018
882018
Collection-disassembly problem in reverse supply chain
MKK Habibi, O Battaïa, VD Cung, A Dolgui
International Journal of Production Economics 183, 334-344, 2017
852017
Disassembly line balancing and sequencing under uncertainty
ML Bentaha, O Battaïa, A Dolgui
Procedia Cirp 15, 239-244, 2014
842014
Design for manufacturing and assembly/disassembly: joint design of products and production systems
O Battaïa, A Dolgui, SS Heragu, SM Meerkov, MK Tiwari
International Journal of Production Research 56 (24), 7181-7189, 2018
832018
Dealing with uncertainty in disassembly line design
ML Bentaha, O Battaïa, A Dolgui, SJ Hu
CIRP Annals 63 (1), 21-24, 2014
832014
A MIP approach for balancing transfer line with complex industrial constraints
M Essafi, X Delorme, A Dolgui, O Guschinskaya
Computers & Industrial Engineering 58 (3), 393-400, 2010
822010
Decision support for design of reconfigurable rotary machining systems for family part production
O Battaïa, A Dolgui, N Guschinsky
International Journal of Production Research 55 (5), 1368-1385, 2017
812017
Disassembly line balancing under high variety of end of life states using a joint precedence graph approach
RJ Riggs, O Battaïa, SJ Hu
Journal of Manufacturing Systems 37, 638-648, 2015
802015
An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
L Capacho, R Pastor, A Dolgui, O Guschinskaya
Journal of Heuristics 15 (2), 109-132, 2009
722009
Stability measure for a generalized assembly line balancing problem
E Gurevsky, O Battaïa, A Dolgui
Discrete Applied Mathematics 161 (3), 377-394, 2013
702013
Workforce minimization for a mixed-model assembly line in the automotive industry
O Battaïa, X Delorme, A Dolgui, J Hagemann, A Horlemann, S Kovalev, ...
International Journal of Production Economics 170, 489-500, 2015
682015
系统目前无法执行此操作,请稍后再试。
文章 1–20